Home / Browse projects / Pune, Maharashtra / MAHINDRA NESTALGIA
MAHINDRA NESTALGIA
By Mahindra Bloomdale Developers Limited
RG-MH-71177 · RERA P52100045784 · Last updated on MahaRERA portal: 22 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAHINDRA NESTALGIA is a Residential / Group Housing project by Mahindra Bloomdale Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100045784 on 9 Jun 2022. Possession is promised by 31 Aug 2027. 1 complaint is on record with the regulator.
At a glance
Project
- NameMAHINDRA NESTALGIA
- TypeResidential / Group Housing
- Location
- Pimpri nehru nagar road
- Pimpri
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411018
- Pincode411018
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045784
- ReraGenie IDRG-MH-71177
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Jun 2022
- Promised completion31 Aug 2027
- Revised completionNone
- Buildings2 building records
- Documents filed85 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | NA | 28 | 0 | 0 | 0 | 0 |
| Tower C | NA | 28 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 40%.
Tower A13%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 40% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower C10%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 10% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower A | 1 | 1 |
| Tower C | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sankalp Designers |
| Engineer | K C SHAH CONSULTANTS |
| Engineer | Rajesh Kumar |
| Chartered Accountant | ABD And Co LLP |
| Chartered Accountant | P G BHAGWAT LLP |
| Chartered Accountant | B K KHARE & CO |
| Partner | Role in project |
|---|---|
| Mahindra Bloomdale Developers Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12602763 | MOHINI PRADEEP THORAT | Mahindra Bloomdale Developers Limited | 12/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Aug 2027
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: Nestalgia FORM- 5 ( Phase-1 ).pdf | 22 Jun 2026 |
| Form 1File: Nestalgia - Phase 1-Architect Certificate Mar-26.pdf | 18 Apr 2026 |
| Form 2File: Engineering Certificate_Nestalgia_Mar26 Twr A C.pdf | 18 Apr 2026 |
| Form 3File: Nestalgia - Phase 1 - Q4 - Mar_FY 2025-26 - Certificate.pdf | 18 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold or Booked Inventory_Nestalgia Phase 1 and 2.pdf | 18 Apr 2026 |
| Form 1File: Nestalgia - Phase 1-Architect Certificate Dec-25.pdf | 15 Jan 2026 |
| Form 2File: Engineering Certificate_Nestalgia_Dec-25_Ph-1.pdf | 15 Jan 2026 |
| Form 3File: Nestalgia - Phase 1 - Q3 - Dec_FY 2025-26 - Certificate.pdf | 15 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure_Nestalgia Ph I.pdf | 15 Jan 2026 |
| Form 1File: Form 1 Nestalgia - Phase 1 Architect Certificate Sep-25-Tw A & C.pdf | 13 Oct 2025 |
| Form 2File: Form 2 Phase 1 Engineering Certificate_Nestalgia_Sep25 Tw A,C.pdf | 13 Oct 2025 |
| Form 3File: Form 3 Nestalgia - Phase 1 - Q1 - Sep_FY 2025-26 - Certificate.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Nestalgia_Ph I.pdf | 13 Oct 2025 |
| Form 1File: Form 1 Nestalgia - Phase 1 Architect Certificate Jun-25-Tw A & C.pdf | 18 Jul 2025 |
| Form 2File: Form 2 Phase 1 Engineering Certificate_Nestalgia_Jun25 Tw A,C.pdf | 18 Jul 2025 |
| Form 3File: Form 3 Nestalgia - Phase 1 - Q1 - June_FY 2025-26 - Certificate.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Nestalgia Ph I 1.pdf | 18 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certificate ph 1.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Ph1.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Ph1.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate ph1.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rera Quality 2A form.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Mar-24.pdf | 28 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Mar-24.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certificate-P1.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-P1.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate-P1.pdf | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certifcicate-p1final.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Nestalgia_Phase_1_Sept_24.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg certificate.pdf | 15 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM -5 Nestalgia Phase-1 (FY24).pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engg Certificate.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA.pdf | 17 Jul 2024 |
| Other - TechnicalFile: MBDL - Letter for updation of Authorized Signatories.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Mahindra Nestalgia QA certificate.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Phase 1 - 410223043521_0001.pdf | 18 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Phase 1 - 410223043441_0001.pdf | 18 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nestalgia phase-1.pdf | 18 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nestalgia - Architect Certificate Dec-23_signed.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P1 Engg Certificate.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P1 CA certificate.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate-1.pdf | 18 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Engg certificate 1.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate 1.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 signed Nestalgia Ph1 FY23.pdf | 14 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nestalgia - Architect Certificate Jun-23_signed.pdf | 17 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf | 17 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: A WING sold unsold july.pdf | 17 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: C WING sold unsold july.pdf | 17 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_Certificate_Nestalgia_Phase_1_signed.pdf | 17 Jul 2023 |
| Other - FinanceFile: PGB_MLDL RERA letter.pdf | 17 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: A WING_C WING_merged_compressed.pdf | 20 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Certificate.pdf | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nestalgia final Certificate Phase 1.pdf | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 15 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf | 15 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20220102_Nestalgia-Architect's Certificate.pdf | 13 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Engineering certificate.pdf | 13 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nestalgia Certificate Dec'22_signed-compressed.pdf | 13 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20221006_Rera Certificate.pdf | 14 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Sep 22.pdf | 14 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MBDL home ground cert_ Sep 22-signed.pdf | 14 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect cerificate.pdf | 20 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-1.pdf | 20 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Nestalgia Jun2022-signed_11zon.pdf | 20 Jul 2022 |
| Layout approvalFile: IOD Layout.pdf | 26 May 2022 |
| Building plan approvalFile: IOD LETTER.pdf | 26 May 2022 |
| Layout approvalFile: Layout Plan 130522.pdf | 26 May 2022 |
| PAN CardFile: PAN Card Mahindra Bloomdale 1.pdf | 26 May 2022 |
| Copy of the legal title reportFile: RERA Title Report_11zon.pdf | 26 May 2022 |
| Details of encumbrancesFile: Letter of Encumbrance.pdf | 26 May 2022 |
| Copy of Layout Approval (in case of layout)File: IOD Layout.pdf | 26 May 2022 |
| Copy of Layout Approval (in case of layout)File: Layout Plan 130522.pdf | 26 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD LETTER.pdf | 26 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy 130522.pdf | 26 May 2022 |
| Declaration about Commencement CertificateFile: Format D.pdf | 26 May 2022 |
| Declaration in FORM BFile: Form B_11zon.pdf | 26 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Nestalgia Architect Certificate 18522.pdf | 26 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Nestalgia.pdf | 26 May 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Mahindra Bloomdale 4BP50500020254 | MIHAN Khapari, Nagpur | Mar 2019 | Certificate Signed | May 2023 | Late, Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAHINDRA NESTALGIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pimpri13,700+ in Pune
Filed coordinates, straight-line distance. 189 registered projects within 2 km.
Godrej Emerald Waters
Godrej Properties Limited
Mahindra Citadel - Phase 5
Mahindra Lifespace Developers limited
Mahindra Citadel Phase 1
Mahindra Lifespace Developers limited
Bramha Sky Uzuri Phase 2
BRAMHA LEISURES PVT LTD
RAJVEER IMPERIA
Waghere Associates
KOHINOOR SHANGRILA PHASE 2
KOHINOOR PROPERTIES
Builder: Mahindra Bloomdale Developers Limited
Mahindra Bloomdale Developers Limited has 2 registrations on MahaRERA, including MAHINDRA NESTALGIA and Mahindra Nestalgia Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MAHINDRA NESTALGIA is delayed beyond 31 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAHINDRA NESTALGIA?
The registered promoter entity is Mahindra Bloomdale Developers Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAHINDRA NESTALGIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MAHINDRA NESTALGIA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MAHINDRA NESTALGIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAHINDRA NESTALGIA?
The professionals named in the filing: Architect: Sankalp Designers; Engineer: K C SHAH CONSULTANTS; Engineer: Rajesh Kumar; Chartered Accountant: ABD And Co LLP; Chartered Accountant: P G BHAGWAT LLP; Chartered Accountant: B K KHARE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHINDRA NESTALGIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback