Home / Browse projects / Pune, Maharashtra / Mahindra Citadel - Bastion I

Registered No litigation declared Residential / Group Housing project

Mahindra Citadel - Bastion I

By Mahindra Lifespace Developers limited

RG-MH-92792 · RERA P52100053012 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 66 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

Mahindra Citadel - Bastion I is a Residential / Group Housing project by Mahindra Lifespace Developers limited in Pune, Maharashtra, registered with MahaRERA as P52100053012 on 10 Oct 2023. Possession is promised by 30 Mar 2030.

At a glance

Project

  • NameMahindra Citadel - Bastion I
  • TypeResidential / Group Housing
  • Location
    • Old Pune - Mumbai Highway
    • Near ICC Tech Park
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411018
  • Pincode411018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053012
  • ReraGenie IDRG-MH-92792

Builder

  • NameMahindra Lifespace Developers limited
  • Entity typeCompany
  • CINL45200MH1999PLC118949
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonArun Kumar Tilak Raj Nanda
  • Managing DirectorArvind Subramanian
  • Other registrations66 more →
  • Completed25 of 67
  • No longer live20 lapsed, de-registered or revoked
  • Declared earlier projects66 →

Key dates

this monthRegisteredOct 2023PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2023
  • Promised completion30 Mar 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower INA360000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Tower I: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Club HouseYes0%

Parking filed240

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots240
Closed/Covered240

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,280 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Munciple Corporation
Permissible FSI22894.17
Proposed, not sanctioned19,538 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch32/34, Churchgate House, Veer Nariman Road Fort Mumbai 400001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSankalp Designers
EngineerKC Shah Consultants
EngineerSachin Khot
Chartered AccountantP G BHAGWAT LLP
Chartered AccountantNilesh Vasantlal Shah
PartnerRole in project
Mahindra Lifespace Developers limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2030

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect - Phase 3 Tower I.pdf16 Jul 2026
Form 2File: Mahindra Citadel Bastion I- Engineering Certificate_Jul26.pdf16 Jul 2026
Form 3File: Citadel - Bastion I - Q1 - FY 2026-27 - Certificate.pdf16 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold or Booked Inventory_Citadel (Horizon) all Phases.pdf16 Jul 2026
Form 1File: Mahindra Citadel Phase 2 - Architect Certificate Mar-26 Bastion I Final.pdf20 Apr 2026
Form 2File: Mahindra Citadel Bastion I- Engineering Certificate_Mar-26 Final.pdf20 Apr 2026
Form 3File: Citadel - Bastion I - Q4 - FY 2025-26 CA Final r.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold or Booked Inventory_Citadel Phase 1234 Final.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Quality assurance certificate FY 25-26 Tower ABCDIJK Final.pdf20 Apr 2026
Form 1File: Mahindra Citadel Phase 2 - Architect Certificate Dec-25 Bastion I Final.pdf19 Jan 2026
Form 2File: Mahindra Citadel Bastion I- Engineering Certificate-Dec-25 Final.pdf19 Jan 2026
Form 3File: Citadel - Bastion I - Q3 - FY 2025-26 - CA Certificate Final.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Citadel Tower I.pdf19 Jan 2026
Form 1File: Mahindra Citadel Phase 2 - Architect Certificate Sep'25 Bastion I Final.pdf14 Oct 2025
Form 2File: Mahindra Citadel Bastion I- Engineering Certificate_Sep'25 Final.pdf14 Oct 2025
Form 3File: Citadel - Bastion I - Q1 - FY 2025-26 - Certificate Final.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Citadel_Tower I.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: 16_Form 5 Report - Mahindra Citadel Bastion I.pdf22 Sep 2025
Form 1File: Mahindra Citadel Phase 2 - Architect Certificate Jun'25 Bastion I signed.pdf17 Jul 2025
Form 2File: Mahindra Citadel Bastion I- Engineering Certificate_Jun'25 signed.pdf17 Jul 2025
Form 3File: Citadel - Bastion I - Q1 - FY 2025-26 signed.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Citadel Tower I.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase 2 - Architect Certificate Mar'25 Bastion I_Signed stamped.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel - Bastion I - Q4 - FY 2024-25 - Certificate.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Bastion I- Engineering Certificate_Mar'25 Signed.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance certificate FY 23-24 signed Final reduced.pdf17 Apr 2025
Layout approvalFile: Layout - 1_11zon.pdf30 Jan 2025
Building plan approvalFile: Tower I - 33.pdf30 Jan 2025
Building plan approvalFile: Tower I - 34.pdf30 Jan 2025
Copy of Layout Approval (in case of layout)File: Layout - 1_11zon.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Rev CC - date 29012025.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Tower I - 33.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Tower I - 34.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Bastion I signed compressed.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel_-_Bastion_I_-_Q3_-_FY_2024-25_-_Certificate signed.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Bastion I- Engineering Certificate_Dec'24 signed.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel_Bastion_I_sept24__.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase 2 - Architect Certificate Sep'24 Bastion I signed_compressed 1.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Bastion I- Engineering Certificate_Sep'24 signed.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Citadel Bastion I.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase 2 - Architect Certificate Jun'24 Bastion I Signed stamp.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Bastion I- Engineering Certificate_Jun'24 r-signed.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel - Bastion I - Q1 - FY 2024-25 Certificate.pdf17 Jul 2024
Other - LegalFile: MLDL - Letter for updation of Authorized Signatories.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahindra Citadel Phase 2 - Architect Certificate Mar'24 Bastion I Signed Form 1.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Bastion I- Engineering Certificate_Mar'24 Signed c.pdf17 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality assurance certificate FY 23-24 signed Final reduced.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel Bastion-I.pdf17 Apr 2024
Details of encumbrances concerned to FinanceFile: Letter of Encumbrances with respect to Finance- Citadel Bastion I.pdf6 Feb 2024
Details of encumbrances concerned to LegalFile: Letter of Encumbrances with respect to Finance- Citadel Bastion I.pdf6 Feb 2024
Proforma of Agreement for saleFile: Agreement for Sale - Citadel Bastion I - (After updating mortgage details).pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: citadel Ph 2 tower I_arch cert_signed D.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahindra Citadel Bastion I- Engineering Certificate_Dec'23_signed D.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Citadel - Bastion I - Q3 - RERA Certificate.pdf16 Jan 2024
Building plan approvalFile: Citadel Revised Layout-14-12-23.pdf18 Dec 2023
Building plan approvalFile: I TOWER-31.pdf18 Dec 2023
Building plan approvalFile: I TOWER-32.pdf18 Dec 2023
Building plan approvalFile: I TOWER-33.pdf18 Dec 2023
Building plan approvalFile: I TOWER-34.pdf18 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Citadel Revised Layout-14-12-23.pdf18 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: I TOWER-31.pdf18 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: I TOWER-32.pdf18 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: I TOWER-33.pdf18 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: I TOWER-34.pdf18 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Rev CC 141223.pdf18 Dec 2023
Details of encumbrances concerned to FinanceFile: FNL CD2.pdf6 Oct 2023
Details of encumbrances concerned to LegalFile: FNL CD2.pdf6 Oct 2023
Layout approvalFile: Layout Plan.pdf28 Sep 2023
Building plan approvalFile: I BUILDING ELEVATION FLOOR PLAN.pdf28 Sep 2023
Building plan approvalFile: I BUILDING FLOOR PLAN 01.pdf28 Sep 2023
Building plan approvalFile: I BUILDING FLOOR PLAN 02.pdf28 Sep 2023
Building plan approvalFile: I BUILDING FLOOR PLAN 03.pdf28 Sep 2023
PAN CardFile: MLDL PAN CARD.pdf28 Sep 2023
PAN CardFile: MLDL PAN CARD.pdf28 Sep 2023
Copy of the legal title reportFile: Mahindra Citadel RERA Title Report.pdf28 Sep 2023
Details of encumbrances concerned to FinanceFile: Letter of Encumbrances with respect to Legal- Citadel Bastion I.pdf28 Sep 2023
Details of encumbrances concerned to LegalFile: Letter of Encumbrances with respect to Legal- Citadel Bastion I.pdf28 Sep 2023
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: I BUILDING ELEVATION FLOOR PLAN.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: I BUILDING FLOOR PLAN 01.pdf28 Sep 2023

Promoter's earlier projects16

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
WindchimesMahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075454CompletedDec 2018Dec 2018
Boisar Phase IIGut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District Palghar238CompletedDec 2017Jun 2017
BOISAR Phase IGut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar359CompletedJun 2017Jan 2017
LartistaMahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 01821CompletedSep 2016Sep 2016
Avadi Phase IBlock No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka Poonamallee604CompletedJun 2016Apr 2016
AshvitaMahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072664CompletedJun 2016May 2016
Aura PH5Village Chauma Sector 110A Gurgaon Manesar Urban Complex150CompletedJan 2015Late, Sep 2016
Aura PH4Village Chauma Sector 110A Gurgaon Manesar Urban Complex142CompletedJan 2015Late, Dec 2015
Aura PH3Village Chauma Sector 110A Gurgaon Manesar Urban Complex110CompletedOct 2014Late, Aug 2015
Aura PH2Village Chauma Sector 110A Gurgaon Manesar Urban Complex166CompletedNov 2013Late, Oct 2014
Splendour Phase 2CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078re233CompletedNov 2013Jun 2013
Aura PH1Village Chauma Sector 110A Gurgaon Manesar Urban Complex231CompletedMay 2013May 2013
AngelicaBldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road Mumbai67CompletedMar 2013Mar 2013
AspenBldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road Mumbai68CompletedDec 2012Dec 2012
Splendour Phase 1CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078265CompletedAug 2011Aug 2011
ChlorisMilestone 16 PART 3 Sector 19 Faridabad160CompletedJul 2011Jul 2011

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahindra Citadel - Bastion I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near ICC Tech Park13,700+ in Pune

2 kmMahindra Citadel - BastiCompleted 34Lapsed / revoked 24Other 125Dot size: filed unitsN

Filed coordinates, straight-line distance. 183 registered projects within 2 km.

Builder: Mahindra Lifespace Developers limited

Mahindra Lifespace Developers limited has 67 registrations on MahaRERA, including Antheia C1 and Antheia A4. Its filings disclose 66 earlier MahaRERA projects: declares 37 of 41 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Mahindra Citadel - Bastion I is delayed beyond 30 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahindra Citadel - Bastion I?

The registered promoter entity is Mahindra Lifespace Developers limited, a company as per the filing. Its CIN L45200MH1999PLC118949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahindra Citadel - Bastion I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mahindra Citadel - Bastion I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahindra Citadel - Bastion I?

The professionals named in the filing: Architect: Sankalp Designers; Engineer: KC Shah Consultants; Engineer: Sachin Khot; Chartered Accountant: P G BHAGWAT LLP; Chartered Accountant: Nilesh Vasantlal Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahindra Citadel - Bastion I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahindra Citadel - Bastion I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahindra Citadel - Bastion I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.