Completed No litigation declared Residential / Group Housing project

Centro MHADA

By Mahindra Lifespace Developers limited

RG-MH-22159 · RERA P52100030814 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2023Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 90%
1Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

Centro MHADA is a Residential / Group Housing project by Mahindra Lifespace Developers limited in Pune, Maharashtra, registered with MahaRERA as P52100030814 on 14 Sep 2021. The registration is recorded completed; possession was promised by 28 Feb 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameCentro MHADA
  • TypeResidential / Group Housing
  • Location
    • Nehru nagar road
    • Pimpri
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411018
  • Pincode411018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030814
  • ReraGenie IDRG-MH-22159

Builder

  • NameMahindra Lifespace Developers limited
  • Entity typeCompany
  • CINL45200MH1999PLC118949
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonArun Kumar Tilak Raj Nanda
  • Managing DirectorArvind Subramanian
  • Other registrations66 more →
  • Completed25 of 67
  • No longer live20 lapsed, de-registered or revoked
  • Declared earlier projects66 →

Key dates

this monthRegisteredSep 2021PromisedFeb 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Sep 2021
  • Promised completion28 Feb 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Centro MHADANA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Centro MHADA: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered11
Open Space17

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,527 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3272.92
Proposed, not sanctioned3,273 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKotak Mahindra Bank Limited, 5-c/II, Mittal court, 224, Nariman point, opp Vidhan Bhavan Mumbai-4000

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMadivala Qutub & Associates
EngineerSamartha Constro Consultants LLP
Chartered AccountantA B D and CO LLP
PartnerRole in project
Mahindra Lifespace Developers limited-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000269337Centro Mhada Cooperative Housing Society Ltd. Through its Authorized Person Mr. Sachin Kisan PabaleMahindra Lifespace Developers Limited Through its Managing Director Mr. Arvind Subramanian24/08/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Apr 2023

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Centro Mhada.pdf30 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Tower 2, Mhada , Club House OC.pdf17 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form_4_-_MHADA.PDF17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centralis - Architect Certificate Dec'22 MHADA_signed.pdf13 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_Centralis_Dec'22 MHADA_signed.pdf13 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE_FY 22-23 - Dec'22.pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Centralis MHADA EWS - Dec 2022_signed.pdf13 Jan 2023
Layout approvalFile: Revised Layout plan.pdf6 Jan 2023
Copy of Layout Approval (in case of layout)File: Revised Layout plan.pdf6 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE_FY 22-23 - Sep'22.pdf21 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centralis_-_Architect_Certificate_Sep_22__1__compressed (1).pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_Centralis_Sep'22--signed.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_Centralis_Sep'22--signed.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mhada EWS_Final CA Certificate _Sep 2022 - signed_compressed.pdf19 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Centro Mhada.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centralis - Architect Certificate Mar'22_11zon.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centralis - Architect Certificate Jun'2022-signed.pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_Centralis_Mar'22.pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_Centralis_Jun'2022-signed.pdf19 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE_FY 22-23_Jun-22-signed.pdf19 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_ Certificate Mahada_june 2022-signed_11zon.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centralis_-_Architect_Certificate_Dec_21.pdf15 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_Centralis_Dec'21_Certi 06.pdf13 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Centralis EWS CA certificate june21.pdf13 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centralis - Architect Certificate Sept'21.pdf22 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_Centralis_Sept'21_Certi 04.pdf22 Nov 2021
Copy of the legal title reportFile: Title Certificate with Covering Letter_(Sept 4, 2021)_compressed.pdf6 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_Centralis_Jun'21_Certi 02.pdf26 Aug 2021
Proforma of Allotment letterFile: Centro MHADA Agreement for Sale_07082021.pdf26 Aug 2021
Layout approvalFile: Revised drawing layout for the project.pdf25 Aug 2021
Building plan approvalFile: F 1 Plot IOD.pdf25 Aug 2021
PAN CardFile: PAN Card.pdf25 Aug 2021
Details of encumbrancesFile: Letter of encumbrance.pdf25 Aug 2021
Copy of Layout Approval (in case of layout)File: Revised drawing layout for the project.pdf25 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: F 1 Plot IOD.pdf25 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised CC for the project.pdf25 Aug 2021
Declaration about Commencement CertificateFile: Declaration of Commencement certificate.pdf25 Aug 2021
Declaration in FORM BFile: Form B.pdf25 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Centralis EWS CA certificate june21.pdf25 Aug 2021
Proforma of Allotment letterFile: Centro MHADA Building-Allotment Letter-26072021.pdf25 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Centralis - Architect Certificate Jun'21.pdf23 Aug 2021

Promoter's earlier projects16

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
WindchimesMahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075454CompletedDec 2018Dec 2018
Boisar Phase IIGut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar238CompletedDec 2017Jun 2017
BOISAR Phase IGut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar359CompletedJun 2017Jan 2017
LartistaMahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 01821CompletedSep 2016Sep 2016
Avadi Phase IBlock No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee604CompletedJun 2016Apr 2016
AshvitaMahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072664CompletedJun 2016May 2016
Aura PH5Village Chauma Sector 110A Gurgaon Manesar Urban Complex150CompletedJan 2015Late, Sep 2016
Aura PH4Village Chauma Sector 110A Gurgaon Manesar Urban Complex142CompletedJan 2015Late, Dec 2015
Aura PH3Village Chauma Sector 110A Gurgaon Manesar Urban Complex110CompletedOct 2014Late, Aug 2015
Aura PH2Village Chauma Sector 110A Gurgaon Manesar Urban Complex166CompletedNov 2013Late, Oct 2014
Splendour Phase 2CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re233CompletedNov 2013Jun 2013
Aura PH1Village Chauma Sector 110A Gurgaon Manesar Urban Complex231CompletedMay 2013May 2013
AngelicaBldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai67CompletedMar 2013Mar 2013
AspenBldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai68CompletedDec 2012Dec 2012
Splendour Phase 1CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078265CompletedAug 2011Aug 2011
ChlorisMilestone 16 PART 3 Sector 19 Faridabad160CompletedJul 2011Jul 2011

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Centro MHADA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri13,700+ in Pune

2 kmCentro MHADACompleted 52Lapsed / revoked 33Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: Mahindra Lifespace Developers limited

Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Centro MHADA is delayed beyond 28 Feb 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Centro MHADA?

The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Centro MHADA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Centro MHADA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Centro MHADA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Centro MHADA?

The professionals named in the filing: Architect: Madivala Qutub & Associates; Engineer: Samartha Constro Consultants LLP; Chartered Accountant: A B D and CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Centro MHADA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Centro MHADA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Centro MHADA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.