Completed No litigation declared Mixed project

SWAGAT

By PRAMUKH REALTY

RG-MH-00856 · RERA P49600000104 · Last updated on MahaRERA portal: 13 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Dadra & Nagar Haveli registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedregistration recorded completed
57 of 66Construction stages doneacross 7 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

SWAGAT is a Mixed project by PRAMUKH REALTY in Dadra & Nagar Haveli, registered with MahaRERA as P49600000104 on 25 Mar 2021. The registration is recorded completed; possession was promised by 30 Jun 2027.

At a glance

Project

  • NameSWAGAT
  • TypeMixed
  • Location
    • NR. LIONS ENGLISH SCHOOL
    • AMLI
    • Dadra & Nagar Haveli
    • 396230
  • Pincode396230
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49600000104
  • ReraGenie IDRG-MH-00856

Builder

  • NamePRAMUKH REALTY
  • Entity typePartnership
  • PartnersAJIT HARDAS KHODBHAYA, TAPAN DEVSHI BHATU
  • Other registrations13 more →
  • Completed7 of 14
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2021PromisedJun 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Mar 2021
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings6 building records
  • Documents filed107 files

Current status

100.3%Work done, per cost certificate

Figures as on 13 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA110000
BNA110000
CNA110000
DNA110000
ENA110000
FNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 13 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

57 of 66 construction stages are filed complete across 7 buildings. The stage furthest along is Basement (if any), at 0%.

A82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 13 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed281

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots281
Closed/Covered118
Open Space163
BuildingClosed/CoveredOpen SpaceTotal
A192544
B233154
C193049
D193049
E192443
F192342

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,731 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Sep 2025
LandownerVillageDistrict
SILVASSA REALTYAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySilvassa Municipal Councial
Permissible FSI23462.0
Proposed, not sanctioned21,714 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAYPEE HOUSE, VAPI-SILVASSA ROAD, SILVASSA
Estimated costRs 49.45 cr
Cost incurredRs 49.59 cr
Work done100.29%
BuildingWingEstimatedIncurred
ANARs 38.05 crRs 46.88 cr
BNARs 11.40 crRs 2.71 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARUL KANSARA
ArchitectPRASHANT PARADAVA
EngineerJANAK BHAVSAR
Chartered AccountantSHEKHAR LAKHANI
PartnerRole in project
PRAMUKH REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Sep 2025

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: signed SWAGAT Form 5.pdf13 Oct 2025
Withdrawal Update Form 1File: Swagat Form 1 (2).pdf3 Sep 2025
Withdrawal Update Form 2File: Swagat Form 2.pdf3 Sep 2025
Withdrawal Update Form 3File: Silvassa Realty Form 3.pdf3 Sep 2025
Occupational CertificateFile: Swagat Building A Silvassa Realty OC.pdf3 Sep 2025
Occupational CertificateFile: swagat B building OC-1.pdf3 Sep 2025
Occupational CertificateFile: OC C BLDG.pdf3 Sep 2025
Occupational CertificateFile: OC D BLDG.pdf3 Sep 2025
Occupational CertificateFile: OC E BLDG.pdf3 Sep 2025
Occupational CertificateFile: OC F and CLUB BLDG.pdf3 Sep 2025
Completion CertificateFile: Swagat Society Regirstation Certificate.pdf3 Sep 2025
Form 1File: FORM 1 SWAGAT.pdf7 Jul 2025
Form 2File: FORM 2 SWAGAT.pdf7 Jul 2025
Form 3File: FORM 3 SWAGAT.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: FORM 3 SWAGAT.pdf7 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: FORM 1 SWAGAT.pdf25 Apr 2025
Certificates of CA (Form 3) (UT)File: FORM 3 SWAGAT.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2 SWAGAT.pdf25 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A Swagat.pdf25 Apr 2025
PAN CardFile: PR PAN CARD.pdf27 Mar 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CERTIFICATED.pdf27 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18) (UT)File: NOT APPLICABLE.pdf27 Mar 2025
CERSAI detailsFile: NOT APPLICABLE.pdf27 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: NOT APPLICABLE.pdf27 Mar 2025
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER PRAMUKH.pdf27 Mar 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CERTIFICATED.pdf27 Mar 2025
Other - TechnicalFile: OC B BLDG.pdf27 Mar 2025
Other - TechnicalFile: FORM 4 (1).pdf27 Mar 2025
Other - TechnicalFile: Swagat Society Regirstation Certificate.pdf27 Mar 2025
Other - TechnicalFile: final OC project swagat F and Club building-1.pdf27 Mar 2025
Other - TechnicalFile: OC E BLDG.pdf27 Mar 2025
Other - TechnicalFile: OC D BLDG.pdf27 Mar 2025
Other - TechnicalFile: OC C BLDG.pdf27 Mar 2025
Other - TechnicalFile: OC A BLDG.pdf27 Mar 2025
Deviation Report with respect to model copy of AgreementFile: 1 Proforma of Allotment letter.pdf27 Mar 2025
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: SWAGAT FORM 1.pdf25 Jan 2025
Certificates of CA (Form 3) (UT)File: SWAGAT FORM 3.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: SWAGAT FORM 2.pdf25 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A)File: SWAGAT FORM 2A.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1 Swagat.pdf18 Oct 2024
Certificates of CA (Form 3) (UT)File: FORM 3 SWAGAT.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2 Swagat.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A Swagat.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Swagat Form 5.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Swagat Form 5.pdf14 Oct 2024
Certificates of CA (Form 3) (UT)File: Silvassa Realty Form 3.pdf3 Aug 2024
Certificates of CA (Form 3) (UT)File: Swagat Form 3.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Swagat Form 1 (2).pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Swagat Form 2.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A)File: Swagat 2A.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Swagat Form 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Swagat Form 2_compressed.pdf20 Apr 2024
Certificates of CA (Form 3) (UT)File: Swagat Form 3.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A)File: Swagat Form 2A.pdf20 Apr 2024
Certificates of CA (Form 3) (UT)File: FORM 3 SWAGAT DEC 2023_compressed.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: FORM 1 SWAGAT DEC 2023.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: FORM 2 SWAGAT DEC 2023.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A)File: 2A Swagat.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1 Swagat Sep 23.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2 Swagat Sep 23.pdf25 Nov 2023
Certificates of CA (Form 3) (UT)File: Form 3 PR Swagat Sep 23_11zon.pdf25 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A)File: 2nd quarter Swagat 2A.pdf25 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Swagat Project F Y -2022-23.pdf26 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf25 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: Form 2.pdf25 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: 30062023 swagat form 2.pdf25 Jul 2023
Certificates of CA (Form 3) (UT)File: Form 3.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A)File: Swagat 2a.pdf25 Jul 2023
Certificates of CA (Form 3) (UT)File: SWAGAT FORM 3.PDF10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: SWAGAT FORM 1.pdf9 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: SWAGAT FORM 2.pdf9 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21 22.pdf15 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A)File: SWAGAT 2ND 2223.pdf8 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A)File: SWAGAT 1ST 2223.pdf20 Jul 2022
Commencement CertificatesFile: RCP.pdf16 Jun 2022
Proforma of Allotment letterFile: RE AFS PRAMUKH.pdf16 Jun 2022
Copy of the legal title reportFile: SWAGAT TITLE.pdf20 Mar 2021
Copy of the legal title reportFile: SNo859 1 Title File.pdf20 Mar 2021
Details of encumbrancesFile: ENCUMBRANCES CERTIFICATED.pdf20 Mar 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PRAMUKH SNEHSAMARVANI253CompletedDec 2018Sep 2018

How this compares with Dadra & Nagar Haveli

10%of Dadra & Nagar Haveli projects moved their completion datethis one has not
28%of Dadra & Nagar Haveli registrations have lapsed or been cancelledthis one is completed

Computed across the 210+ Dadra & Nagar Haveli projects on ReraGenie, from their own filings.

Keep SWAGAT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMLI210+ in Dadra & Nagar Haveli

2 kmSWAGATCompleted 22Lapsed / revoked 14Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: PRAMUKH REALTY

Pramukh Realty has 14 registrations on MahaRERA, including Pramukh Sneh Phase 2 and Nakshatra A-B. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Dadra & Nagar Haveli district page.

Frequently asked questions

What are my rights if SWAGAT is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWAGAT?

The registered promoter entity is PRAMUKH REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWAGAT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWAGAT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWAGAT?

The professionals named in the filing: Architect: PARUL KANSARA; Architect: PRASHANT PARADAVA; Engineer: JANAK BHAVSAR; Chartered Accountant: SHEKHAR LAKHANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWAGAT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWAGAT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWAGAT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.