Home / Browse projects / Raigarh, Maharashtra / Mahindra Meridian Plots
Mahindra Meridian Plots
By Mahindra Lifespace Developers limited
RG-MH-69432 · RERA P52000048049 · Last updated on MahaRERA portal: 17 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 19 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mahindra Meridian Plots is a Plotted project by Mahindra Lifespace Developers limited in Raigarh, Maharashtra, registered with MahaRERA as P52000048049 on 8 Dec 2022. Possession was promised by 30 Mar 2025 and is now 19 months past that date. The completion date has moved by 12 months from the original filing. 19 of the 26 units on this registration are recorded sold or booked.
At a glance
Project
- NameMahindra Meridian Plots
- TypePlotted
- Location
- Sahan Bypass Road
- Nagaon
- Alibag
- Raigarh
- 402201
- Pincode402201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000048049
- ReraGenie IDRG-MH-69432
Builder
- NameMahindra Lifespace Developers limited
- Entity typeCompany
- CINL45200MH1999PLC118949
- GSTIN27AAACG8904C1ZV
- ChairpersonArun Kumar Tilak Raj Nanda
- Managing DirectorArvind Subramanian
- Other registrations66 more →
- Completed25 of 67
- No longer live20 lapsed, de-registered or revoked
- Declared earlier projects66 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on8 Dec 2022
- Promised completion30 Mar 2025
- Revised completionRevised to 30 Mar 2025 (originally 31 Mar 2024)
- BuildingsNot stated in filing
- Documents filed103 files
Current status
Figures as on 17 Apr 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 17 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Abhijit S Mohite |
| Engineer | Raje Structural Consultant Private Limited |
| Chartered Accountant | A B D AND CO LLP |
| Chartered Accountant | P G BHAGWAT LLP |
| Partner | Role in project |
|---|---|
| Mahindra Lifespace Developers limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe wish to inform you that during the monsoon season, the Project was acutely impacted by floods and heavy rains, and therefore was inaccessible to the laborers. Due to this natural calamity at the Project site, the ground works had been delayed and stopped for several months. The Company has completed plot levelling, fencing works, majority of the compound wall works etc., however due to such force Majeure events at the Project site, the Company could not carry out and complete certain pending works like road and footpath works and MEP (mechanical, electrical and plumbing) Infrastructure work
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Apr 2025
Documents filed103
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Qtr 4.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf | 15 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 15 Apr 2025 |
| Other - TechnicalFile: 09042025- Tehsildar Acknowledgement_Architect Certificate (completion).pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From2A.pdf | 8 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architecture completion certificate 28-03-2025.pdf | 2 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES CONCERNED TO FINANCE.pdf | 6 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf | 6 Feb 2025 |
| Declaration in FORM BFile: Form B and CTC.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 6 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Meridian Plots sold unsold Declaration.pdf | 6 Feb 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 6 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf | 6 Feb 2025 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES CONCERNED TO FINANCE.pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ameet Hariani RERA Declaration of Director.pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Amit Sinha RERA declaration of Director.pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Amrita Chowdhury RERA Declaration of Director.pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Anish Shah RERA Declaration of Director.pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Asha Kharga RERA Declaration of Director.pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Milind Kulkarni RERA Declaration of Director.pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Rucha Nanavati RERA Declaration of Director.pdf | 6 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Mahindra Meridian Plots.pdf | 6 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured and Unsecured loan No charge.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf | 24 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Meridian Plots - sold unsold Declaration - September 2024.pdf | 21 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Meridian Plots - sold unsold Declaration - December 2024.pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From no 3.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf | 15 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Meridian.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04_Meridian_Plots_Phase_II_Sept_24.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL MERIDIAN_ALIBAUG_SEPT'24-Final.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mahindra Meridian Plot - Form 5- FY 24.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM1.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM2.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from3-07-24.pdf | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_Q4_23-24.pdf | 18 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1_Architect Certificate_Q4_23-24.pdf | 18 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_Q4_23-24.pdf | 18 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Quality Assurance Certificate_Q4_23-24.pdf | 18 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate_Q4_23-24.pdf | 18 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL MERIDIAN_ALIBAUG_JAN'24-Final_signed.pdf | 26 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Certificate_Meridian_PhaseII_Jan24_signed.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: plot.pdf | 30 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: plot.pdf | 30 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From2.pdf | 29 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From2.pdf | 29 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From2.pdf | 29 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From3.pdf | 29 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM1.pdf | 27 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM1.pdf | 27 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM1.pdf | 27 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM1.pdf | 27 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM1.pdf | 27 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM2.pdf | 27 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FROM2A.pdf | 27 Jan 2024 |
| Declaration in FORM BFile: Revised - Affidavit Cum Declaration.pdf | 25 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect rera Certificate Jan 2024_signed.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cert Meridian_Phase_II_Dec-23_signed.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Percentage Completion signed.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL MERIDIAN_ALIBAUG_SEPT'23-Final_signed.pdf | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Meridian_-_Phase_II_Sep23_final_signed.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Meridian.pdf | 29 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Mahindra Meridian Plot Sold and Unsold Inventory.pdf | 22 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate PHASE II.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL MERIDIAN_ALIBAUG_JUNE'23.pdf | 15 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Meridian_CA Certificate_signed.pdf | 15 Jul 2023 |
| Other - FinanceFile: PGB_MLDL CA change letter.pdf | 15 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Architect Certificate II.pdf | 19 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL MERIDIAN_ALIBAUG_MAR'23-Final_signed_Engg Cert.pdf | 19 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate-Q4-2023-Meridian.pdf | 19 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: meridian_ cert march 23_signed.pdf | 19 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra meridian Arch Certificate.pdf | 19 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Certificate Meridian Dec'22_signed.pdf | 19 Jan 2023 |
| Proforma of Agreement for saleFile: Mahindra Meridian Plots Agreement for Sale Updated-02-01-2022.pdf | 3 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation of Agreement for Sale - 02-01-2022.pdf | 3 Jan 2023 |
Promoter's earlier projects16
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Windchimes | Mahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075 | 454 | Completed | Dec 2018 | Dec 2018 |
| Boisar Phase II | Gut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar | 238 | Completed | Dec 2017 | Jun 2017 |
| BOISAR Phase I | Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar | 359 | Completed | Jun 2017 | Jan 2017 |
| Lartista | Mahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018 | 21 | Completed | Sep 2016 | Sep 2016 |
| Avadi Phase I | Block No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee | 604 | Completed | Jun 2016 | Apr 2016 |
| Ashvita | Mahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072 | 664 | Completed | Jun 2016 | May 2016 |
| Aura PH5 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 150 | Completed | Jan 2015 | Late, Sep 2016 |
| Aura PH4 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 142 | Completed | Jan 2015 | Late, Dec 2015 |
| Aura PH3 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 110 | Completed | Oct 2014 | Late, Aug 2015 |
| Aura PH2 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 166 | Completed | Nov 2013 | Late, Oct 2014 |
| Splendour Phase 2 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re | 233 | Completed | Nov 2013 | Jun 2013 |
| Aura PH1 | Village Chauma Sector 110A Gurgaon Manesar Urban Complex | 231 | Completed | May 2013 | May 2013 |
| Angelica | Bldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai | 67 | Completed | Mar 2013 | Mar 2013 |
| Aspen | Bldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai | 68 | Completed | Dec 2012 | Dec 2012 |
| Splendour Phase 1 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078 | 265 | Completed | Aug 2011 | Aug 2011 |
| Chloris | Milestone 16 PART 3 Sector 19 Faridabad | 160 | Completed | Jul 2011 | Jul 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 66 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 103 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Mahindra Meridian Plots on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nagaon5,900+ in Raigarh
Filed coordinates, straight-line distance. 21 registered projects within 2 km.
CROWN
BHASIN PROPERTIES AND DEVELOPERS PVT LTD
GOLDEN PALMS
AKSHAY BUILDERS
Amit Complex
Dattaram Dhaku Gawade and Shobha Dattaram
Violet Hill
Total Environment Resorts Private Limited
Acons Prive
Akshay Gulati
Alibag Divine
A Corporation
See every Raigarh project, with the district possession charts
Builder: Mahindra Lifespace Developers limited
Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that Mahindra Meridian Plots shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Mahindra Meridian Plots is delayed beyond 30 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mahindra Meridian Plots?
The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 and GSTIN 27AAACG8904C1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mahindra Meridian Plots?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mahindra Meridian Plots?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mahindra Meridian Plots?
The professionals named in the filing: Architect: Ar. Abhijit S Mohite; Engineer: Raje Structural Consultant Private Limited; Chartered Accountant: A B D AND CO LLP; Chartered Accountant: P G BHAGWAT LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mahindra Meridian Plots?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback