Bramha Sky Uzuri Phase 2

By BRAMHA LEISURES PVT LTD

RG-MH-88289 · RERA P52100046261 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 93%
157 of 315Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

Bramha Sky Uzuri Phase 2 is a Commercial project by BRAMHA LEISURES PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100046261 on 20 Jun 2022. Possession is promised by 31 Dec 2027. 158 of the 315 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameBramha Sky Uzuri Phase 2
  • TypeCommercial
  • Location
    • Pimpri Gaon
    • Pimpri Waghire
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411018
  • Pincode411018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100046261
  • ReraGenie IDRG-MH-88289

Builder

  • NameBRAMHA LEISURES PVT LTD
  • Entity typeCompany
  • Managing DirectorVISHAL SURENDRAKUMAR AGARWAL
  • DirectorShivani Vishal Agarwal
  • ChairpersonSURENDRAKUMAR BRAMHADUTT AGRAWAL
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed135 files

Current status

50%158 of 315 units booked

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building BNA17110315315

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 93%.

Building B: 58% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed127

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots127
Closed/Covered127

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,577 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Aug 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI16494.84
Proposed, not sanctioned12,832 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUYOG PLAZA, 1278 JUNGLI MAHARAJ RD, DECCAN GYMKHANA,PUNE 411003

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX ARCHITECTS ASSOCIATES
EngineerCUBIX ARCHITECTS ASSOCIATES
Chartered AccountantASAK & co
Chartered AccountantPatel and Sharma Chartered Accountants
PartnerRole in project
BRAMHA LEISURES PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 2File: FORM -2 31-12-2023.pdf18 Jun 2026
Form 3File: FORM-3 31-12-2023.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD 31-12-2023.pdf18 Jun 2026
Form 2File: FORM -2 31-12-2023.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 3File: FORM-3 30-06-2024.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD 30-06-2024.pdf18 Jun 2026
Form 2File: FORM -2 31-12-2023.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 3File: FORM-3 30-06-2024.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD 30-06-2024.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 3File: FORM-3 11-10-2024.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD 30-09-2024.pdf18 Jun 2026
Form 2File: FORM -2 31-12-2023.pdf18 Jun 2026
Form 2File: FORM -2 31-12-2023.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD 31-12-2024.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Form 3File: Form 3.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 2File: FORM -2.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD 31-03-2025.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 2File: FORM -2.pdf18 Jun 2026
Form 3File: FORM-3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 2File: FORM -2.pdf18 Jun 2026
Form 3File: FORM-3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 2File: FORM -2.pdf18 Jun 2026
Form 3File: FORM-3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 2File: FORM -2.pdf18 Jun 2026
Form 3File: FORM-3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 2File: FORM -2.pdf18 Jun 2026
Form 3File: FORM-3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD.pdf18 Jun 2026
Form 1File: Form 1_0001.pdf18 Jun 2026
Form 2File: FORM -2.pdf18 Jun 2026
Form 3File: FORM-3.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: LEISURES SOLD UNSOLD.pdf18 Jun 2026
Form 5 (FY 2024-2025)File: form 5_0001.pdf24 Dec 2025
Disclosure of sold/ booked inventoryFile: sold-unsold sky uzuri ph 2 mar 24.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: sold -unsold sky zuri ph 2 june 24.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: sold-unsold sky uzuri ph 2 sept 24.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: sold-unsold sky uzuri ph 2 dec 24.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 sky uzuri Ph 2 jun 24_0001.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 sky uzuri ph 2 sept 24_0001.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 sky uzuri ph 2 dec24_0001.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 form 3 dec-24 (1).pdf15 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: BRAMHA LEISURES PVT LTD PH-2 FORM 5.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLPL FORM 3 SKY UZURI PHASE 2 300624 SIGNED1_compressed.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLPL FORM 3 SKY UZURI PHASE 2 111024 SIGNED_compressed.pdf6 Dec 2024
Declaration in FORM BFile: Form B Sky Uzuri Phase 2.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 30062022.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 30092022.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 31122022.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 31032023.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 30062023.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 30092023.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 07 31122023.pdf10 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sky Uzuri Phase 2.pdf10 May 2024
Declaration about Commencement CertificateFile: LEISURES FORMAT-D 02012024.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 00 Form 2A 30092023.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 01 Form 2A 25042024.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: 03 LEISURES SOLD UNSOLD 31032023_compressed.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: 04 LEISURES SOLD UNSOLD 30062023_2_11zon.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: 05 LEISURES SOLD UNSOLD 30092023_3_11zon.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: 06 LEISURES SOLD UNSOLD 31122023_compressed.pdf3 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf3 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement to Sale.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 00 Form -2 Dt 30062022.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 Form -2 Dt 30092022.pdf1 May 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
BRAMHA SKYCITY PHASE- ISERVEY NO 25 & 25A VILAGE- DHANORI TALUKA- HAVELI DIST- PUNE270CompletedSep 2016Sep 2016
BRAMHA SKYCITY PHASE- 1SURVEY NO 25 25A VILAGE- DHANORI TALUKA- HAVELI DIST- PUNE257CompletedSep 2016Late, Jul 2017

How this compares with Pune

50%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bramha Sky Uzuri Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri Waghire13,700+ in Pune

2 kmBramha Sky Uzuri Phase 2Completed 76Lapsed / revoked 43Other 158Dot size: filed unitsN

Filed coordinates, straight-line distance. 277 registered projects within 2 km.

Builder: BRAMHA LEISURES PVT LTD

BRAMHA LEISURES PVT LTD has 2 registrations on MahaRERA, including BRAMHA SKYUZURI PHASE 1 and Bramha Sky Uzuri Phase 2. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Bramha Sky Uzuri Phase 2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bramha Sky Uzuri Phase 2?

The registered promoter entity is BRAMHA LEISURES PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bramha Sky Uzuri Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bramha Sky Uzuri Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bramha Sky Uzuri Phase 2?

The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: CUBIX ARCHITECTS ASSOCIATES; Chartered Accountant: ASAK & co; Chartered Accountant: Patel and Sharma Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bramha Sky Uzuri Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bramha Sky Uzuri Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bramha Sky Uzuri Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.