Mahindra Vista Phase 2

By Mahindra Lifespace Developers limited

RG-MH-30812 · RERA P51800079147 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 66 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Mahindra Vista Phase 2 is a Others project by Mahindra Lifespace Developers limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079147 on 10 Feb 2025. Possession is promised by 31 Dec 2030.

At a glance

Project

  • NameMahindra Vista Phase 2
  • TypeOthers
  • Location
    • Akurli Road
    • Kandivali East
    • Akurli
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800079147
  • ReraGenie IDRG-MH-30812

Builder

  • NameMahindra Lifespace Developers limited
  • Entity typeCompany
  • CINL45200MH1999PLC118949
  • GSTIN33AAACG8904C1Z2
  • ChairpersonArun Kumar Tilak Raj Nanda
  • Managing DirectorArvind Subramanian
  • Other registrations66 more →
  • Completed25 of 67
  • No longer live20 lapsed, de-registered or revoked
  • Declared earlier projects66 →

Key dates

this monthRegisteredFeb 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Feb 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower D/Wing DNA420000
Tower E/Wing ENA410000
Tower F/Wing FNA410000
Retail/ShopNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

Tower D/Wing D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower E/Wing E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower F/Wing F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Retail/Shop0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered3
Open Space27
BuildingClosed/CoveredOpen SpaceTotal
Tower D/Wing D1910
Tower E/Wing E1910
Tower F/Wing F1910

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area29,421 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI60915.2
Proposed, not sanctioned56,723 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch12-A Mittal Tower 1st Floor Nariman Point Mumbai 21

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Hafeez Contractor
EngineerVinyasa Consultant
Chartered AccountantP G BHAGWAT LLP
Chartered AccountantNilesh Vasantlal Shah
PartnerRole in project
Mahindra Lifespace Developers limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: VISTA II Form 1 Mar26.pdf17 Apr 2026
Form 2File: Vista Form2 Ph2 Mar26.pdf17 Apr 2026
Form 3File: Vista Form3 Ph2 Mar26.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: Vista PH2 Promoters Disclosure Q4 Mar26.pdf17 Apr 2026
OthersFile: Vista Form2A PH2 FY26.pdf17 Apr 2026
Form 1File: Vista Form1 Ph-2 Dec-25.pdf16 Jan 2026
Form 2File: Vista Form2 Ph-2 Dec-25.pdf16 Jan 2026
Form 3File: Vista Form3 Ph-2 Dec-25.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Vista PH2 Promoters Disclosure Q3 Dec-25.pdf16 Jan 2026
Form 1File: Form1 PH-2 Q2 FY25-26.pdf15 Oct 2025
Form 2File: Form2 PH-2 Vista Q2(FY-25-26).pdf15 Oct 2025
Form 3File: Form3 Phase_2_Qtr Signed.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Promoters Disclosure Vista PH2.pdf15 Oct 2025
Form 5 (FY 2024-2025)File: 11_Form 5 Report - Mahindra Vista Phase2.pdf23 Sep 2025
Form 1File: Form 1 Ph-2 Vista Q1 (FY25-26).pdf17 Jul 2025
Form 2File: Form2 PH-2 Vista Q1(FY25-26).pdf17 Jul 2025
Form 3File: Form3 PH-2 Vista Q1(FY25-26).pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: LDisclosure Sold & Booked Ph-2 Q1 (FY25-26).pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04_VISTA_MIS_Mar25__Phase_II.pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A PH-2 FY24-25.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VISTA 2 JAN TO MARCH 2025.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL_VISTA_PHASE 2_ Q4_MAR'25-FINAL.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ph-2 Mar-25.pdf8 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 Ph-2 Mar-25.pdf8 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A PH-2 FY24-25.pdf8 Apr 2025
Layout approvalFile: ARCHITECT LETTER.pdf7 Feb 2025
Copy of Layout Approval (in case of layout)File: ARCHITECT LETTER.pdf7 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: 31012025SECURE UNSECURE CA R1.pdf31 Jan 2025
Building plan approvalFile: 1 LAYOUT PLAN.pdf30 Jan 2025
Building plan approvalFile: 2 RETAIL LOWER GROUND R1.pdf30 Jan 2025
Building plan approvalFile: 3 RETAIL UPPER GROUND R1.pdf30 Jan 2025
Building plan approvalFile: 4 PODIUM 1 PLAN RETAIL DOUBLE HEIGHT.pdf30 Jan 2025
Building plan approvalFile: 5 RETAIL PODIUM 2 PLAN.pdf30 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Legal Finance.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 5 RETAIL PODIUM 2 PLAN.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 PODIUM 1 PLAN RETAIL DOUBLE HEIGHT.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 RETAIL UPPER GROUND R1.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 RETAIL LOWER GROUND R1.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 LAYOUT PLAN.pdf30 Jan 2025
Other - LegalFile: P R Card.pdf30 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrance Letter Legal Finance.pdf30 Jan 2025
Other - LegalFile: Index II Vista.pdf29 Jan 2025
Layout approvalFile: 1 LAYOUT PLAN.pdf22 Jan 2025
Building plan approvalFile: 2 RETAIL UPPER GROUND.pdf22 Jan 2025
Building plan approvalFile: 3 RETAIL LOWER GROUND.pdf22 Jan 2025
Building plan approvalFile: 4 PODIUM 1 PLAN.pdf22 Jan 2025
Building plan approvalFile: 5 PODIUM 2 PLAN.pdf22 Jan 2025
Building plan approvalFile: 6 PODIUM 3 PLAN.pdf22 Jan 2025
Building plan approvalFile: 7 PODIUM 4 PLAN.pdf22 Jan 2025
Building plan approvalFile: 8 PODIUM 5 PLAN.pdf22 Jan 2025
Building plan approvalFile: 9 PODIUM 6 RESI PLAN.pdf22 Jan 2025
Building plan approvalFile: 10 TOWER F TYPICAL FLR PLAN.pdf22 Jan 2025
Building plan approvalFile: 11 TOWER E TYPICAL FLR PLAN.pdf22 Jan 2025
Building plan approvalFile: 12 TOWER D TYPICAL FLR PLAN.pdf22 Jan 2025
Building plan approvalFile: 13 SECTION TOWER F.pdf22 Jan 2025
Building plan approvalFile: 14 SECTION TOWER E.pdf22 Jan 2025
Building plan approvalFile: 15 SECTION TOWER D.pdf22 Jan 2025
Building plan approvalFile: 7 PODIUM 6 PLAN.pdf22 Jan 2025
PAN CardFile: MLDL PAN.pdf22 Jan 2025
Copy of the legal title reportFile: MLDL Title Report.pdf22 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrances Letter Legal Vista P2 1.pdf22 Jan 2025
Copy of Layout Approval (in case of layout)File: 1 LAYOUT PLAN.pdf22 Jan 2025
Proforma of Allotment letterFile: Allotment Letter Mahindra Vista P2.pdf22 Jan 2025
Declaration in FORM BFile: Form B with BR copy.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vista Ph 2 CA Form 3.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vista Ph 2 Form 2.pdf22 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 2459925 FirstCC signed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 7 PODIUM 6 PLAN.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 15 SECTION TOWER D.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 14 SECTION TOWER E.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 13 SECTION TOWER F.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 12 TOWER D TYPICAL FLR PLAN.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 10 TOWER F TYPICAL FLR PLAN.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 9 PODIUM 6 RESI PLAN.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 8 PODIUM 5 PLAN.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 7 PODIUM 4 PLAN.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 PODIUM 3 PLAN.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 5 PODIUM 2 PLAN.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 PODIUM 1 PLAN.pdf22 Jan 2025

Promoter's earlier projects16

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
WindchimesMahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075454CompletedDec 2018Dec 2018
Boisar Phase IIGut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar238CompletedDec 2017Jun 2017
BOISAR Phase IGut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar359CompletedJun 2017Jan 2017
LartistaMahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 01821CompletedSep 2016Sep 2016
Avadi Phase IBlock No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee604CompletedJun 2016Apr 2016
AshvitaMahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072664CompletedJun 2016May 2016
Aura PH5Village Chauma Sector 110A Gurgaon Manesar Urban Complex150CompletedJan 2015Late, Sep 2016
Aura PH4Village Chauma Sector 110A Gurgaon Manesar Urban Complex142CompletedJan 2015Late, Dec 2015
Aura PH3Village Chauma Sector 110A Gurgaon Manesar Urban Complex110CompletedOct 2014Late, Aug 2015
Aura PH2Village Chauma Sector 110A Gurgaon Manesar Urban Complex166CompletedNov 2013Late, Oct 2014
Splendour Phase 2CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re233CompletedNov 2013Jun 2013
Aura PH1Village Chauma Sector 110A Gurgaon Manesar Urban Complex231CompletedMay 2013May 2013
AngelicaBldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai67CompletedMar 2013Mar 2013
AspenBldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai68CompletedDec 2012Dec 2012
Splendour Phase 1CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078265CompletedAug 2011Aug 2011
ChlorisMilestone 16 PART 3 Sector 19 Faridabad160CompletedJul 2011Jul 2011

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahindra Vista Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali East6,700+ in Mumbai Suburban

2 kmMahindra Vista Phase 2Completed 21Lapsed / revoked 12Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: Mahindra Lifespace Developers limited

Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Mahindra Vista Phase 2 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahindra Vista Phase 2?

The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 and GSTIN 33AAACG8904C1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahindra Vista Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mahindra Vista Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahindra Vista Phase 2?

The professionals named in the filing: Architect: Architect Hafeez Contractor; Engineer: Vinyasa Consultant; Chartered Accountant: P G BHAGWAT LLP; Chartered Accountant: Nilesh Vasantlal Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahindra Vista Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahindra Vista Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahindra Vista Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.