Home / Browse projects / Mumbai Suburban, Maharashtra / VICINO A1A2

Completed No litigation declared Residential / Group Housing project

VICINO A1A2

By Mahindra Lifespace Developers limited

RG-MH-04591 · RERA P51800022126 · Last updated on MahaRERA portal: 13 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 66 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

VICINO A1A2 is a Residential / Group Housing project by Mahindra Lifespace Developers limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800022126 on 28 Aug 2019. The registration is recorded completed; possession was promised by 30 Mar 2025.

At a glance

Project

  • NameVICINO A1A2
  • TypeResidential / Group Housing
  • Location
    • Suren Road
    • Andheri
    • Mumbai Suburban
    • 400093
  • Pincode400093
  • RERA no.P51800022126
  • ReraGenie IDRG-MH-04591

Builder

  • NameMahindra Lifespace Developers limited
  • Entity typeCompany
  • CINL45200MH1999PLC118949
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonArun Kumar Tilak Raj Nanda
  • Managing DirectorArvind Subramanian
  • Other registrations66 more →
  • Completed25 of 67
  • No longer live20 lapsed, de-registered or revoked
  • Declared earlier projects66 →

Key dates

this monthRegisteredAug 2019PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Aug 2019
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VICINO A1A2NA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

VICINO A1A2: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed83

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots83
Closed/Covered83

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,384 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5008.37
Proposed, not sanctioned1,844 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKotak Mahindra Bank,5C Li,Mittal Court,224,Nariman Point, Mumbai 400021

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMORPHOGENESIS
EngineerGEM ENGSERV PVT LTD
Chartered AccountantA B D AND CO LLP
Chartered AccountantP G BHAGWAT LLP
PartnerRole in project
Mahindra Lifespace Developers limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 May 2024

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: VICINO-A1A2-FORM4.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Vicino A1A2- Form 5-FY24.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Vicino A1A2- Form 5-FY24.pdf8 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A1A2 full OC.pdf6 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vicino A1A2 v1.pdf28 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance certificate RERA FY 22-23_signed.pdf19 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC A1A2.pdf19 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: 20230119_Annexure_E-form-04_signed.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vicino_A1A2_ Completion Certificate_signed.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VICINO A1A2 Rev Architect Certificate for RERA.pdf16 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL_VICINO_TOWER A1A2_ Q2_DEC22-Final_signed.pdf16 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vicino A1A2 Dec'22_signed.pdf16 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality certificate A1A2, A3A4 and A5A6.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VICINO A1A2 Rev Architect Certificate for RERA Reg signed.pdf17 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL_VICINO_TOWER A1A2_ Q2_SEPT22-Final-signed.pdf17 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VICINO A1A2_SEP 22-signed_compressed.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: VicinoA1A2 signed.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: VicinoA1A2 signed.pdf30 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Certificate RERA Q1-signed.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A1A2_Rera Certificate_15072022-signed.pdf18 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL_VICINO_TOWER A3A4_ Q1_JUNE22-Final-signed.pdf18 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MLDL_VICINO_TOWER A1A1_ Q1_JUNE22-Final-signed.pdf18 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vicino A1A2 Jun22 updated-signed.pdf18 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A1A2_Rera Certificate_27042022-signed.pdf6 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL VICINO TOWER A1A2 CERTIFICATE Q4_March 22_compressed.pdf6 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MLDL VICINO TOWER A1A2 CERTIFICATE Q4_March 22_compressed.pdf6 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A1A2 March'22 CA certificate_Compressed.pdf6 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower_A1A2_Certificate.pdf17 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL VICINO ENGG CERTIFICATE Q3_DEC21- for TOWER A1A2.pdf17 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vicino A1A2 final_compressed.pdf17 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL VICINO ENGG CERTIFICATE Q3_DEC21- for TOWER A1A2.pdf21 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed Form 5 and SOA - Vicino A1A2_compressed.pdf18 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vicino Architect Certificate Oct '2021.pdf27 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vicino Engineer - Sept 21.pdf27 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vicino A1A2 Jun'21 CA certificate.pdf9 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vicino A3A4 Jun'21 CA certificate.pdf9 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Vicino A1A2 Jun'21 CA certificate.pdf9 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed Form 5 and SOA - Vicino A1A2.pdf9 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed Form 5 and SOA - Vicino A3A4.pdf9 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Q1 FY22.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate Q1 FY22.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Q1 FY22.pdf12 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q4 FY21.pdf4 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Q4 FY21.pdf4 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate Q4 FY21.pdf4 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VICINO A1A2 CA Certificate Q4 FY21.pdf4 Jun 2021
Proforma of Allotment letterFile: VICINO A1A2 AFS 23022021.pdf25 Feb 2021
Proforma of Allotment letterFile: VICINO A1A2 Allotment Letter 23022021.pdf25 Feb 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VICINO Architect Certificate Dec 2020.pdf27 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vicino Engineers Certificate Dec 2020.pdf27 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate Dec 2020.pdf27 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vicino CA Certificate A1A2 Dec 20.pdf27 Jan 2021
Layout approvalFile: Vicino Bldg1 Amended approval letter dt13012021.pdf14 Jan 2021
Layout approvalFile: Vicino Bldg1 Amended approval plans dt13012021Compressed.pdf14 Jan 2021
Copy of Layout Approval (in case of layout)File: Vicino Bldg1 Amended approval letter dt13012021.pdf14 Jan 2021
Copy of Layout Approval (in case of layout)File: Vicino Bldg1 Amended approval plans dt13012021Compressed.pdf14 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5-VICINO A1A2.pdf8 Dec 2020
Proforma of Allotment letterFile: Vicino A1A2_Agreement draft.pdf26 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-FY20-21-Q2.pdf23 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-FY20-21-Q2.pdf23 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate-FY20-21-Q2.pdf23 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate A1A2-FY20-21-Q2.pdf23 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q4-FY19-20-A1A2-PDF.pdf26 Aug 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-FY20-21-Q1-A1A2-PDF.pdf26 Aug 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-FY20-21-Q1.pdf19 Jul 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate -FY20-21-Q1.pdf19 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Certificate-FY19-20-Q4.pdf19 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Certificate-FY20-21-Q1.pdf19 Jul 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q4 Fy19-20.pdf11 Jun 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Q4 FY19-20.pdf11 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate-Q3-VICINO1.pdf29 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Q3-VICINOA1A2.pdf23 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Q3-VICINO.pdf21 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-Q3-VICINO.pdf21 Jan 2020
Layout approvalFile: Vicino bldg1 Amended approval plansdt01012020 (2).pdf3 Jan 2020
Building plan approvalFile: Vicino bldg 1 Amended approval Issue Letter dt 01012020.pdf3 Jan 2020
Copy of Layout Approval (in case of layout)File: Vicino bldg1 Amended approval plansdt01012020 (2).pdf3 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Vicino bldg 1 Amended approval Issue Letter dt 01012020.pdf3 Jan 2020
Layout approvalFile: Amended approved plans (RERA).pdf30 Sep 2019
Building plan approvalFile: Issue Letter 300919.pdf30 Sep 2019

Promoter's earlier projects16

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
WindchimesMahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075454CompletedDec 2018Dec 2018
Boisar Phase IIGut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar238CompletedDec 2017Jun 2017
BOISAR Phase IGut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar359CompletedJun 2017Jan 2017
LartistaMahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 01821CompletedSep 2016Sep 2016
Avadi Phase IBlock No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee604CompletedJun 2016Apr 2016
AshvitaMahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072664CompletedJun 2016May 2016
Aura PH5Village Chauma Sector 110A Gurgaon Manesar Urban Complex150CompletedJan 2015Late, Sep 2016
Aura PH4Village Chauma Sector 110A Gurgaon Manesar Urban Complex142CompletedJan 2015Late, Dec 2015
Aura PH3Village Chauma Sector 110A Gurgaon Manesar Urban Complex110CompletedOct 2014Late, Aug 2015
Aura PH2Village Chauma Sector 110A Gurgaon Manesar Urban Complex166CompletedNov 2013Late, Oct 2014
Splendour Phase 2CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re233CompletedNov 2013Jun 2013
Aura PH1Village Chauma Sector 110A Gurgaon Manesar Urban Complex231CompletedMay 2013May 2013
AngelicaBldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai67CompletedMar 2013Mar 2013
AspenBldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai68CompletedDec 2012Dec 2012
Splendour Phase 1CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078265CompletedAug 2011Aug 2011
ChlorisMilestone 16 PART 3 Sector 19 Faridabad160CompletedJul 2011Jul 2011

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VICINO A1A2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

Builder: Mahindra Lifespace Developers limited

Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VICINO A1A2 is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VICINO A1A2?

The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VICINO A1A2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VICINO A1A2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VICINO A1A2?

The professionals named in the filing: Architect: MORPHOGENESIS; Engineer: GEM ENGSERV PVT LTD; Chartered Accountant: A B D AND CO LLP; Chartered Accountant: P G BHAGWAT LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VICINO A1A2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VICINO A1A2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VICINO A1A2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.