Home / Browse projects / Pune, Maharashtra / Mahindra Citadel - Phase 5

Registered Litigation declared Mixed project

Mahindra Citadel - Phase 5

By Mahindra Lifespace Developers limited

RG-MH-61543 · RERA PM1264042600425 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2031Possession promisedno revision filed
0 of 31Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
670 of 670Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 22 documents Report an error

Mahindra Citadel - Phase 5 is a Mixed project by Mahindra Lifespace Developers limited in Pune, Maharashtra, registered with MahaRERA as PM1264042600425 on 15 May 2026. Possession is promised by 31 Aug 2031. 0 of the 670 units on this registration are recorded sold or booked, and 0 of 31 construction stages are filed complete.

At a glance

Project

  • NameMahindra Citadel - Phase 5
  • TypeMixed
  • Location
    • CTS No. 4854
    • Sub-Plot A
    • situate at Village Pimpri Waghere
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411018
  • Pincode411018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1264042600425
  • ReraGenie IDRG-MH-61543

Builder

  • NameMahindra Lifespace Developers limited
  • Entity typeCompany
  • CINL45200MH1999PLC118949
  • GSTIN27AAACG8904C1ZV
  • ChairmanAmeet Hariani
  • Managing Director & CEOAmit Kumar Sinha
  • DirectorsAnish Shah, Rucha Nanavati, Milind Kulkarni
  • Independent DirectorsAmrita Chowdhury, Anuj Puri
  • Other registrations66 more →
  • Completed25 of 67
  • No longer live20 lapsed, de-registered or revoked
  • Declared earlier projects66 →

Key dates

this monthRegisteredMay 2026PromisedAug 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2026
  • Promised completion31 Aug 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed22 files

Current status

0%0 of 670 units booked
3.7%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ENA35342300230
Tower FNA35342180218
Tower GNA363520913222

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 31 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

Tower E0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower F0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower G0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable
Club HouseNo0%

Parking filed780

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots780
Stilt / Ground178
Podiums / Upper Parking Floor602
BuildingStilt / GroundPodiums / Upper Parking FloorTotal
Tower E58210268
Tower F55200255
Tower G65192257

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area40,160 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 May 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI74000.0
Proposed, not sanctioned73,702 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch.5 C/ II, MITTAL COURT,224, NARIMAN POINT,MUMBAI - 400 021
Estimated costRs 376.26 cr
Cost incurredRs 13.76 cr
Work done3.66%
BuildingWingEstimatedIncurred
-NARs 127.81 crRs 13.76 cr
Tower ENARs 86.90 cr-
Tower FNARs 83.41 cr-
Tower GNARs 78.14 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANKALP DESIGNERS
EngineerK C Shah Designs LLP
Chartered AccountantP G BHAGWAT LLP Mainkar
PartnerRole in project
Mahindra Lifespace Developers limited-

Litigation declared3

CaseCourtStatus
420/2024/2024Sub - Divisional Officer Haveli, PuneOngoing
3409/2025/2025Bombay High CourtOngoing
SR/6/2025/2025Upper Tehsildar and Agriculture Land Tribunal, Pimpri Chinchwad, PuneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 May 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2031

Documents filed22

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Highlighted Layout.pdf6 May 2026
Building plan approvalFile: Commercial Bldg 02 61.pdf6 May 2026
Layout approvalFile: Commercial Bldg 02 62.pdf6 May 2026
Building plan approvalFile: Tower E 31.pdf6 May 2026
Building plan approvalFile: Tower E 32.pdf6 May 2026
Building plan approvalFile: Tower E 33.pdf6 May 2026
Building plan approvalFile: Tower E 34.pdf6 May 2026
Building plan approvalFile: Tower E 35.pdf6 May 2026
Building plan approvalFile: Tower F 36.pdf6 May 2026
Building plan approvalFile: Tower F 37.pdf6 May 2026
Building plan approvalFile: Tower F 38.pdf6 May 2026
Building plan approvalFile: Tower F 39.pdf6 May 2026
Building plan approvalFile: Tower F 40.pdf6 May 2026
Building plan approvalFile: Tower F 41.pdf6 May 2026
Building plan approvalFile: Tower G 42.pdf6 May 2026
Building plan approvalFile: Tower G 43.pdf6 May 2026
Building plan approvalFile: Tower G 44.pdf6 May 2026
Building plan approvalFile: Tower G 45.pdf6 May 2026
Building plan approvalFile: Tower G 46.pdf6 May 2026
Building plan approvalFile: Tower G 47.pdf6 May 2026
Building plan approvalFile: Tower G 48.pdf6 May 2026
Declaration and undertaking (Annexure A)File: Order 50 Annexure A.pdf6 May 2026

Promoter's earlier projects16

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
WindchimesMahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075454CompletedDec 2018Dec 2018
Boisar Phase IIGut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar238CompletedDec 2017Jun 2017
BOISAR Phase IGut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar359CompletedJun 2017Jan 2017
LartistaMahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 01821CompletedSep 2016Sep 2016
Avadi Phase IBlock No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee604CompletedJun 2016Apr 2016
AshvitaMahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072664CompletedJun 2016May 2016
Aura PH5Village Chauma Sector 110A Gurgaon Manesar Urban Complex150CompletedJan 2015Late, Sep 2016
Aura PH4Village Chauma Sector 110A Gurgaon Manesar Urban Complex142CompletedJan 2015Late, Dec 2015
Aura PH3Village Chauma Sector 110A Gurgaon Manesar Urban Complex110CompletedOct 2014Late, Aug 2015
Aura PH2Village Chauma Sector 110A Gurgaon Manesar Urban Complex166CompletedNov 2013Late, Oct 2014
Splendour Phase 2CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re233CompletedNov 2013Jun 2013
Aura PH1Village Chauma Sector 110A Gurgaon Manesar Urban Complex231CompletedMay 2013May 2013
AngelicaBldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai67CompletedMar 2013Mar 2013
AspenBldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai68CompletedDec 2012Dec 2012
Splendour Phase 1CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078265CompletedAug 2011Aug 2011
ChlorisMilestone 16 PART 3 Sector 19 Faridabad160CompletedJul 2011Jul 2011

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahindra Citadel - Phase 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri Chinchawad (M Corp.)13,700+ in Pune

2 kmMahindra Citadel - PhaseCompleted 33Lapsed / revoked 24Other 125Dot size: filed unitsN

Filed coordinates, straight-line distance. 182 registered projects within 2 km.

Builder: Mahindra Lifespace Developers limited

Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Mahindra Citadel - Phase 5 is delayed beyond 31 Aug 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahindra Citadel - Phase 5?

The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 and GSTIN 27AAACG8904C1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahindra Citadel - Phase 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mahindra Citadel - Phase 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahindra Citadel - Phase 5?

The professionals named in the filing: Architect: SANKALP DESIGNERS; Engineer: K C Shah Designs LLP; Chartered Accountant: P G BHAGWAT LLP Mainkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahindra Citadel - Phase 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahindra Citadel - Phase 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahindra Citadel - Phase 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.