Home / Browse projects / Pune, Maharashtra / Antheia C3

Completed No litigation declared Residential / Group Housing project

Antheia C3

By Mahindra Lifespace Developers limited

RG-MH-46044 · RERA P52100016619 · Last updated on MahaRERA portal: 6 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 66 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 32%
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

Antheia C3 is a Residential / Group Housing project by Mahindra Lifespace Developers limited in Pune, Maharashtra, registered with MahaRERA as P52100016619 on 25 May 2018. The registration is recorded completed; possession was promised by 30 Mar 2023.

At a glance

Project

  • NameAntheia C3
  • TypeResidential / Group Housing
  • Location
    • Nehru nagar Rd
    • Pimpri
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411018
  • Pincode411018
  • RERA no.P52100016619
  • ReraGenie IDRG-MH-46044

Builder

  • NameMahindra Lifespace Developers limited
  • Entity typeCompany
  • CINL45200MH1999PLC118949
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonArun Kumar Tilak Raj Nanda
  • Managing DirectorArvind Subramanian
  • Other registrations66 more →
  • Completed25 of 67
  • No longer live20 lapsed, de-registered or revoked
  • Declared earlier projects66 →

Key dates

this monthRegisteredMay 2018PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 May 2018
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Antheia C3NA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 32%.

Antheia C3: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises32%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes99%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes92%
Storm Water DrainsYes87%
Landscaping & Tree PlantingYes90%
Street LightingYes85%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes92%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes75%
Open ParkingYes80%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,648 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9978.96
Proposed, not sanctioned9,979 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio Thirty Architects and planners
EngineerJW Consultants LLP
PartnerRole in project
Mahindra Lifespace Developers limited-

Litigation declared2

CaseCourtStatus
926/2015Court of Civil Judge Senior Division PunePending
24692/2016High Court MumbaiPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Jul 2022

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: 1 Architect’s Certificate on Completion of Project (Form 4).pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FY 19 C3.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY20 Antheia C3.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 21 Signed RERA Certificate-Antheia C3.pdf13 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: C3 OC Copy.pdf21 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Antheia C3 form 5.pdf16 Feb 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Antheia Society Formation Certificate.pdf25 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 20_Q-IV_Antheia - Architect Certificate March 2020.pdf21 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 21_Q-I_Antheia - Architect Certificate June 2020.pdf21 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FY 21_Q-II_Antheia - Architect Certificate October 20.pdf21 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Antheia_Apr'20.pdf21 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Antheia_Jun'20.pdf21 Oct 2020
Certificates of CA (Form 3)File: Engineering Certificate_Antheia_Apr'20.pdf21 Oct 2020
Certificates of CA (Form 3)File: Antheia C3_RERA_Certificate_Mar20_compressed.pdf21 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q-III_Antheia - Architect Certificate January 20.pdf30 Apr 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY20_Q-III_ENGINEERS CERTIFICATE_January 20_ANTHEIA.pdf19 Feb 2020
Certificates of CA (Form 3)File: FORM 3 - TOWER C3 CA CERTIFICATE.pdf19 Feb 2020
Certificates of CA (Form 3)File: Antheia C3 Sept 2019_compressed.pdf29 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q-II_Antheia - Architect Certificate October'19.pdf10 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: Antheia C3.pdf4 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q-I_Antheia - Architect Certificate July'19_compressed.pdf30 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Antheia_compressed.pdf30 Jul 2019
Certificates of CA (Form 3)File: Antheia C3 CA July 2019_compressed.pdf30 Jul 2019
Certificates of CA (Form 3)File: Antheia C3_RERA_Certificate_March2019_final.pdf30 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Mahindra Antheha_compressed.pdf23 Apr 2019
Certificates of CA (Form 3)File: R1 Antheia C3 RERA Certificate.pdf11 Apr 2019
Certificates of CA (Form 3)File: Antheia C3_RERA_Certificate QIII.pdf11 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01 Antheia Architects Cert QIII.pdf25 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 Antheia Engineers Certificate QIII.pdf25 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R1 Arch Antheia Phase III.pdf23 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate-ANTHEIA.PDF23 Oct 2018
Certificates of CA (Form 3)File: R1 Antheia C3 RERA Certificate.pdf23 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Antheia Architects Certificate-June 18.pdf24 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Antheia Engineers Certificate June 18.pdf24 Jul 2018
Certificates of CA (Form 3)File: Antheia C3-CA certificate June-18.pdf24 Jul 2018
Building plan approvalFile: COMMENCEMENT CERTIFICATE.pdf22 May 2018
Layout approvalFile: Antheia Layout.pdf22 May 2018
PAN CardFile: PAN .pdf22 May 2018
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf22 May 2018
Details of encumbrancesFile: COMMENCEMENT CERTIFICATE.pdf22 May 2018
Copy of Layout Approval (in case of layout)File: Antheia Layout.pdf22 May 2018
Building Plan Approval (IOD)File: COMMENCEMENT CERTIFICATE.pdf22 May 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf22 May 2018
Declaration in FORM BFile: Form B C3.pdf22 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Antheia Arch Certi Mar'18 B3 C3.pdf22 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Antheia_Engg Certi Mar'18 B3 C3.pdf22 May 2018
Certificates of CA (Form 3)File: Antheia C3 CA Certi.pdf22 May 2018
Proforma of Allotment letterFile: AFS - Antheia Residential - C3.pdf22 May 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf22 May 2018

Promoter's earlier projects16

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
WindchimesMahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075454CompletedDec 2018Dec 2018
Boisar Phase IIGut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar238CompletedDec 2017Jun 2017
BOISAR Phase IGut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar359CompletedJun 2017Jan 2017
LartistaMahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 01821CompletedSep 2016Sep 2016
Avadi Phase IBlock No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee604CompletedJun 2016Apr 2016
AshvitaMahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072664CompletedJun 2016May 2016
Aura PH5Village Chauma Sector 110A Gurgaon Manesar Urban Complex150CompletedJan 2015Late, Sep 2016
Aura PH4Village Chauma Sector 110A Gurgaon Manesar Urban Complex142CompletedJan 2015Late, Dec 2015
Aura PH3Village Chauma Sector 110A Gurgaon Manesar Urban Complex110CompletedOct 2014Late, Aug 2015
Aura PH2Village Chauma Sector 110A Gurgaon Manesar Urban Complex166CompletedNov 2013Late, Oct 2014
Splendour Phase 2CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re233CompletedNov 2013Jun 2013
Aura PH1Village Chauma Sector 110A Gurgaon Manesar Urban Complex231CompletedMay 2013May 2013
AngelicaBldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai67CompletedMar 2013Mar 2013
AspenBldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai68CompletedDec 2012Dec 2012
Splendour Phase 1CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078265CompletedAug 2011Aug 2011
ChlorisMilestone 16 PART 3 Sector 19 Faridabad160CompletedJul 2011Jul 2011

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Antheia C3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri13,700+ in Pune

Builder: Mahindra Lifespace Developers limited

Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Antheia C3 is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Antheia C3?

The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Antheia C3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Antheia C3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Antheia C3?

The professionals named in the filing: Architect: Studio Thirty Architects and planners; Engineer: JW Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Antheia C3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Antheia C3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Antheia C3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.