SIGNATURE HEIGHTS
RG-MH-00010 · RERA P49600000048 · Last updated on MahaRERA portal: 18 Aug 2021
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 70 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIGNATURE HEIGHTS is a Mixed project by SHRI BALAJI REALITY in Dadra & Nagar Haveli, registered with MahaRERA as P49600000048 on 27 Feb 2018. Possession was promised by 14 Dec 2020 and is now 70 months past that date. The completion date has moved by 12 months from the original filing. 26 of the 80 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameSIGNATURE HEIGHTS
- TypeMixed
- Location
- KILVANI NAKA
- SILVASSA
- Dadra & Nagar Haveli
- 396230
- Pincode396230
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49600000048
- ReraGenie IDRG-MH-00010
Builder
- NameSHRI BALAJI REALITY
- Entity typePartnership
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 Feb 2018
- Promised completion14 Dec 2020
- Revised completionRevised to 14 Dec 2020 (originally 15 Dec 2019)
- Buildings1 building record
- Documents filed38 files
Current status
Figures as on 18 Aug 2021, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIGNATURE HEIGHTS | NA | 12 | 10 | 68 | 12 | 80 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
SIGNATURE HEIGHTS: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities16
As on 18 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | No | Not applicable |
| MULTIPURPOSE HALL | No | Not applicable |
Parking filed68
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AJIT JARIWALA |
| Engineer | Dineshkumar patel |
| Chartered Accountant | NAVIN MONY JAIN |
| Chartered Accountant | SHRADHA VATSAL SHAH |
| Chartered Accountant | POONAM MURARKA |
| Partner | Role in project |
|---|---|
| SHRI BALAJI REALITY | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRequire extension due to not received Occupancy certificate , already applied also our project booking slow from last 1 year,
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Feb 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Aug 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed38
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: key plan -1.pdf | 18 Aug 2021 |
| Building plan approval or NA orderFile: GF and BF plan 2.pdf | 18 Aug 2021 |
| Building plan approval or NA orderFile: typical floor plan-3.pdf | 18 Aug 2021 |
| Building plan approval or NA orderFile: florr plan elevation 4.pdf | 18 Aug 2021 |
| Building plan approval or NA orderFile: 005_compressed.pdf | 18 Aug 2021 |
| Copy of Layout Approval (in case of layout)File: key plan -1.pdf | 18 Aug 2021 |
| Building Plan Approval (IOD)File: GF and BF plan 2.pdf | 18 Aug 2021 |
| Building Plan Approval (IOD)File: typical floor plan-3.pdf | 18 Aug 2021 |
| Building Plan Approval (IOD)File: florr plan elevation 4.pdf | 18 Aug 2021 |
| Building Plan Approval (IOD)File: 005_compressed.pdf | 18 Aug 2021 |
| OtherFile: Full OC.pdf | 18 Aug 2021 |
| Form 2AFile: fORM 2A annexure.pdf | 19 Dec 2019 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM-2-31-3-19.pdf | 12 Dec 2019 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM-2-30-11-19.pdf | 12 Dec 2019 |
| Certificates of CA (Form 3) (UT)File: FORM 3-19-3-19.pdf | 12 Dec 2019 |
| Certificates of CA (Form 5) (UT)File: signatur hights_form_5_auditors report.pdf | 12 Dec 2019 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form-1 31-8-19.pdf | 11 Dec 2019 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form-1 30-11-19.pdf | 11 Dec 2019 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: 10-FORM-1-ARCHITECT CERTI.pdf | 21 Feb 2018 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: 14-FORM2-ENGINEER CERTI.pdf | 21 Feb 2018 |
| Certificates of CA (Form 3) (UT)File: 12-FORM-3-CA CERTIFICATE.pdf | 21 Feb 2018 |
| Layout approvalFile: 19-LAY OUT PLAN.pdf | 17 Feb 2018 |
| Building plan approval or NA orderFile: 20-BUILDING PLAN.pdf | 17 Feb 2018 |
| PAN CardFile: 4-PAN CARD BALAJI.pdf | 17 Feb 2018 |
| Copy of the legal title reportFile: 5-Title Report.pdf | 17 Feb 2018 |
| Details of encumbrancesFile: 6-nil encumberse certi.pdf | 17 Feb 2018 |
| Copy of Layout Approval (in case of layout)File: 19-LAY OUT PLAN.pdf | 17 Feb 2018 |
| Building Plan Approval (IOD)File: 20-BUILDING PLAN.pdf | 17 Feb 2018 |
| Commencement CertificatesFile: 15-COMMENCEMENT CERT.pdf | 17 Feb 2018 |
| Declaration in FORM BFile: 9-FORM-B.pdf | 17 Feb 2018 |
| Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: 2-AUDIT REPORT-2014-15.pdf | 17 Feb 2018 |
| Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: 3-BALANCE SHEET-2015-16.pdf | 17 Feb 2018 |
| Proforma of Allotment letterFile: 8-performa_agreement for Sale.pdf | 17 Feb 2018 |
| OtherFile: 18-LAND RECORD 7 X 12.pdf | 17 Feb 2018 |
| Proforma of Allotment letterFile: 7-allotment Latter.pdf | 3 Nov 2017 |
| OtherFile: 16-SITE PLAN.pdf | 1 Nov 2017 |
| OtherFile: 17-FIRE NOC.pdf | 1 Nov 2017 |
| Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: 1 AUDIT REPORT-2016-17.pdf | 8 Oct 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dadra & Nagar Haveli
Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 38 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SIGNATURE HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SILVASSA210+ in Dadra & Nagar Haveli
Filed coordinates, straight-line distance. 70 registered projects within 2 km.
PRAMUKH SHIVANTA
ROYAL ENTERPRISE
SHASHIKALP SAROVAR
AKS BUILDERS AND DEVELOPERES
Ekdant Silver Oak
Ekdant Developers
Nagjua Ananta
MICROMEGA PROJECTS
ROYAL VIEW-II
M & P DEVELOPERS
PARADISE ONE
JMB REALTY
See every Dadra & Nagar Haveli project, with the district possession charts
Builder: SHRI BALAJI REALITY
SHRI BALAJI REALITY has 1 registration on MahaRERA, including SIGNATURE HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.
Frequently asked questions
What does it mean that SIGNATURE HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SIGNATURE HEIGHTS is delayed beyond 14 Dec 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIGNATURE HEIGHTS?
The registered promoter entity is SHRI BALAJI REALITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIGNATURE HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIGNATURE HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIGNATURE HEIGHTS?
The professionals named in the filing: Architect: AJIT JARIWALA; Engineer: Dineshkumar patel; Chartered Accountant: NAVIN MONY JAIN; Chartered Accountant: SHRADHA VATSAL SHAH; Chartered Accountant: POONAM MURARKA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIGNATURE HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback