RAJVEER IMPERIA
RG-MH-09847 · RERA P52100009270 · Last updated on MahaRERA portal: 26 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 11 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAJVEER IMPERIA is a Others project by Waghere Associates in Pune, Maharashtra, registered with MahaRERA as P52100009270 on 22 Aug 2017. Possession is promised by 30 Nov 2026. The completion date has moved by 11 months from the original filing. 256 of the 315 units on this registration are recorded sold or booked, and 53 of 66 construction stages are filed complete.
At a glance
Project
- NameRAJVEER IMPERIA
- TypeOthers
- Location
- Opp Annasaheb Magar Stadium
- Nehru Nagar
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411018
- Pincode411018
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100009270
- ReraGenie IDRG-MH-09847
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Aug 2017
- Promised completion30 Nov 2026
- Revised completionRevised to 30 Nov 2026 (originally 30 Dec 2025)
- Buildings6 building records
- Documents filed127 files
Current status
Figures as on 26 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Building | NA | 12 | 12 | 43 | 0 | 43 |
| B Building | NA | 12 | 12 | 65 | 0 | 65 |
| C Building | NA | 12 | 12 | 43 | 0 | 43 |
| D Building | NA | 12 | 12 | 43 | 0 | 43 |
| Building II | NA | 4 | 4 | 0 | 69 | 69 |
| Building III | NA | 10 | 10 | 40 | 12 | 52 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 26 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
53 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Installation of Lifts, at 95%.
A Building81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
B Building82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C Building82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D Building82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building II82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building III82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 95% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 95% |
| Open Parking | Yes | 0% |
Parking filed25
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A Building | 1 | 0 | 1 |
| B Building | 1 | 0 | 1 |
| C Building | 1 | 0 | 1 |
| D Building | 1 | 9 | 10 |
| Building III | 0 | 12 | 12 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Rajveer Imperia | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 22.73 cr | Rs 13.88 cr |
| Building III | NA | Rs 15.52 cr | Rs 13.48 cr |
| B Building | NA | Rs 12.90 cr | Rs 12.28 cr |
| Building II | NA | Rs 8.09 cr | Rs 8.04 cr |
| A Building | NA | Rs 7.82 cr | Rs 7.30 cr |
| D Building | NA | Rs 7.82 cr | Rs 7.12 cr |
| C Building | NA | Rs 7.65 cr | Rs 7.65 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SATYAJEET INAMDAR |
| Architect | I.P.ASSOCIATES |
| Engineer | CHANDRAKANT SAKOLE |
| Chartered Accountant | ANJK & CO LLP |
| Chartered Accountant | GN Mantri and Associates |
| Partner | Role in project |
|---|---|
| Waghere Associates | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Occupancy Certificate (OC) for the above-mentioned project has been duly obtained vide OC No. 1023/2025, the same is attached in the extension application. As the project has lapsed, we are currently unable to submit the correction application as per the latest sanctioned plans. Therefore, we are applying for an extension. Upon receipt of the extension approval, we will proceed with submitting the correction application, followed by the completion application.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Nov 2026
Documents filed127
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect Certificate Rajveer Imperia Dec 25.pdf | 26 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Rajveer Imperia Dec 25.pdf | 26 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Rajveer Imperia Dec 25.pdf | 26 Jul 2026 |
| Form 2A (FY 2025-2026)File: March 2025 2A.pdf | 26 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Rajveer Imperia Dec 25.pdf | 21 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Rajveer Imperia Dec 25.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Rajveer Imperia Dec 25.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Rajveer Imperia Dec 25.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Rajveer Imperia Dec 25.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Rajveer Imperia Dec 25.pdf | 21 Jul 2026 |
| Form 2A (FY 2024-2025)File: March 2025 2A.pdf | 21 Jul 2026 |
| Form 5 (FY 2024-2025)File: Form 5 2024-25 Rajveer Imperia - Signed.pdf | 28 May 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Rajveer Imperia Sept 25.pdf | 25 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Rajveer Imperia Dec 25.pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Rajveer Imperia Sept 25.pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Rajveer Imperia Dec 25.pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Rajveer Imperia Sept 25.pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Rajveer Imperia Dec 25.pdf | 25 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate - June 2025.pdf | 26 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate - June 2025.pdf | 26 Aug 2025 |
| Withdrawal Update Form 3File: CA Certificate - June 2025 - Sign.pdf | 26 Aug 2025 |
| Form 1File: Form 1 Architect Certificate Rajveer Imperia - March 2025.pdf | 8 Jul 2025 |
| Form 2File: Form 2 Engineer Certificate - March 2025 - Sign.pdf | 8 Jul 2025 |
| Form 3File: CA Certificate - March 2025 - Signed.pdf | 8 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - March 2025.pdf | 8 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Rajveer Imperia - March 2025_compressed.pdf | 8 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate - March 2025 - Sign.pdf | 8 Jul 2025 |
| Withdrawal Update Form 3File: CA Certificate - March 2025 - Signed.pdf | 8 Jul 2025 |
| Form 5 (FY 2023-2024)File: CA Form 5_FY 2023-24_Rajveer Imperia - Sign.pdf | 8 Jul 2025 |
| Form 5 (FY 2022-2023)File: CA Form 5_FY 2022-23_Rajveer Imperia - Sign.pdf | 8 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: March 2024 2A.pdf | 29 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 19_4_11zon.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 20_5_11zon.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 21_6_11zon.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 22_7_11zon.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 23_8_11zon.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 24_9_11zon.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 24_2_11zon.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 24_10_11zon.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 24_1_11zon.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 18_3_11zon.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 march 2020.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Sep 2024.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 June 2024.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 march 2024.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 march 2023.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 march 2022.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 march 2021.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 march 2019.pdf | 25 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 march 2018.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 19_19_11zon.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 24_11_11zon.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 24_12_11zon.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 24_13_11zon.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 24_14_11zon.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 22_16_11zon.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 21_17_11zon.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 20_18_11zon.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 18_20_11zon.pdf | 25 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 23_15_11zon.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure March 2021_7_11zon.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Dec 24_1_11zon.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sep 2024_2_11zon.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure June 2024_3_11zon.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure March 2024_4_11zon.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure March 2023_5_11zon.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure March 2022_6_11zon.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure March 2020_8_11zon.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure March 2019_9_11zon.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure March 2018_10_11zon.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: March 2023 2A.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: March 2024 2A Final.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate rajveer Imperia 01122022.pdf | 30 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 30 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form ५_2.pdf | 30 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form ५.pdf | 30 Mar 2023 |
| Details of encumbrancesFile: Encubarance १.pdf | 2 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Encubarance.pdf | 2 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Encubarance.pdf | 2 Jan 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Swapnapurti Phase II | S.No.312 1. Waghere Colony No.3 Pimpri Pune-411017 | 96 | Completed | May 2015 | Late, Jun 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 127 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RAJVEER IMPERIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nehru Nagar13,700+ in Pune
Filed coordinates, straight-line distance. 53 registered projects within 2 km.
Godrej Emerald Waters
Godrej Properties Limited
Mahindra Citadel - Phase 5
Mahindra Lifespace Developers limited
Mahindra Citadel Phase 1
Mahindra Lifespace Developers limited
Bramha Sky Uzuri Phase 2
BRAMHA LEISURES PVT LTD
KOHINOOR SHANGRILA PHASE 2
KOHINOOR PROPERTIES
Manikbaug Orchid
Waghere Promoters
Builder: Waghere Associates
Waghere Associates has 5 registrations on MahaRERA, including RAJVEER IMPERIA and Ritika Residency. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if RAJVEER IMPERIA is delayed beyond 30 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAJVEER IMPERIA?
The registered promoter entity is Waghere Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAJVEER IMPERIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAJVEER IMPERIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAJVEER IMPERIA?
The professionals named in the filing: Architect: SATYAJEET INAMDAR; Architect: I.P.ASSOCIATES; Engineer: CHANDRAKANT SAKOLE; Chartered Accountant: ANJK & CO LLP; Chartered Accountant: GN Mantri and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAJVEER IMPERIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback