Home / Browse projects / Pune, Maharashtra / Centralis Tower 1
Centralis Tower 1
By Mahindra Lifespace Developers limited
RG-MH-80180 · RERA P52100019406 · Last updated on MahaRERA portal: 30 Sep 2023
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Centralis Tower 1 is a Residential / Group Housing project by Mahindra Lifespace Developers limited in Pune, Maharashtra, registered with MahaRERA as P52100019406 on 29 Jan 2019. The registration is recorded completed; possession was promised by 28 Aug 2023. 1 complaint is on record with the regulator.
At a glance
Project
- NameCentralis Tower 1
- TypeResidential / Group Housing
- Location
- Nehru Nagar Road
- Pimpri
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411018
- Pincode411018
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100019406
- ReraGenie IDRG-MH-80180
Builder
- NameMahindra Lifespace Developers limited
- Entity typeCompany
- CINL45200MH1999PLC118949
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- ChairpersonArun Kumar Tilak Raj Nanda
- Managing DirectorArvind Subramanian
- Other registrations66 more →
- Completed25 of 67
- No longer live20 lapsed, de-registered or revoked
- Declared earlier projects66 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on29 Jan 2019
- Promised completion28 Aug 2023
- Revised completionNone
- Buildings1 building record
- Documents filed95 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Centralis Tower 1 | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Centralis Tower 1: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Club House | Yes | 0% |
Parking filed100
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANDVIWALA QUTUB & ASSOCIATES |
| Engineer | Catalyst |
| Chartered Accountant | A B D AND CO LLP |
| Partner | Role in project |
|---|---|
| Mahindra Lifespace Developers limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000075189 | ASHISH AVINASH JADHAV | MAHNDRA LIFESPACE DEVELOPERS LTD. | 28/02/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jan 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Aug 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Jan 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Apr 2023
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Centralis T1.pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis - Architect Certificate Mar'23 Tower 1_signed.pdf | 17 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Mar'23 Tower 1_signed.pdf | 17 Apr 2023 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE_FY 22-23 - Mar'23_signed.pdf | 17 Apr 2023 |
| Certificates of CA (Form 3)File: Centralis Tower 1 Cer Mar23_signed_11zon.pdf | 17 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Tower 1 OC.pdf | 17 Apr 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Certificate form 4 T1.pdf | 17 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Centralis Tower 1.pdf | 4 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY20 Tower 1.pdf | 4 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis - Architect Certificate Dec'22 Tower 1_signed.pdf | 13 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Dec'22 Tower 1_signed.pdf | 13 Jan 2023 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE_FY 22-23 - Dec'22.pdf | 13 Jan 2023 |
| Certificates of CA (Form 3)File: Centralis Tower 1_Dec 2022_signed.pdf | 13 Jan 2023 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE_FY 22-23 - Sep'22.pdf | 21 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis_-_Architect_Certificate_Sep_22__1__compressed (1).pdf | 19 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Sep'22--signed.pdf | 19 Oct 2022 |
| Certificates of CA (Form 3)File: Tower 1_Final CA Certificate _Sep 2022 - signed_compressed.pdf | 19 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Centralis T1.pdf | 30 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis - Architect Certificate Mar'22_11zon.pdf | 19 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis - Architect Certificate Jun'2022-signed.pdf | 19 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Mar'22.pdf | 19 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Jun'2022-signed.pdf | 19 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE_FY 22-23_Jun-22-signed.pdf | 19 Jul 2022 |
| Certificates of CA (Form 3)File: CA Certificate Tower 1_june 2022-signed_11zon.pdf | 19 Jul 2022 |
| Form 2AFile: 2A Mar-21.pdf | 18 Jan 2022 |
| Form 2AFile: 2A Jun-21.pdf | 18 Jan 2022 |
| Form 2AFile: 2A Sept-21.pdf | 18 Jan 2022 |
| Form 2AFile: 2A Dec-21.pdf | 18 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis_-_Architect_Certificate_Dec_21.pdf | 15 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Dec'21_Certi 06.pdf | 13 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Dec'21_Certi 06.pdf | 13 Jan 2022 |
| Certificates of CA (Form 3)File: Centralis T1 Jun'21 CA certificate_compressed.pdf | 13 Jan 2022 |
| Certificates of CA (Form 3)File: Centralis T1 Jun'21 CA certificate_compressed.pdf | 13 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis - Architect Certificate Sept'21.pdf | 22 Nov 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Sept'21_Certi 04.pdf | 22 Nov 2021 |
| Certificates of CA (Form 3)File: Tower 1 Mar'21 CA Certificate_compressed (1).pdf | 4 Oct 2021 |
| Certificates of CA (Form 3)File: Tower 1 Mar'21 CA Certificate_compressed (1).pdf | 4 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Tower 1.pdf | 4 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Jun'21_Certi 02 (1).pdf | 23 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis - Architect Certificate Jun'21.pdf | 6 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis_-_Architect_Certificate_Sept20.pdf | 5 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis - Architect Certificate Dec'20_compressed.pdf | 5 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahindra_Lifespace_Mar 21_compressed.pdf | 5 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Mar'21_Certi 09.pdf | 5 Jul 2021 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE_Mar-20_compressed.pdf | 5 Jul 2021 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE_June-20_compressed.pdf | 5 Jul 2021 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE_Sept-20_compressed.pdf | 5 Jul 2021 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE_Dec-20_compressed (1).pdf | 5 Jul 2021 |
