ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / MAHINDRA ALCOVE WING B

Registered No litigation declared Residential / Group Housing project

MAHINDRA ALCOVE WING B

By Mahindra Lifespace Developers limited

RG-MH-34900 · RERA P51800031699 · Last updated on MahaRERA portal: 21 Nov 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 14 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Feb 2027Possession promisedmoved 14 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 74%
14 of 62Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

MAHINDRA ALCOVE WING B is a Residential / Group Housing project by Mahindra Lifespace Developers limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031699 on 8 Nov 2021. Possession is promised by 28 Feb 2027. The completion date has moved by 14 months from the original filing. 48 of the 62 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMAHINDRA ALCOVE WING B
  • TypeResidential / Group Housing
  • Location
    • VILLAGE SAKI in 'L' Ward
    • OFF SAKI VIHAR ROAD
    • CHANDIVALI
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800031699
  • ReraGenie IDRG-MH-34900

Builder

  • NameMahindra Lifespace Developers limited
  • Entity typeCompany
  • CINL45200MH1999PLC118949
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonArun Kumar Tilak Raj Nanda
  • Managing DirectorArvind Subramanian
  • Other registrations66 more →
  • Completed25 of 67
  • No longer live19 lapsed, de-registered or revoked
  • Declared earlier projects66 →

Key dates

this monthRegisteredNov 2021First promiseDec 2025Revised toFeb 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Nov 2021
  • Promised completion28 Feb 2027
  • Revised completionRevised to 28 Feb 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed136 files

Current status

77%48 of 62 units booked
78.0%Work done, per cost certificate

Figures as on 21 Nov 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAHINDRA ALCOVE WING BNA201662062

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 74%.

MAHINDRA ALCOVE WING B: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises74%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks67%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.49%

Progress on shared amenities15

As on 21 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed81

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots81
Closed/Covered81

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area376 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Feb 2026
LandownerVillageDistrict
M/S. PAREKH & BROTHERSMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityBMC
Permissible FSI5099.61
Proposed, not sanctioned5,100 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch167B, GROUND FLOOR, READY MONEY TERRACE, DR A B ROAD, WORLI NAKA, MUMBAI, 400018
Estimated costRs 29.42 cr
Cost incurredRs 22.95 cr
Work done78.01%
BuildingWingEstimatedIncurred
MAHINDRA ALCOVE WING BNARs 26.93 crRs 22.95 cr
-NARs 2.49 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEdifice consultants Pvt Ltd
EngineerWTP Cost Advisory services India Pvt. Ltd.
EngineerVINYASA CONSULTANTS
Chartered AccountantABD and Company LLP
Chartered AccountantP G BHAGWAT LLP Mainkar
Chartered AccountantNilesh Vasantlal Shah
PartnerRole in project
Mahindra Lifespace Developers limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA16112641052Dec 2025 → Feb 2027

Reason as filed by the promoterThe project is 100% completed. The consent of 100% of allottees has been uploaded in support of this extension application. TAB 1 - Format B Uploaded TAB 2 - Form B Uploaded TAB 3 - PERT CHART Uploaded TAB 4 - Declaration for extension Uploaded TAB 5 - Notarised Correction Declaration Uploaded From TAB 6 to TAB 17 - QPR's Uploaded TAB 18 - Form 2A - 25-26 Uploaded TAB 19 - Form 5 - 25-26 Uploaded TAB 20 - Occupancy Certificate (OC) TAB 21 - OC Plans TAB 22 - Comparative Statement 1. Completion of Construction: The project is 100% complete, and all construction work has been executed in accorda

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12606320Rohit Omprakash DubeMahindra Lifespace Developers limited29/09/2026
CC12607229Prashant Samuel DaroleMahindra Lifespace Developers limited05/11/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Feb 2027

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Tower B form 1 mar 26.pdf21 Nov 2026
Withdrawal Update Form 1File: ALCOVE FORM 1__Wing_B_Q1_2026 (1).pdf21 Nov 2026
Withdrawal Update Form 2File: Alcove Wing B Form 2 Mar 26.pdf21 Nov 2026
Withdrawal Update Form 2File: ALCOVE FORM 2__Wing_B_Q1_2026.pdf21 Nov 2026
Withdrawal Update Form 3File: Alcove Wing B Form 3 Mar 26 (1).pdf21 Nov 2026
Withdrawal Update Form 3File: ALCOVE FORM 3__Wing_B_Q1_2026.pdf21 Nov 2026
Form 2A (FY 2025-2026)File: Form 2A TOWER B (1).pdf14 Nov 2026
Form 2A (FY 2021-2022)File: 21-22.pdf12 Nov 2026
Form 2A (FY 2022-2023)File: 22-23.pdf12 Nov 2026
Form 2A (FY 2023-2024)File: 23-24.pdf12 Nov 2026
Form 2A (FY 2024-2025)File: 24-25.pdf12 Nov 2026
Form 5 (FY 2021-2022)File: 21-22.pdf12 Nov 2026
Form 5 (FY 2022-2023)File: 22-23.pdf12 Nov 2026
Form 5 (FY 2023-2024)File: 23-24.pdf12 Nov 2026
Form 5 (FY 2025-2026)File: F5 25-26.pdf12 Nov 2026
Form 1File: Form 1 TB Q3 FY26.pdf15 Jan 2026
Form 2File: Form 2 TB Q3 FY26.pdf15 Jan 2026
Form 3File: Form 3 Q3FY26 TB.pdf15 Jan 2026
Disclosure of Sold and Booked InventoryFile: Alcove Q3 FY26 TB disclosure.pdf15 Jan 2026
Form 1File: Form 1 TB Q2FY26.pdf15 Oct 2025
Form 2File: Form 2 TB Q2FY26.pdf15 Oct 2025
Form 3File: Alcove Q2 FY26 TB FORM3.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Alcove Q2 FY26 TB disclosure.pdf15 Oct 2025
Form 5 (FY 2024-2025)File: F5 24-25.pdf22 Sep 2025
Form 1File: Form 1_Alcove Wing B.pdf18 Jul 2025
Form 2File: Mahindra Alcove Wing B_250711193253_0001.pdf18 Jul 2025
Form 3File: Form 3_Alcove Wing B.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Promoters Dec Tower B.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mahindra_Alcove_Wing_B_March_25-Final.pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q4 FY 2025.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Wing B.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: wing B.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: wing B.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tower B.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tower B.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL Alcove_WING-B_ Q2_FY25.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower B.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower B.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDL Alcove_WING-B_ Q2_FY25.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Alove B Form 5.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Alove B Form 5.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower B.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_P51800031699_Alcove.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q1 Fy25.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower B.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SKM_28724041718541.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower B.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 FORM 3 ALCOVE Sign _Form_3_ B Sign.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: M-MLDL-AND-Wing B-RERA Q3_2023_24_signed.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDLCHANDIVALI_WING-B_ Q3_DEC23-Final_signed.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ALCOVE__Dec_-23__B_signed.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Alcove Quality Assurance Certificate_signed.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: M-MLDL-AND-Wing B-RERA Q2_2023_24_signed.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDLCHANDIVALI_WING-B_ Q2_SEPT23-Final_signed.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B_Sep23_CA_certificate_signed.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Alcove B Form 5 signed v1.pdf29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: M-MLDL-AND-RERA Wing B-Q1-230705_signed.pdf15 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDLCHANDIVALI_WING-B_ Q1_JUNE23-Final_signed.pdf15 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alcove_B Wing_signed.pdf15 Jul 2023
Other - FinanceFile: PGB_MLDL RERA letter.pdf15 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: M-MLDL-AND-Wing B-RERA Q4_2022_23_signed.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MLDLCHANDIVALI-WING-B-Q4-MAR23-Final_signed.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Alcove Quality Assurance Certificate_signed.pdf19 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alcove B_Cer Q4_signed.pdf19 Apr 2023
Layout approvalFile: 1-layout plan.pdf21 Mar 2023
Layout approvalFile: 2-STILT FLOOR.pdf21 Mar 2023
Layout approvalFile: 3-PARKING FLOOR.pdf21 Mar 2023
Building plan approvalFile: 8-WING B.pdf21 Mar 2023
Building plan approvalFile: 9-WING B.pdf21 Mar 2023
Building plan approvalFile: 10-WING B.pdf21 Mar 2023
Building plan approvalFile: 11-WING B.pdf21 Mar 2023
Building plan approvalFile: 8-WING B-1.pdf21 Mar 2023
Building plan approvalFile: 9-WING B-1.pdf21 Mar 2023
Building plan approvalFile: 10-WING B-1.pdf21 Mar 2023
Building plan approvalFile: 11-WING B-1.pdf21 Mar 2023
Copy of Layout Approval (in case of layout)File: 1-layout plan.pdf21 Mar 2023
Copy of Layout Approval (in case of layout)File: 2-STILT FLOOR.pdf21 Mar 2023
Copy of Layout Approval (in case of layout)File: 3-PARKING FLOOR.pdf21 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 8-WING B.pdf21 Mar 2023

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

25 delivered on promise4 not delivered by the promised date20 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mahindra BeaconHillPM1170002600357Byculla, Mumbai City199May 2026OngoingApr 2032Registered original: Dec 2031Not due yet
Mahindra Citadel - Phase 5PM1264042600425Pimpri Chinchawad (M Corp.), Pune670May 2026OngoingDec 2031Registered original: Aug 2031Not due yet
Mahindra Vista Phase 2P51800079147Kandivali East, Mumbai Suburban667Feb 2025OngoingApr 2031Registered original: Dec 2030Not due yet
Mahindra Citadel - Tower LPR1260002500154Pune, Pune211Jun 2025OngoingApr 2031Registered original: Dec 2030Not due yet
Mahindra IvyLush Tower C and Tower DP52100078592Wagholi, Pune497Dec 2024OngoingDec 2030Registered original: Aug 2030Not due yet
Mahindra Marina64 - Phase 3PR1182022502265Malad, Mumbai Suburban348Feb 2026OngoingOct 2030Registered original: Jun 2030Not due yet
Mahindra Codename Crown Tower EP52100055162Wagholi, Pune125Mar 2024OngoingJul 2030Registered original: Dec 2029Not due yet
Mahindra Codename Crown Tower A and Tower BP52100055161Wagholi, Pune453Mar 2024OngoingJul 2030Registered original: Dec 2029Not due yet
Mahindra Citadel - Bastion IP52100053012Near ICC Tech Park, Pune123Oct 2023OngoingJul 2030Registered original: Mar 2030Not due yet
Mahindra Vista Phase 1P51800054671Kandivali East, Mumbai Suburban600Feb 2024OngoingApr 2030Registered original: Dec 2029Not due yet
Mahindra Marina64 - Phase 2PR1181012500523Malad, Mumbai Suburban70Aug 2025OngoingApr 2030Registered original: Dec 2029Not due yet
Mahindra Marina64 - Phase 1PR1181012500087Malad, Mumbai Suburban62Jun 2025OngoingDec 2029Not due yet
Mahindra Citadel - Bastion J , KP52100053150Near ICC Tech Park, Pune272Oct 2023OngoingOct 2029Registered original: Jun 2029Not due yet
Mahindra Happinest Kalyan - 2 Project BP51700076963Ranjnoli, Thane501Jul 2024OngoingApr 2029Registered original: Dec 2028Not due yet
Mahindra Happinest Kalyan-2 Project AP51700032925Ranjnoli, Thane899Feb 2022OngoingDec 2028Registered original: Apr 2026Not due yet
Mahindra Citadel Phase 1P52100047656Pimpri, Pune448Nov 2022OngoingOct 2028Registered original: Jun 2028Not due yet
Mahindra Happinest Tathawade Phase 3P52100052559Tathawade, Pune502Sep 2023OngoingApr 2028Registered original: Dec 2027Not due yet
Mahindra Happinest Tathawade Phase 2P52100045388Tathawade, Pune314May 2022OngoingSep 2027Registered original: May 2027Not due yet
Nest EWSP52100045279Tathawade, Pune89May 2022OngoingMay 2027Registered original: Jan 2027Not due yet
Happinest Tathawade Phase-1P52100028049Tathawade, Pune692Jan 2021OngoingMay 2027Registered original: Jan 2027Not due yet
MAHINDRA ALCOVE WING A AND CP51800033573CHANDIVALI, Mumbai Suburban122Feb 2022OngoingOct 2026Registered original: Jun 2026Not delivered
MAHINDRA ALCOVE WING D AND EP51800028352CHANDIVALI, Mumbai Suburban-Feb 2021OngoingJun 2026Not delivered
VICINO A5A6P51800033415ANDHERI, Mumbai Suburban-Feb 2022CompletedJul 2025Jul 2025
VICINO A3A4P51800022067Andheri, Mumbai Suburban-Aug 2019CompletedMar 2025Mar 2025
VICINO A1A2P51800022126Andheri, Mumbai Suburban-Aug 2019CompletedMar 2025Mar 2025
Mahindra Meridian PlotsP52000048049Nagaon, Raigarh26Dec 2022OngoingMar 2025Registered original: Mar 2024Not delivered
RootsP51800016833Vickers Compound, Mumbai Suburban-Jun 2018CompletedSep 2023Sep 2023
Centralis Tower 2P52100019393Pimpri, Pune-Jan 2019CompletedAug 2023Aug 2023
Centralis Tower 1P52100019406Pimpri, Pune-Jan 2019CompletedAug 2023Aug 2023
Centralis Tower 4P52100019375Pimpri, Pune-Jan 2019CompletedMar 2023Mar 2023
Centralis Tower 3P52100019407Pimpri, Pune-Jan 2019CompletedMar 2023Mar 2023
Antheia C3P52100016619Pimpri, Pune-May 2018CompletedMar 2023Mar 2023
Centro MHADAP52100030814Pimpri, Pune-Sep 2021CompletedFeb 2023Feb 2023
The Serenes Villa No 14P52000012548nagaon, Raigarh1Sep 2017OngoingDec 2022Not delivered
The Serenes Villa No 13P52000012781nagaon, Raigarh-Sep 2017CompletedDec 2022Dec 2022
VIVANTEP51800000242., Mumbai Suburban-Jul 2017CompletedOct 2021Registered original: Oct 2019Oct 2021
M SpaceP51800000179Borivali, Mumbai Suburban-Jul 2017CompletedMar 2021Registered original: Sep 2019Mar 2021
Antheia A3P52100000171Pimpri, Pune-Jul 2017CompletedDec 2020Dec 2020
Happinest Boisar Phase V CFCP99000014295Kambalgaon, Palghar-Nov 2017CompletedNov 2020Nov 2020
Happinest Boisar Phase IVP99000014293Kambalgaon, Palghar-Nov 2017CompletedNov 2020Nov 2020

How this compares with Mumbai Suburban

77%of this project is bookeddistrict median 29%
35%of Mumbai Suburban projects moved their completion datethis one moved by 14 months
20%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,900+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHINDRA ALCOVE WING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHANDIVALI6,900+ in Mumbai Suburban

2 kmMAHINDRA ALCOVE WING BCompleted 67Lapsed / revoked 30Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 144 registered projects within 2 km.

Builder: Mahindra Lifespace Developers limited

Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MAHINDRA ALCOVE WING B is delayed beyond 28 Feb 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHINDRA ALCOVE WING B?

The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHINDRA ALCOVE WING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAHINDRA ALCOVE WING B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MAHINDRA ALCOVE WING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHINDRA ALCOVE WING B?

The professionals named in the filing: Architect: Edifice consultants Pvt Ltd; Engineer: WTP Cost Advisory services India Pvt. Ltd.; Engineer: VINYASA CONSULTANTS; Chartered Accountant: ABD and Company LLP; Chartered Accountant: P G BHAGWAT LLP Mainkar; Chartered Accountant: Nilesh Vasantlal Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHINDRA ALCOVE WING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHINDRA ALCOVE WING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHINDRA ALCOVE WING B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.