Mahindra Citadel Phase 1
By Mahindra Lifespace Developers limited
RG-MH-64560 · RERA P52100047656 · Last updated on MahaRERA portal: 12 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 66 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mahindra Citadel Phase 1 is a Residential / Group Housing project by Mahindra Lifespace Developers limited in Pune, Maharashtra, registered with MahaRERA as P52100047656 on 17 Nov 2022. Possession is promised by 30 Jun 2028. 446 of the 448 units on this registration are recorded sold or booked, and 4 of 44 construction stages are filed complete.
At a glance
Project
- NameMahindra Citadel Phase 1
- TypeResidential / Group Housing
- Location
- Old Pune-Mumbai Highway
- Pimpri
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411018
- Pincode411018
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047656
- ReraGenie IDRG-MH-64560
Builder
- NameMahindra Lifespace Developers limited
- Entity typeCompany
- CINL45200MH1999PLC118949
- GSTIN27AAACG8904C1ZV
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- ChairpersonArun Kumar Tilak Raj Nanda
- Managing DirectorArvind Subramanian
- Other registrations66 more →
- Completed25 of 67
- No longer live20 lapsed, de-registered or revoked
- Declared earlier projects66 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Nov 2022
- Promised completion30 Jun 2028
- Revised completionNone
- Buildings4 building records
- Documents filed96 files
Current status
Figures as on 12 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | NA | 30 | 23 | 137 | 0 | 137 |
| Tower B | NA | 30 | 0 | 88 | 0 | 88 |
| Tower C | NA | 30 | 0 | 88 | 0 | 88 |
| Tower D | NA | 30 | 0 | 135 | 0 | 135 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.
Tower A9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower B9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower C9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower D9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Club House | Yes | 0% |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower A | 1 | 1 |
| Tower B | 1 | 1 |
| Tower C | 1 | 1 |
| Tower D | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | K C Shah Designs LLP |
| Engineer | Sachin Khot |
| Chartered Accountant | P G BHAGWAT LLP |
| Chartered Accountant | Nilesh Vasantlal Shah |
| Chartered Accountant | DELOITTE HASKINS & SELLS LLP |
| Partner | Role in project |
|---|---|
| Mahindra Lifespace Developers limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: CITADEL-Tower-ABCD_Signed Form 5 FY26.pdf | 12 Aug 2026 |
| Form 1File: Architect - Phase 1 Tower A B C and D.pdf | 16 Jul 2026 |
| Form 2File: Mahindra Citadel Phase I - Engineering Certificate_Jul26.pdf | 16 Jul 2026 |
| Form 3File: Citadel - Phase 1 - Q1 - FY 2026-27 - Certificate.pdf | 16 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold or Booked Inventory_Citadel (Horizon) all Phases.pdf | 16 Jul 2026 |
| Form 1File: Mahindra Citadel Phase I - Architect Certificate Mar-26 Final.pdf | 20 Apr 2026 |
| Form 2File: Mahindra Citadel Phase I - Engineering Certificate_Mar-26 Final.pdf | 20 Apr 2026 |
| Form 3File: CA Citadel - Phase 1 - Q4 - FY 2025-26 Final.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold or Booked Inventory_Citadel Phase 1234 Final.pdf | 20 Apr 2026 |
| Form 2A (FY 2025-2026)File: Quality assurance certificate FY 25-26 Tower ABCDIJK Final.pdf | 20 Apr 2026 |
| Form 1File: Mahindra Citadel Phase I - Architect Certificate Dec-25 Final.pdf | 19 Jan 2026 |
| Form 2File: Mahindra Citadel Phase I - Engineering Certificate-Dec-25 Final.pdf | 19 Jan 2026 |
| Form 3File: Citadel - Phase 1 - Q3 - FY 2025-26 - CA Certificate Final.pdf | 19 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Citadel Ph I.pdf | 19 Jan 2026 |
| Form 1File: Mahindra Citadel Phase I - Architect Certificate Sep'25 Final.pdf | 14 Oct 2025 |
| Form 2File: Mahindra Citadel Phase I - Engineering Certificate_Sep'25 Final.pdf | 14 Oct 2025 |
| Form 3File: Citadel - Phase 1 - Q2 - FY 2025-26 - Certificate Final.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Citadel_Ph I.pdf | 14 Oct 2025 |
| Form 5 (FY 2024-2025)File: 15_Form 5 Report - Mahindra Citadel Phase 1.pdf | 22 Sep 2025 |
| Form 1File: Mahindra Citadel Phase I - Architect Certificate Jun'25 signed.pdf | 17 Jul 2025 |
| Form 2File: Mahindra Citadel Phase I - Engineering Certificate_Jun'25 signed.pdf | 17 Jul 2025 |