| Certificates of CA (Form 3)File: Tower 1 Dec'20 Certificate_compressed.pdf | 5 Jul 2021 |
| Certificates of CA (Form 3)File: Tower 1 Sep 20 CA certificate (1).pdf | 6 May 2021 |
| Certificates of CA (Form 3)File: Centralis Tower 1_Jun 2020_compressed.pdf | 6 May 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Sept'20_Certi 07.pdf | 15 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Dec'20_Certi 08.pdf | 15 Feb 2021 |
| Certificates of CA (Form 3)File: Centralis Tower 1_Jun 2020_compressed.pdf | 2 Dec 2020 |
| Certificates of CA (Form 3)File: Centralis Tower 1_Mar 2020_compressed.pdf | 21 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis_-_Architect_Certificate_June_20_Reduced.pdf | 16 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Jun'20_Certi 06.pdf | 16 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis_-_Architect_Certificate_Mar_20_Reduced.pdf | 31 Aug 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Mar'20_Certi 05.pdf | 31 Aug 2020 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE_03_Reduced.pdf | 7 Feb 2020 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE_04_Compressed.pdf | 7 Feb 2020 |
| Certificates of CA (Form 3)File: Centralis Tower1_dec2019.pdf | 6 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis - Architect Certificate Dec'19_Compressed.pdf | 16 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Centralis_Dec'19_Certi 04.pdf | 16 Jan 2020 |
| Certificates of CA (Form 3)File: Centralis T1.pdf | 31 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate_Compressed.pdf | 22 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Sept 2019_Compressed.pdf | 22 Oct 2019 |
| Proforma of Allotment letterFile: Agreement for Sale_Sept 2019.pdf | 11 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: Centralis Tower 1.pdf | 4 Oct 2019 |
| Layout approvalFile: Revised drawing layout for the project.pdf | 2 Aug 2019 |
| Copy of Layout Approval (in case of layout)File: Revised drawing layout for the project.pdf | 2 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC for the project.pdf | 2 Aug 2019 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE_Compressed.pdf | 30 Jul 2019 |
| Certificates of CA (Form 3)File: Centralis Tower 1.pdf | 29 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate June 2019_Compressed.pdf | 18 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-June 2019_Compressed.pdf | 18 Jul 2019 |
| Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE_compressed.pdf | 3 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centralis - Architect Certificate April'19_compressed (1).pdf | 30 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 30 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-March 2019.pdf | 30 Apr 2019 |
Promoter's earlier projects16
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Windchimes | Mahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075 | 454 | Completed | Dec 2018 | Dec 2018 |
| Boisar Phase II | Gut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar | 238 | Completed | Dec 2017 | Jun 2017 |
| BOISAR Phase I | Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar | 359 | Completed | Jun 2017 | Jan 2017 |
| Lartista | Mahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018 | 21 | Completed | Sep 2016 | Sep 2016 |
| Avadi Phase I | Block No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee | 604 | Completed | Jun 2016 | Apr 2016 |
| Ashvita | Mahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072 | 664 | Completed | Jun 2016 | May 2016 |
| Aura PH5 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 150 | Completed | Jan 2015 | Late, Sep 2016 |
| Aura PH4 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 142 | Completed | Jan 2015 | Late, Dec 2015 |
| Aura PH3 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 110 | Completed | Oct 2014 | Late, Aug 2015 |
| Aura PH2 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 166 | Completed | Nov 2013 | Late, Oct 2014 |
| Splendour Phase 2 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re | 233 | Completed | Nov 2013 | Jun 2013 |
| Aura PH1 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 231 | Completed | May 2013 | May 2013 |
| Angelica | Bldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai | 67 | Completed | Mar 2013 | Mar 2013 |
| Aspen | Bldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai | 68 | Completed | Dec 2012 | Dec 2012 |
| Splendour Phase 1 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078 | 265 | Completed | Aug 2011 | Aug 2011 |
| Chloris | Milestone 16 PART 3 Sector 19 Faridabad | 160 | Completed | Jul 2011 | Jul 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 66 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
Keep Centralis Tower 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pimpri13,700+ in Pune
Filed coordinates, straight-line distance. 225 registered projects within 2 km.
Godrej Emerald Waters
Godrej Properties Limited
Mahindra Citadel - Phase 5
Mahindra Lifespace Developers limited
Mahindra Citadel Phase 1
Mahindra Lifespace Developers limited
Bramha Sky Uzuri Phase 2
BRAMHA LEISURES PVT LTD
RAJVEER IMPERIA
Waghere Associates
KOHINOOR SHANGRILA PHASE 2
KOHINOOR PROPERTIES
Builder: Mahindra Lifespace Developers limited
Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Centralis Tower 1 is delayed beyond 28 Aug 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Centralis Tower 1?
The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Centralis Tower 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Centralis Tower 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Centralis Tower 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Centralis Tower 1?
The professionals named in the filing: Architect: MANDVIWALA QUTUB & ASSOCIATES; Engineer: Catalyst; Chartered Accountant: A B D AND CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Centralis Tower 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback