Completed No litigation declared Residential / Group Housing project

Roots

By Mahindra Lifespace Developers limited

RG-MH-96330 · RERA P51800016833 · Last updated on MahaRERA portal: 4 Oct 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2023Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Staircases, 92%
1Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

Roots is a Residential / Group Housing project by Mahindra Lifespace Developers limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800016833 on 18 Jun 2018. The registration is recorded completed; possession was promised by 30 Sep 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRoots
  • TypeResidential / Group Housing
  • Location
    • Akurli Road
    • Vickers Compound
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • RERA no.P51800016833
  • ReraGenie IDRG-MH-96330

Builder

  • NameMahindra Lifespace Developers limited
  • Entity typeCompany
  • CINL45200MH1999PLC118949
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonArun Kumar Tilak Raj Nanda
  • Managing DirectorArvind Subramanian
  • Other registrations66 more →
  • Completed25 of 67
  • No longer live20 lapsed, de-registered or revoked
  • Declared earlier projects66 →

Key dates

this monthRegisteredJun 2018PromisedSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jun 2018
  • Promised completion30 Sep 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed127 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Residential BuildingNA430000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 92%.

Residential Building: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises74%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.64%

Progress on shared amenities26

As on 4 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes83%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Amphitheater AreaYes0%
Edible LandscapeYes0%
Games roomYes0%
GymYes0%
Kids play areaYes0%
Landscaped AreaYes0%
LawnYes0%
Multipurpose HallYes0%
Outdoor exercise areaYes0%
Skating PitYes0%
Swimming poolYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,464 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9372.65
Proposed, not sanctioned6,146 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5 C Li Mittal Court 224 Nariman Point Mumbai 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEdifice Consultants Pvt Ltd
EngineerEpicons Consultants
Chartered AccountantP G BHAGWAT LLP
PartnerRole in project
Mahindra Lifespace Developers limited-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000397959Rajesh PujariMahindra Lifespace Developers Ltd31/10/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Oct 2023

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ROOT FULL _OC_ LETTER UPTO 35TH FLOOR.pdf4 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form_04_230120-1_signed.pdf4 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Roots Form 5 v1.pdf28 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate q4.pdf19 Apr 2023
Certificates of CA (Form 3)File: CA Certificate- Roots Q4_1.pdf19 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form_04_230120-1_signed.pdf8 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June-22.pdf6 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: June-22.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: M-MLDL-KVLI-Q3_2022_2023-230111.pdf18 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MLDL KANDIVALI_CERTIFICATE Q3_DEC22-Final_signed.pdf18 Jan 2023
Certificates of CA (Form 3)File: Roots Dec'22_signed_compressed_1.pdf17 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Certificate Q2 Roots.pdf20 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Roots Q2 Architect certificate.pdf17 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: M-MLDL-KVLI-Q2_2022_2023-221013-min.pdf17 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MLDL KANDIVALI_CERTIFICATE Q2_SEPT22-Final-signed-min.pdf17 Oct 2022
Certificates of CA (Form 3)File: Roots CA Certificate _Sep 22-signed-min.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Roots-signed-signed.pdf30 Sep 2022
Certificates of CA (Form 3)File: Certificate_Roots_June 22 - updated-signed.pdf18 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Roots Arch Certificate Q4 2021-22.pdf17 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Roots Engg Certificate Q4 2021-22.pdf17 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Roots QA Certificate Q4 2021-22.pdf17 May 2022
Certificates of CA (Form 3)File: Roots CA Certificate Q4 2021-22.pdf17 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Roots Q3 FY 22.pdf21 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Roots Q3 FY 22.pdf21 Mar 2022
Certificates of CA (Form 3)File: CA Certificate Roots Q3 FY 22.pdf21 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Roots Q2 FY 22.pdf16 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Roots Q2 FY 22.pdf16 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Certificate Roots Q2 FY 22.pdf16 Nov 2021
Certificates of CA (Form 3)File: CA Certificate Roots Q2 FY 22.pdf16 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Roots Further CC.pdf16 Oct 2021
Declaration about Commencement CertificateFile: FormD-Declaration.pdf16 Oct 2021
Proforma of Allotment letterFile: Roots-Agreement for Sale-revised final.pdf16 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Roots Q1 FY 22.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Roots Q1 FY 22.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Certificate Roots Q1 FY 22.pdf7 Oct 2021
Certificates of CA (Form 3)File: CA Certificate Roots Q1 FY 22.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed Form 5 and SOA - Roots.pdf7 Oct 2021
Proforma of Allotment letterFile: Roots-Agreement for Sale-28052021-clean.pdf9 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Roots Architects Certificate Q4 FY 20-21.pdf31 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Roots Engg Certificate Q4 FY 20-21.pdf31 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ROOTS QC Q4 2020-2021 compressed.pdf31 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ROOTS QC Q4 2020-2021 compressed.pdf31 May 2021
Certificates of CA (Form 3)File: Roots CA Certificate Q4 FY 20-21.pdf31 May 2021
Proforma of Allotment letterFile: Roots Agreement for Sale17032021.pdf6 Apr 2021
Layout approvalFile: Amended approval letter 17022021.pdf25 Feb 2021
Building plan approvalFile: Amended approved plan 17022021.pdf25 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended approval letter 17022021.pdf25 Feb 2021
Building Plan Approval (IOD)File: Amended approved plan 17022021.pdf25 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Roots Architects Certificate Q3 FY 20-21_.pdf3 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Roots Engg Certificate Q3 FY 20-21.pdf3 Feb 2021
Certificates of CA (Form 3)File: Roots CA Certificate Q3 FY 20-21.pdf3 Feb 2021
Annual Audit Report of Statutory CA (Form 5)File: Roots Form 5.pdf9 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Q2_2020_2021.pdf24 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certificate- Sept 2020.pdf24 Oct 2020
Certificates of CA (Form 3)File: CA Certiifcte Roots Sept 2020.pdf24 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Q4_2019_2020.pdf18 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Q1_2020_2021.pdf18 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ROOTS Engg Certificate Q4-2019-20_1.pdf18 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ROOTS Engg Certtificate Q1-2020-21_1.pdf18 Aug 2020
Certificates of CA (Form 3)File: Roots RERA March20 Certificate1.pdf18 Aug 2020
Certificates of CA (Form 3)File: Roots RERA June 20 Certificate1.pdf18 Aug 2020
Certificates of CA (Form 3)File: Roots Certificate Dec 2019.pdf23 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE Q3-15012020.pdf22 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ROOTS_ENGG_CERT_Q3_2019_2020.pdf22 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: M-MLDL-KVLI-RERA CERTIFICATE-10102019.pdf15 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Q2_2019_2020.pdf15 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Q2_2019_2020.pdf15 Oct 2019
Certificates of CA (Form 3)File: RERA Certificate Root - Sept 2019_opt.pdf15 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: ROOTS FORM 5_opt.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: M-MLDL-KVLI-RERA CERTIFICATE-12072018.pdf16 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Q1_2019_2020.pdf16 Jul 2019
Certificates of CA (Form 3)File: RERA Certificate Root - June 2019_opt.pdf16 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Roots, Architect Certificate - Q4 19.pdf30 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Roots_Engineer's Certificate Q4 19_opt.pdf30 Apr 2019
Certificates of CA (Form 3)File: Roots_CA Q4 2019_Certificate_opt.pdf30 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Dec - Q3 - 2018.pdf17 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Dec - Q3 - 2018.pdf17 Jan 2019
Certificates of CA (Form 3)File: CA Certificate - Dec - Q3 -2018.pdf17 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MLDL Roots - Architect Certificate RERA Q2 FY 19.pdf16 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kandivali, Roots -RERA Q2 FY 19.pdf16 Oct 2018

Promoter's earlier projects16

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
WindchimesMahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075454CompletedDec 2018Dec 2018
Boisar Phase IIGut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar238CompletedDec 2017Jun 2017
BOISAR Phase IGut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar359CompletedJun 2017Jan 2017
LartistaMahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 01821CompletedSep 2016Sep 2016
Avadi Phase IBlock No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee604CompletedJun 2016Apr 2016
AshvitaMahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072664CompletedJun 2016May 2016
Aura PH5Village Chauma Sector 110A Gurgaon Manesar Urban Complex150CompletedJan 2015Late, Sep 2016
Aura PH4Village Chauma Sector 110A Gurgaon Manesar Urban Complex142CompletedJan 2015Late, Dec 2015
Aura PH3Village Chauma Sector 110A Gurgaon Manesar Urban Complex110CompletedOct 2014Late, Aug 2015
Aura PH2Village Chauma Sector 110A Gurgaon Manesar Urban Complex166CompletedNov 2013Late, Oct 2014
Splendour Phase 2CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re233CompletedNov 2013Jun 2013
Aura PH1Village Chauma Sector 110A Gurgaon Manesar Urban Complex231CompletedMay 2013May 2013
AngelicaBldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai67CompletedMar 2013Mar 2013
AspenBldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai68CompletedDec 2012Dec 2012
Splendour Phase 1CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078265CompletedAug 2011Aug 2011
ChlorisMilestone 16 PART 3 Sector 19 Faridabad160CompletedJul 2011Jul 2011

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Roots on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vickers Compound6,700+ in Mumbai Suburban

Builder: Mahindra Lifespace Developers limited

Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Roots is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Roots?

The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Roots?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Roots?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Roots?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Roots?

The professionals named in the filing: Architect: Edifice Consultants Pvt Ltd; Engineer: Epicons Consultants; Chartered Accountant: P G BHAGWAT LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Roots?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Roots. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Roots to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.