| Form 3File: Citadel - Phase 1 - Q1 - FY 2025-26 signed.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Citadel Ph I.pdf | 17 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase I - Architect Certificate Mar'25_Signed comp.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel - Phase 1 - Q4 - FY 2024-25 - Certificate.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Phase I - Engineering Certificate_Mar'25_Signed Stamped.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance certificate FY 23-24 signed Final reduced.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase 1 signed compressed.pdf | 14 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel_-_Phase_1_-_Q3_-_FY_2024-25_-_Certificate signed.pdf | 14 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Phase I - Engineering Certificate_Dec'24 signed.pdf | 14 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel_Phase_1_sept24__.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase I - Architect Certificate Sep'24 signed_compressed 1.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Phase I - Engineering Certificate_Sep'24 signed.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Citadel Phase 1- Form 5- FY24.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase I - Architect Certificate Jun'24 Signd stamp_compressed.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Phase I - Engineering Certificate_Jun'24 r-signed.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel_-_Phase_1_-_Q1_-_FY_2024-25_Certificate.pdf | 17 Jul 2024 |
| Other - LegalFile: MLDL - Letter for updation of Authorized Signatories.pdf | 15 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase I - Architect Certificate Mar'24 Signed Form 1 stamped Reduced.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Phase I - Engineering Certificate_Mar'24 Signed c.pdf | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality assurance certificate FY 23-24 signed Final reduced.pdf | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality assurance certificate FY 23-24 signed Final reduced.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel Phase 1 CA Q4_R.pdf | 17 Apr 2024 |
| Building plan approvalFile: Rev Plan Tower A 14122023.pdf | 28 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Rev Plan Tower A 14122023.pdf | 28 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Citadel Ph1_arch cert Signed D.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Phase I - Engineering Certificate_Dec'23_signed D.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel - Phase 1 - Q3 - RERA Certificate_.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MLDL - Citadel - Phase I - Q2 - Certificate_signed_.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase I - Architect Certificate Sep'23_signed_11zon.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Phase I - Engineering Certificate_Sep'23_signed.pdf | 11 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Citadel Ph 1 Form 5 v1 FY 22-23.pdf | 28 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_CA Certificate_Citadel_June_2023_signed.pdf | 14 Jul 2023 |
| Other - FinanceFile: PGB_MLDL RERA letter.pdf | 14 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase I - Architect Certificate_Compressed.pdf | 7 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Phase I - Engineering Certificate_Mar'23_signed.pdf | 6 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Phase I - Engineering Certificate_Jun'23_signed.pdf | 6 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Mahindra Citadel - PHASE I Quality Certificate FY 23_signed_compressed.pdf | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel CA Certificate March 23_signed_11zon.pdf | 15 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mahindra Citadel Phase I - Engineering Certificate_Mar'23_signed.pdf | 11 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase I - Architect Certificate March'23-compressed.pdf | 8 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase I - Architect Certificate Dec'22_signed_compressed.pdf | 18 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Phase I - Engineering Certificate_Dec'22_Compressed.pdf | 18 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel December 22_signed.pdf | 18 Jan 2023 |
| Building plan approvalFile: Sanctioned Layout.pdf | 15 Nov 2022 |
| Building plan approvalFile: Tower A Typical Floor Plan.pdf | 15 Nov 2022 |
| Building plan approvalFile: Tower B Typical Floor Plan.pdf | 15 Nov 2022 |
| Building plan approvalFile: Tower C Typical Floor Plan.pdf | 15 Nov 2022 |
| Building plan approvalFile: Tower D Typical Floor Plan.pdf | 15 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Layout.pdf | 15 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower A Typical Floor Plan.pdf | 15 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower B Typical Floor Plan.pdf | 15 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower C Typical Floor Plan.pdf | 15 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower D Typical Floor Plan.pdf | 15 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: Letter of Encumbrances with respect to Finance.pdf | 11 Nov 2022 |
| Details of encumbrances concerned to LegalFile: Letter of Encumbrances with respect to Finance.pdf | 11 Nov 2022 |
| Layout approvalFile: Layout Approval.pdf | 31 Oct 2022 |
| Building plan approvalFile: Building Plan Approval.pdf | 31 Oct 2022 |
| PAN CardFile: MLDL PAN CARD.pdf | 31 Oct 2022 |
| Copy of the legal title reportFile: RERA Title Report.pdf | 31 Oct 2022 |
Promoter's earlier projects16
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Windchimes | Mahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075 | 454 | Completed | Dec 2018 | Dec 2018 |
| Boisar Phase II | Gut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar | 238 | Completed | Dec 2017 | Jun 2017 |
| BOISAR Phase I | Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar | 359 | Completed | Jun 2017 | Jan 2017 |
| Lartista | Mahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018 | 21 | Completed | Sep 2016 | Sep 2016 |
| Avadi Phase I | Block No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee | 604 | Completed | Jun 2016 | Apr 2016 |
| Ashvita | Mahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072 | 664 | Completed | Jun 2016 | May 2016 |
| Aura PH5 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 150 | Completed | Jan 2015 | Late, Sep 2016 |
| Aura PH4 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 142 | Completed | Jan 2015 | Late, Dec 2015 |
| Aura PH3 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 110 | Completed | Oct 2014 | Late, Aug 2015 |
| Aura PH2 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 166 | Completed | Nov 2013 | Late, Oct 2014 |
| Splendour Phase 2 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re | 233 | Completed | Nov 2013 | Jun 2013 |
| Aura PH1 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 231 | Completed | May 2013 | May 2013 |
| Angelica | Bldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai | 67 | Completed | Mar 2013 | Mar 2013 |
| Aspen | Bldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai | 68 | Completed | Dec 2012 | Dec 2012 |
| Splendour Phase 1 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078 | 265 | Completed | Aug 2011 | Aug 2011 |
| Chloris | Milestone 16 PART 3 Sector 19 Faridabad | 160 | Completed | Jul 2011 | Jul 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 66 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mahindra Citadel Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pimpri13,700+ in Pune
Filed coordinates, straight-line distance. 183 registered projects within 2 km.
Godrej Emerald Waters
Godrej Properties Limited
Mahindra Citadel - Phase 5
Mahindra Lifespace Developers limited
Bramha Sky Uzuri Phase 2
BRAMHA LEISURES PVT LTD
RAJVEER IMPERIA
Waghere Associates
KOHINOOR SHANGRILA PHASE 2
KOHINOOR PROPERTIES
Manikbaug Orchid
Waghere Promoters
Builder: Mahindra Lifespace Developers limited
Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Mahindra Citadel Phase 1 is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mahindra Citadel Phase 1?
The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 and GSTIN 27AAACG8904C1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mahindra Citadel Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mahindra Citadel Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mahindra Citadel Phase 1?
The professionals named in the filing: Engineer: K C Shah Designs LLP; Engineer: Sachin Khot; Chartered Accountant: P G BHAGWAT LLP; Chartered Accountant: Nilesh Vasantlal Shah; Chartered Accountant: DELOITTE HASKINS & SELLS LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mahindra Citadel Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback