Home / Browse projects / Mumbai Suburban, Maharashtra / M Space

Completed No litigation declared Commercial project

M Space

By Mahindra Lifespace Developers limited

RG-MH-09129 · RERA P51800000179 · Last updated on MahaRERA portal: 7 Jun 2021

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2021Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

M Space is a Commercial project by Mahindra Lifespace Developers limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000179 on 10 Jul 2017. The registration is recorded completed; possession was promised by 29 Mar 2021. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameM Space
  • TypeCommercial
  • Location
    • Borivali
    • Mumbai Suburban
    • 400062
  • Pincode400062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800000179
  • ReraGenie IDRG-MH-09129

Builder

  • NameMahindra Lifespace Developers limited
  • Entity typeCompany
  • CINL45200MH1999PLC118949
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonArun Kumar Tilak Raj Nanda
  • Managing DirectorArvind Subramanian
  • Other registrations66 more →
  • Completed25 of 67
  • No longer live20 lapsed, de-registered or revoked
  • Declared earlier projects66 →

Key dates

this monthRegisteredJul 2017First promiseSep 2019Revised toMar 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Jul 2017
  • Promised completion29 Mar 2021
  • Revised completionRevised to 29 Mar 2021 (originally 30 Sep 2019)
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CommercialNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jun 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Commercial: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Jun 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,291 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2581.2
Proposed, not sanctioned2,581 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5 C II Mittal Court 224 Nariman Point Mumbai Maharashtra 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Hafeez Contractor
ArchitectSunil Ambre & Associates
EngineerJ+W Consultant LLP
PartnerRole in project
Mahindra Lifespace Developers limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800002454Sep 2019 → Sep 2020

Reason as filed by the promoterAs per annexure uploaded

Litigation declared1

CaseCourtStatus
2110/2004High Court MumbaiPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Dec 2020

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: M Space Form3 Mar-21.pdf7 Jun 2021
Certificates of CA (Form 3)File: Eminente Dec'20 certificate.pdf3 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architects Certificate Sept 2020.pdf9 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineers Certificate Sept 2020.pdf9 Dec 2020
Certificates of CA (Form 3)File: RERA CA Certificate Eminente Sept 2020.pdf9 Dec 2020
Certificates of CA (Form 5)File: Eminate.pdf9 Dec 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Commercial Wing OC Certificate.pdf9 Dec 2020
Architect’s Certificate on Completion of Project (Form 4)File: Architect Completion Certificate Oct 2020.pdf9 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MLDL - March 2020 Architect R1_1.pdf22 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MLDL - June 2020 Architect R1_1.pdf22 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MLDL - March 2020 Engineer R1_1.pdf22 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MLDL - March 2020 Engineer R1_1.pdf22 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MLDL - June 2020 Engineer R1_1.pdf22 Aug 2020
Certificates of CA (Form 3)File: MLDL - March 2020 CA.pdf22 Aug 2020
Certificates of CA (Form 3)File: MLDL - March 2020 CA.pdf22 Aug 2020
Certificates of CA (Form 3)File: MLDL - March 2020 CA.pdf22 Aug 2020
Certificates of CA (Form 3)File: MLDL - June 2020 CA.pdf22 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DEC-2019 Architects Certificate MLDL (1).pdf31 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec Sanrachna Engineer's Certificate.pdf31 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec Sanrachna Engineer's Certificate.pdf31 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec Sanrachna Engineer's Certificate.pdf31 Jan 2020
Certificates of CA (Form 3)File: Eminente Certificate Dec19-.pdf31 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Sept 2019-Q2.pdf16 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sept 2019-Q2.pdf16 Oct 2019
Certificates of CA (Form 3)File: CA Certificate Sept 2019-Q2.pdf16 Oct 2019
Certificates of CA (Form 5)File: MSpace.pdf4 Oct 2019
Certificates of CA (Form 5)File: Mspace FORM 5_opt.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE june 2019.pdf22 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-MLS__opt.pdf22 Jul 2019
Certificates of CA (Form 3)File: M Space_CA Certificate June-2019.pdf22 Jul 2019
Certificates of CA (Form 3)File: M Space_CA Certificate June-2019.pdf22 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: M Space 4th quarter Architects Cetificate.pdf14 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: M space-april'19-EC.pdf14 Apr 2019
Certificates of CA (Form 3)File: M Space_RERA_Certificate_opt.pdf14 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MLDL - ARCHITECT'S CERTIFICATE-DEC 2018_opt.pdf15 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MLDL - ENGINEER'S CERTIFICATE-DEC 2018_opt.pdf15 Jan 2019
Certificates of CA (Form 3)File: M Space_RERA_Certificate_opt.pdf15 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahindra M Space Architects Cetificate.pdf17 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mahindra - M Space Engineers Cetificate sept2018.pdf17 Oct 2018
Certificates of CA (Form 3)File: M Space_RERA_Certificate_opt1.pdf17 Oct 2018
Certificates of CA (Form 5)File: M SPACE P51800000179.pdf8 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cetificate June2018.pdf17 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE 2018_ENGINEER'S CERTIFICATE_MLDL_opt.pdf17 Jul 2018
Certificates of CA (Form 3)File: M Space Centre_Final RERA CACertificate_June 2018.pdf17 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate_April-2018.pdf17 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certificate_april-2018.pdf17 Apr 2018
Certificates of CA (Form 3)File: M Space_RERA_Certificate March 2018 (002)_opt_opt.pdf17 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate_Dec 2017_opt.pdf16 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Dec2017_opt.pdf16 Feb 2018
Certificates of CA (Form 3)File: CA certificate Dec 17_opt_opt_opt.pdf16 Feb 2018
Declaration in FORM BFile: M Space Form B.pdf7 Jul 2017
Layout approvalFile: M Space Layout.pdf6 Jul 2017
Layout approvalFile: M Space Layout 1.pdf6 Jul 2017
Copy of Layout Approval (in case of layout)File: M Space Layout.pdf6 Jul 2017
Copy of Layout Approval (in case of layout)File: M Space Layout 1.pdf6 Jul 2017
Certificates of CA (Form 3)File: M Space CA Certificate.pdf6 Jul 2017
Proforma of Allotment letterFile: M Space Agreement For Sale and PR Card.pdf6 Jul 2017
Copy of the legal title reportFile: M Space Title report.pdf5 Jul 2017
Details of encumbrancesFile: M Space Encumbrance Clearance.pdf5 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: M Space Architects Cetificate.pdf5 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: M Space Engineers Cetificate.pdf5 Jul 2017
Building plan approvalFile: M Space IOD Plan.pdf4 Jul 2017
Building Plan Approval (IOD)File: M Space IOD Plan.pdf4 Jul 2017
Building plan approvalFile: IOD M Space.pdf3 Jul 2017
Building Plan Approval (IOD)File: IOD M Space.pdf3 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC M Space.pdf3 Jul 2017
PAN CardFile: MLDL PAN.pdf30 Jun 2017

Promoter's earlier projects16

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
WindchimesMahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075454CompletedDec 2018Dec 2018
Boisar Phase IIGut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar238CompletedDec 2017Jun 2017
BOISAR Phase IGut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar359CompletedJun 2017Jan 2017
LartistaMahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 01821CompletedSep 2016Sep 2016
Avadi Phase IBlock No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee604CompletedJun 2016Apr 2016
AshvitaMahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072664CompletedJun 2016May 2016
Aura PH5Village Chauma Sector 110A Gurgaon Manesar Urban Complex150CompletedJan 2015Late, Sep 2016
Aura PH4Village Chauma Sector 110A Gurgaon Manesar Urban Complex142CompletedJan 2015Late, Dec 2015
Aura PH3Village Chauma Sector 110A Gurgaon Manesar Urban Complex110CompletedOct 2014Late, Aug 2015
Aura PH2Village Chauma Sector 110A Gurgaon Manesar Urban Complex166CompletedNov 2013Late, Oct 2014
Splendour Phase 2CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re233CompletedNov 2013Jun 2013
Aura PH1Village Chauma Sector 110A Gurgaon Manesar Urban Complex231CompletedMay 2013May 2013
AngelicaBldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai67CompletedMar 2013Mar 2013
AspenBldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai68CompletedDec 2012Dec 2012
Splendour Phase 1CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078265CompletedAug 2011Aug 2011
ChlorisMilestone 16 PART 3 Sector 19 Faridabad160CompletedJul 2011Jul 2011

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep M Space on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmM SpaceCompleted 136Lapsed / revoked 71Abeyance 1Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 344 registered projects within 2 km.

Builder: Mahindra Lifespace Developers limited

Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if M Space is delayed beyond 29 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of M Space?

The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in M Space?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for M Space?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at M Space?

The professionals named in the filing: Architect: Architect Hafeez Contractor; Architect: Sunil Ambre & Associates; Engineer: J+W Consultant LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in M Space?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About M Space. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save M Space to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.