Home / Browse projects / Pune, Maharashtra / KOHINOOR SHANGRILA PHASE 2

Completed No litigation declared Residential / Group Housing project

KOHINOOR SHANGRILA PHASE 2

By KOHINOOR PROPERTIES

RG-MH-22130 · RERA P52100030688 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
22 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 95%
4 of 260Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 190 documents Report an error

KOHINOOR SHANGRILA PHASE 2 is a Residential / Group Housing project by KOHINOOR PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100030688 on 8 Sep 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. 256 of the 260 units on this registration are recorded sold or booked, and 22 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKOHINOOR SHANGRILA PHASE 2
  • TypeResidential / Group Housing
  • Location
    • S NO 22 CTS NO 4688
    • PIMPRI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411018
  • Pincode411018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030688
  • ReraGenie IDRG-MH-22130

Builder

  • NameKOHINOOR PROPERTIES
  • Entity typePartnership
  • PartnerNITIN SURENDRA MITTAL
  • Other registrations4 more →
  • Completed4 of 5
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2021PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Sep 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed190 files

Current status

98%256 of 260 units booked
96.4%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA141142042
BNA26221740174
FNA141144044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 95%.

A94%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
F94%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes85%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed452

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots452
Closed/Covered452
BuildingClosed/CoveredTotal
A7070
B309309
F7373

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area15,900 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jun 2025
LandownerVillageDistrict
VIJAY LAXMAN SOMWANSHIPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI26537.15
Proposed, not sanctioned26,537 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR PLOT NO 421/A, GOKHALE ROAD, ASHOKNAGAR PUNE 411016
Estimated costRs 139.95 cr
Cost incurredRs 134.94 cr
Work done96.43%
BuildingWingEstimatedIncurred
BNARs 88.19 crRs 85.58 cr
ANARs 22.38 crRs 21.71 cr
FNARs 22.38 crRs 21.71 cr
-NARs 7.00 crRs 5.93 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK a architecture
EngineerPlanedge Consultants Pvt. Ltd.
Chartered AccountantBHANDARI S A A J & ASSOCIATES
Chartered AccountantJAYESH N JAIN & ASSOCIATES
PartnerRole in project
KOHINOOR PROPERTIES-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12603192KOHINOOR PROPERTIESDISILVA LAWRENCE KISTU28/05/2026
CC12604012Sankalpa Shrihari GarudKOHINOOR PROPERTIES27/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed190

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 190 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: PART OC_K SHANGRILA.pdf23 May 2026
Occupational CertificateFile: FINAL OC_ K SHANGRILA.pdf23 May 2026
Occupational CertificateFile: OC MAIL.pdf23 May 2026
Occupational CertificateFile: FORM 4.pdf23 May 2026
Withdrawal Update Form 1File: FORM 1_SHANGRILA PH II.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf20 Jan 2026
Layout approvalFile: 01-13.pdf10 Dec 2025
Layout approvalFile: 02-13.pdf10 Dec 2025
Layout approvalFile: 03-13.pdf10 Dec 2025
Layout approvalFile: 04-13.pdf10 Dec 2025
Layout approvalFile: 05-13.pdf10 Dec 2025
Layout approvalFile: 06-13.pdf10 Dec 2025
Layout approvalFile: 07-13.pdf10 Dec 2025
Layout approvalFile: 08-13.pdf10 Dec 2025
Layout approvalFile: 09-13.pdf10 Dec 2025
Layout approvalFile: 10-13.pdf10 Dec 2025
Layout approvalFile: 11-13.pdf10 Dec 2025
Layout approvalFile: 12-13.pdf10 Dec 2025
Layout approvalFile: 13-13.pdf10 Dec 2025
Building plan approvalFile: 01-13.pdf6 Dec 2025
Building plan approvalFile: 02-13.pdf6 Dec 2025
Building plan approvalFile: 03-13.pdf6 Dec 2025
Building plan approvalFile: 04-13.pdf6 Dec 2025
Building plan approvalFile: 05-13.pdf6 Dec 2025
Building plan approvalFile: 06-13.pdf6 Dec 2025
Building plan approvalFile: 07-13.pdf6 Dec 2025
Building plan approvalFile: 08-13.pdf6 Dec 2025
Building plan approvalFile: 09-13.pdf6 Dec 2025
Building plan approvalFile: 10-13.pdf6 Dec 2025
Building plan approvalFile: 11-13.pdf6 Dec 2025
Building plan approvalFile: 12-13.pdf6 Dec 2025
Building plan approvalFile: 13-13.pdf6 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A_Shangrilla.pdf15 Nov 2025
Form 5 (FY 2024-2025)File: Form 05_Shangrilla.pdf7 Nov 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf4 Nov 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf4 Nov 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf4 Nov 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf4 Nov 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf4 Nov 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf4 Nov 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf3 Nov 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf3 Nov 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf3 Nov 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf31 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf31 Oct 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf31 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf30 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf30 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf27 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf25 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf25 Oct 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf25 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf24 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf24 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf20 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf20 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf20 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf20 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf20 Oct 2025
Withdrawal Update Form 1File: FORM 1-SHANGRILA PHASE II.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 02_Shangrilla.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 03_Shangrilla.pdf20 Oct 2025

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KOHINOOR SHANGRILA PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIMPRI13,700+ in Pune

2 kmKOHINOOR SHANGRILA PHASECompleted 55Lapsed / revoked 35Other 144Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: KOHINOOR PROPERTIES

Kohinoor Properties has 5 registrations on MahaRERA, including KOHINOOR IRIS PARK and KOHINOOR BLISSPARK. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KOHINOOR SHANGRILA PHASE 2 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KOHINOOR SHANGRILA PHASE 2?

The registered promoter entity is KOHINOOR PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KOHINOOR SHANGRILA PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KOHINOOR SHANGRILA PHASE 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KOHINOOR SHANGRILA PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KOHINOOR SHANGRILA PHASE 2?

The professionals named in the filing: Architect: VK a architecture; Engineer: Planedge Consultants Pvt. Ltd.; Chartered Accountant: BHANDARI S A A J & ASSOCIATES; Chartered Accountant: JAYESH N JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KOHINOOR SHANGRILA PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KOHINOOR SHANGRILA PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KOHINOOR SHANGRILA PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.