Home / Browse projects / Mumbai Suburban, Maharashtra / JANGID MEADOWS

Registered No litigation declared Others project

JANGID MEADOWS

By JANGID HOME PVT LTD

RG-MH-42676 · RERA P51800048770 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
299 of 365Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

JANGID MEADOWS is a Others project by JANGID HOME PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048770 on 17 Jan 2023. Possession is promised by 31 Dec 2026. 66 of the 365 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameJANGID MEADOWS
  • TypeOthers
  • Location
    • AT BAMANDAYA COMPOUND
    • PIPE LINE
    • SAKI VIHAR ROAD
    • POWAI
    • Tungava
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • RERA no.P51800048770
  • ReraGenie IDRG-MH-42676

Builder

  • NameJANGID HOME PVT LTD
  • Entity typeCompany
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed74 files

Current status

18%66 of 365 units booked
14.3%Work done, per cost certificate

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA25231407147
B WINGNA252369473
C WINGNA25231387145

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

A WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,441 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Aug 2025
LandownerVillageDistrict
MRS. FLORY BLAZE VALLADARESMarolMumbai Suburban
MR. REYNOLD WILLIAM D'SOUZAMarolMumbai Suburban
MR. BARRY WILLIAM D'SOUZAMarolMumbai Suburban
MR. ARNOLD WILLIAM D'SOUZAMarolMumbai Suburban
MR. ROY VICTOR PEREIRAMarolMumbai Suburban
MR. JEFFREY VICTOR PEREIRAMarolMumbai Suburban
MR. JAIRZINHO VICTOR PEREIRAMarolMumbai Suburban
MR. GODWIN VICTOR PEREIRAMarolMumbai Suburban
MRS. BERNICE CLINSTON GONSALVESMarolMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI16740.08
Proposed, not sanctioned16,740 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASAI EAST
Estimated costRs 263.00 cr
Cost incurredRs 37.57 cr
Work done14.28%
BuildingWingEstimatedIncurred
A WINGNARs 87.67 crRs 12.52 cr
B WINGNARs 87.67 crRs 12.52 cr
C WINGNARs 87.67 crRs 12.52 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHENDRA DAVDA AND ASSOCIATES
EngineerADARSH CONSULTANT
Chartered AccountantNEHALI AND CO
PartnerRole in project
JANGID HOME PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: JHPL Architect Certificate -6-4-26.pdf1 Jun 2026
Withdrawal Update Form 1File: JHPL Architect Certificate -6-4-26.pdf1 Jun 2026
Withdrawal Update Form 2File: Form-2 Engrs Cert STR-11-2025-Meadows.pdf1 Jun 2026
Withdrawal Update Form 2File: Form-2 Engrs Cert STR-11-2025-Meadows.pdf1 Jun 2026
Withdrawal Update Form 3File: Signed CA Certificate Jangid Meadows March26.pdf1 Jun 2026
Withdrawal Update Form 3File: Signed CA Certificate Jangid Meadows March26.pdf1 Jun 2026
Withdrawal Update Form 1File: Architects Certificate JHPL ( 30-09-2025) (1).pdf30 May 2026
Withdrawal Update Form 1File: JHPL - Architect Certificate - 7-1-26.pdf30 May 2026
Withdrawal Update Form 2File: Form-2 Engrs Cert STR-24-2025-Meadows.pdf30 May 2026
Withdrawal Update Form 2File: Form-2 Engrs Cert STR-29-2025-Meadows.pdf30 May 2026
Withdrawal Update Form 3File: Signed CA Certificate Jangid Meadows Sept25.pdf30 May 2026
Withdrawal Update Form 3File: Signed CA Certificate Jangid Meadows Dec25.pdf30 May 2026
Withdrawal Update Form 1File: Architects Certificate JHPL ( 30-06-2025 ) (1).pdf29 May 2026
Withdrawal Update Form 2File: Form-2 Engrs Cert STR-15-2025-Meadows.pdf29 May 2026
Withdrawal Update Form 3File: Signed CA Certificate Jangid Meadows June 25.pdf29 May 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certificate Dec 23 Meadows.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 09 23.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 03 23.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 06 23.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 09 23.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 03 23.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 06 23.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 03 23.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 06 23.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 09 23.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf18 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Scan 05 Jan 2023.pdf10 Jan 2023
Declaration about Commencement CertificateFile: declaration about CC - Jangid Meadows.pdf10 Jan 2023
Proforma of Agreement for saleFile: Jangid Meadows Rera Agreement.pdf10 Jan 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE.pdf5 Jan 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE.pdf5 Jan 2023
CERSAI detailsFile: CERSAI DECLARATION.pdf5 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf5 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION.pdf5 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Agreement Deviation (1).pdf5 Jan 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to model copy of Agreement.pdf4 Jan 2023
Layout approvalFile: 4_5_merged.pdf2 Jan 2023
Layout approvalFile: 6_7_merged.pdf2 Jan 2023
Layout approvalFile: 8_9_merged.pdf2 Jan 2023
Layout approvalFile: 10_11_merged.pdf2 Jan 2023
Layout approvalFile: 12_13_merged.pdf2 Jan 2023
Layout approvalFile: 14_15_merged.pdf2 Jan 2023
Layout approvalFile: 16_17_18_merged.pdf2 Jan 2023
Layout approvalFile: 19_20_merged.pdf2 Jan 2023
Layout approvalFile: 21.pdf2 Jan 2023
Layout approvalFile: 22.pdf2 Jan 2023
Layout approvalFile: PLANS 1.pdf2 Jan 2023
Layout approvalFile: PLANS 2.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: PLANS 1.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: PLANS 2.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: 4_5_merged.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: 6_7_merged.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: 8_9_merged.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: 10_11_merged.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: 12_13_merged.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: 14_15_merged.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: 16_17_18_merged.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: 19_20_merged.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: 21.pdf2 Jan 2023
Copy of Layout Approval (in case of layout)File: 22.pdf2 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf2 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Letter - Om Jangid.pdf2 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Letter - Amrit L Jangid.pdf2 Jan 2023
Declaration in FORM BFile: FORM B.pdf24 Dec 2022
Building plan approvalFile: Bamandaya - IOD-IOA.pdf13 Dec 2022
PAN CardFile: JHPL COMPANY PAN CARD.PDF13 Dec 2022
Copy of the legal title reportFile: Jangid Meadows Format -A Legal Title Certificate.pdf13 Dec 2022
Details of encumbrances concerned to FinanceFile: No encumbrance self declaration.pdf13 Dec 2022
Details of encumbrances concerned to LegalFile: No encumbrance self declaration.pdf13 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Bamandaya - IOD-IOA.pdf13 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form-2 - Jangid Meadows.pdf13 Dec 2022
Proforma of Allotment letterFile: Allotment letter.pdf13 Dec 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
Jangid Galaxy Tower 3P51700004127Thane (M Corp.), ThaneAug 2017CompletedOct 2020Registered original: Dec 2018Late, Mar 2021

How this compares with Mumbai Suburban

18%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JANGID MEADOWS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near POWAI6,700+ in Mumbai Suburban

Builder: JANGID HOME PVT LTD

Jangid Home pvt Ltd has 2 registrations on MahaRERA, including Jangid Annexe and JANGID MEADOWS. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if JANGID MEADOWS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JANGID MEADOWS?

The registered promoter entity is JANGID HOME PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JANGID MEADOWS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JANGID MEADOWS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JANGID MEADOWS?

The professionals named in the filing: Architect: MAHENDRA DAVDA AND ASSOCIATES; Engineer: ADARSH CONSULTANT; Chartered Accountant: NEHALI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JANGID MEADOWS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JANGID MEADOWS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JANGID MEADOWS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.