Home / Browse projects / Dadra & Nagar Haveli / THE COURTYARD PHASE 3A

Registered No litigation declared Residential / Group Housing project

THE COURTYARD PHASE 3A

By M/s LIVINGDWELL ENTERPRISE

RG-MH-18848 · RERA P49600000170 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedno revision filed
110 of 121Construction stages doneacross 11 buildings; furthest along: Podiums (if any), 0%
11 of 11Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

THE COURTYARD PHASE 3A is a Residential / Group Housing project by M/s LIVINGDWELL ENTERPRISE in Dadra & Nagar Haveli, registered with MahaRERA as P49600000170 on 21 Oct 2024. Possession is promised by 1 Jul 2029. 0 of the 11 units on this registration are recorded sold or booked, and 110 of 121 construction stages are filed complete.

At a glance

Project

  • NameTHE COURTYARD PHASE 3A
  • TypeResidential / Group Housing
  • Location
    • AMLI
    • SILVASSA
    • Others
    • Dadra & Nagar Haveli
    • 396230
  • Pincode396230
  • RERA no.P49600000170
  • ReraGenie IDRG-MH-18848

Builder

  • NameM/s LIVINGDWELL ENTERPRISE
  • Entity typePartnership
  • PartnersDAYABHAI NARANBHAI GUDRASIA, CHANABHAI NARANBHAI GUDRASIA, SANJAY DAYABHAI GUDRASIA, JAYANTIBHAI RAGHAVBHAI GUDRASIA
  • Other registrations4 more →
  • Completed3 of 5

Key dates

this monthRegisteredOct 2024PromisedJul 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Oct 2024
  • Promised completion1 Jul 2029
  • Revised completionNone
  • Buildings11 building records
  • Documents filed77 files

Current status

0%0 of 11 units booked
100.0%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUNGLOW NO 2NA43101
BUNGALOW NO 3NA43101
BUNGALOW NO 8NA43101
BUNGALOW NO 9NA43101
BUNGALOW NO 21NA43101
BUNGALOW NO 38NA43101
BUNGALOW NO 40NA43101
BUNGALOW NO 50NA43101
BUNGALOW NO 53NA43101
BUNGALOW NO 54NA43101
BUNGALOW NO 55NA43101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building11

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

110 of 121 construction stages are filed complete across 11 buildings. The stage furthest along is Podiums (if any), at 0%.

BUNGLOW NO 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 991%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 2191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 3891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 4091%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 5091%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 5391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 5491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 5591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered11
Open Space11
BuildingClosed/CoveredOpen SpaceTotal
BUNGLOW NO 2112
BUNGALOW NO 3112
BUNGALOW NO 8112
BUNGALOW NO 9112
BUNGALOW NO 21112
BUNGALOW NO 38112
BUNGALOW NO 40112
BUNGALOW NO 50112
BUNGALOW NO 53112
BUNGALOW NO 54112
BUNGALOW NO 55112

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,078 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Aug 2025

Approvals and building plan

Sanctioning authoritysilvassa municipal council
Permissible FSI3926.19
Proposed, not sanctioned3,426 sq m
Buildings approved11
Buildings sanctioned11

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAYPEE HOUSE, OPP PATEL PETROL PUMP, VAPI SILVASSA MAIN ROAD, SILVASSA
Estimated costRs 4.05 cr
Cost incurredRs 4.05 cr
Work done100.0%
BuildingWingEstimatedIncurred
-NARs 50.00 lakhRs 50.00 lakh
BUNGLOW NO 2NARs 32.30 lakhRs 32.30 lakh
BUNGALOW NO 3NARs 32.30 lakhRs 32.30 lakh
BUNGALOW NO 8NARs 32.30 lakhRs 32.30 lakh
BUNGALOW NO 9NARs 32.30 lakhRs 32.30 lakh
BUNGALOW NO 21NARs 32.30 lakhRs 32.30 lakh
BUNGALOW NO 38NARs 32.30 lakhRs 32.30 lakh
BUNGALOW NO 40NARs 32.30 lakhRs 32.30 lakh
BUNGALOW NO 50NARs 32.30 lakhRs 32.30 lakh
BUNGALOW NO 53NARs 32.30 lakhRs 32.30 lakh
BUNGALOW NO 54NARs 32.30 lakhRs 32.30 lakh
BUNGALOW NO 55NARs 32.30 lakhRs 32.30 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARC HARDIK PANCHAL
ArchitectHARDIK PANCHAL
EngineerANIL PATEL
Chartered AccountantVARUNKUMAR JAIN
Chartered AccountantVARUN JAIN
Chartered AccountantSHAILNEDRA JAIN
PartnerRole in project
M/s LIVINGDWELL ENTERPRISE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Jul 2029

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 LDE PH 3A.pdf9 Jun 2026
Withdrawal Update Form 2File: LDE PHASE 3A FORM 2 ENG CERT 2026.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3 Living Dwell Enterprise Phase 3A 31-12-25.pdf9 Jun 2026
Form 1File: LDE form 1 Arch PHASE 3A_com.pdf16 May 2026
Form 2File: LDE PHASE 3A FORM 2 ENG CERT.pdf16 May 2026
Form 3File: Form 3 Living Dwell Enterprise Phase 3A 31-12-24.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked Inventory till 31-12-2024.pdf16 May 2026
Other - LegalFile: LDE PHASE 3A OC_.pdf25 Mar 2025
Other - TechnicalFile: LDE PHASE 3A OC_.pdf25 Mar 2025
Details of encumbrances concerned to FinanceFile: DECLARATION FOR AUTHORISED SIGNATORY lde.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: DECLARATION FOR FORM 3 LDE PHASE 3A.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: DECLARATION FOR AUTHORISED SIGNATORY lde.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES DECLARATION.pdf20 Aug 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES DECLARATION.pdf20 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: FORM 3 LDE FOR LDE PHASE 3A.pdf9 Aug 2024
Other - LegalFile: phase 3a form b - other legal tab.pdf9 Aug 2024
Other - LegalFile: PHASE 3A- 8,48 SALE DEED .pdf4 Jul 2024
Other - LegalFile: LDE RERA FORM B - PHASE 3A - converted.pdf4 Jul 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBERANCE PHASE 3A.pdf3 Jul 2024
Other - LegalFile: PHASE 3A -18,22,49,51,52,53,54,55,SALE DEED.pdf3 Jul 2024
CERSAI detailsFile: DECLARATION CERSAI ASSET PHASE 3A.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBERANCE PHASE 3A.pdf3 Jul 2024
Other - TechnicalFile: ANNEXURE A DECLARATION CUM UNDERTAKING PHASE 3A.pdf3 Jul 2024
Other - TechnicalFile: UNDERTAKING Layout Approval PHASE 3A .pdf3 Jul 2024
Other - TechnicalFile: DECLARATION FOR COMBINE PLOT.pdf3 Jul 2024
Layout approvalFile: NEW Layout Approval 3A .pdf2 Jul 2024
Copy of Layout Approval (in case of layout)File: NEW Layout Approval 3A .pdf2 Jul 2024
Other - LegalFile: 7-12 -38,40,2,3,50,21,53,54,55,8,9 LDE - converted.pdf21 May 2024
Other - LegalFile: LDE PURCHASE DEED PHASE 3 A PLOT NO 2 3 OTHERS.pdf21 May 2024
CERSAI detailsFile: CERSAI_Search_Report_200304012709_For_Asset_Based_Search_16_04_2024_17_48_12_531.pdf16 Apr 2024
Commencement CertificatesFile: FORM D PHASE3A.pdf13 Apr 2024
Building plan approvalFile: PLOT 8 - converted.pdf10 Apr 2024
Commencement CertificatesFile: LDE CP Plot no 55.pdf10 Apr 2024
Building Plan Approval (IOD)File: PLOT 8 - converted.pdf10 Apr 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT LDE PHASE 3A NEW.pdf2 Apr 2024
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: FY 2223 - converted (1).pdf31 Mar 2024
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: FY 2021-2022.pdf31 Mar 2024
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: FY 2020-2021.pdf31 Mar 2024
Deviation Report with respect to model copy of AgreementFile: ANNEXURE.pdf31 Mar 2024
Declaration in FORM BFile: FORM B LDE PHASE 3A ( - converted.pdf30 Mar 2024
Proforma of Allotment letterFile: PROVISIONAL ALLOTMENT LETTER - Phase3A.pdf29 Mar 2024
Deviation Report with respect to Allotment letterFile: ANNEXURE.pdf29 Mar 2024
Proforma of Agreement for saleFile: RERA AGREEMENT -phase3a .pdf29 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 20240425_154608.pdf28 Mar 2024
Building plan approvalFile: PLOT55 - converted.pdf27 Mar 2024
Building plan approvalFile: PLOT 54 - converted.pdf27 Mar 2024
Building plan approvalFile: PLOT 53 - converted.pdf27 Mar 2024
Building Plan Approval (IOD)File: PLOT 53 - converted.pdf27 Mar 2024
Building Plan Approval (IOD)File: PLOT 54 - converted.pdf27 Mar 2024
Building Plan Approval (IOD)File: PLOT55 - converted.pdf27 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19) (UT)File: FY 2018-2019.pdf27 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20) (UT)File: FY 2019-2020.pdf27 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) (UT)File: FY 2020-2021.pdf27 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FY 2021-2022.pdf27 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FY 2223 - converted.pdf27 Mar 2024
Building plan approvalFile: PLOT 50.pdf26 Mar 2024
Building plan approvalFile: PLOT 40.pdf26 Mar 2024
Building plan approvalFile: PLOT 38.pdf26 Mar 2024
Building plan approvalFile: PLOT 21.pdf26 Mar 2024
Building plan approvalFile: PLOT 2 3.pdf26 Mar 2024
Building plan approvalFile: PLOT 09.pdf26 Mar 2024
PAN CardFile: LDE pancard.pdf26 Mar 2024
Commencement CertificatesFile: LDE CP Plot 9.pdf26 Mar 2024
Commencement CertificatesFile: LDE CP Plot 8.pdf26 Mar 2024
Commencement CertificatesFile: LDE CP Plot no 54.pdf26 Mar 2024
Commencement CertificatesFile: LDE CP Plot no 53.pdf26 Mar 2024
Commencement CertificatesFile: LDE CP Plot 50.pdf26 Mar 2024
Commencement CertificatesFile: LDE CP Plot 40.pdf26 Mar 2024
Commencement CertificatesFile: LDE CP Plot 38.pdf26 Mar 2024
Commencement CertificatesFile: LDE CP Plot 21.pdf26 Mar 2024
Commencement CertificatesFile: LDE CP Plot 2 3.pdf26 Mar 2024
Building Plan Approval (IOD)File: PLOT 09.pdf26 Mar 2024
Building Plan Approval (IOD)File: PLOT 2 3.pdf26 Mar 2024
Building Plan Approval (IOD)File: PLOT 21.pdf26 Mar 2024
Building Plan Approval (IOD)File: PLOT 38.pdf26 Mar 2024
Building Plan Approval (IOD)File: PLOT 40.pdf26 Mar 2024
Building Plan Approval (IOD)File: PLOT 50.pdf26 Mar 2024

How this compares with Dadra & Nagar Haveli

0%of this project is bookeddistrict median 30%
10%of Dadra & Nagar Haveli projects moved their completion datethis one has not
28%of Dadra & Nagar Haveli registrations have lapsed or been cancelledthis one is on the register

Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.

Keep THE COURTYARD PHASE 3A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SILVASSA210+ in Dadra & Nagar Haveli

Builder: M/s LIVINGDWELL ENTERPRISE

M/s LIVINGDWELL ENTERPRISE has 5 registrations on MahaRERA, including THE COURTYARD 41 TO 45 and THE COURTYARD PHASE2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.

Frequently asked questions

What are my rights if THE COURTYARD PHASE 3A is delayed beyond 1 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE COURTYARD PHASE 3A?

The registered promoter entity is M/s LIVINGDWELL ENTERPRISE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE COURTYARD PHASE 3A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE COURTYARD PHASE 3A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE COURTYARD PHASE 3A?

The professionals named in the filing: Architect: ARC HARDIK PANCHAL; Architect: HARDIK PANCHAL; Engineer: ANIL PATEL; Chartered Accountant: VARUNKUMAR JAIN; Chartered Accountant: VARUN JAIN; Chartered Accountant: SHAILNEDRA JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE COURTYARD PHASE 3A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE COURTYARD PHASE 3A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE COURTYARD PHASE 3A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.