Home / Browse projects / Mumbai Suburban, Maharashtra / NAHAR'S CHANDI VALLEY - PHASE I
NAHAR'S CHANDI VALLEY - PHASE I
RG-MH-31935 · RERA PM1180002500059 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NAHAR'S CHANDI VALLEY - PHASE I is a Mixed project by NAHAR BUILDERS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as PM1180002500059 on 26 May 2025. Possession is promised by 31 Dec 2030. 76 of the 308 units on this registration are recorded sold or booked, and 0 of 60 construction stages are filed complete.
At a glance
Project
- NameNAHAR'S CHANDI VALLEY - PHASE I
- TypeMixed
- Location
- Nahar Amrit Shakti
- Chandivali Nahar Amrit Shakti
- Chandivali
- Kurla
- Mumbai Suburban
- 400072
- Pincode400072
- MapView location on Google Maps (as filed on RERA)
- RERA no.PM1180002500059
- ReraGenie IDRG-MH-31935
Builder
- NameNAHAR BUILDERS LIMITED
- Entity typeCompany
- CINU45202MH2011PLC221752
- GSTIN27AADCN8065A1ZL
- Whole Time DirectorMANJU RAJESH YAGNIK
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 May 2025
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings6 building records
- Documents filed27 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER 1 | WING A - VALERIAN | 14 | 14 | 51 | 3 | 54 |
| TOWER 1 | WING B - VIOLET | 14 | 14 | 55 | 0 | 55 |
| TOWER 2 | WING C - VERBENA | 14 | 14 | 55 | 0 | 55 |
| TOWER 2 | WING D - VIBURNUM | 14 | 14 | 40 | 0 | 40 |
| TOWER 3 | WING E - VERONICA | 14 | 14 | 59 | 0 | 59 |
| TOWER 3 | WING F - VERVAIN | 14 | 14 | 45 | 0 | 45 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 60 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 61%.
TOWER 1 · wing WING A - VALERIAN8%
| Activity | Progress |
|---|---|
| Excavation | 61% |
| Basement (if any) | 21% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 1 · wing WING B - VIOLET8%
| Activity | Progress |
|---|---|
| Excavation | 61% |
| Basement (if any) | 21% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 2 · wing WING C - VERBENA3%
| Activity | Progress |
|---|---|
| Excavation | 33% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 2 · wing WING D - VIBURNUM3%
| Activity | Progress |
|---|---|
| Excavation | 33% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 3 · wing WING E - VERONICA1%
| Activity | Progress |
|---|---|
| Excavation | 13% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 3 · wing WING F - VERVAIN1%
| Activity | Progress |
|---|---|
| Excavation | 13% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 0% |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | Not applicable |
Parking filed686
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| TOWER 1 WING A - VALERIAN | 133 | 133 |
| TOWER 1 WING B - VIOLET | 119 | 119 |
| TOWER 2 WING C - VERBENA | 119 | 119 |
| TOWER 2 WING D - VIBURNUM | 88 | 88 |
| TOWER 3 WING E - VERONICA | 128 | 128 |
| TOWER 3 WING F - VERVAIN | 99 | 99 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TOWER 3 | WING F - VERVAIN | Rs 89.54 cr | Rs 2.90 cr |
| TOWER 3 | WING E - VERONICA | Rs 80.82 cr | Rs 2.60 cr |
| TOWER 2 | WING D - VIBURNUM | Rs 78.53 cr | Rs 2.60 cr |
| TOWER 1 | WING B - VIOLET | Rs 76.46 cr | Rs 2.50 cr |
| TOWER 1 | WING A - VALERIAN | Rs 76.23 cr | Rs 2.50 cr |
| TOWER 2 | WING C - VERBENA | Rs 73.42 cr | Rs 2.40 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAVIBHAI |
| Engineer | VINAY GAJANAN MUKADAM |
| Chartered Accountant | SHAILESH RATIKANT SALVI |
| Partner | Role in project |
|---|---|
| NAHAR BUILDERS LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 May 2025 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed27
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: NBL_R1B_RERA_Form 1_Architect Certificate_Mar26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: NBL_R1B_RERA_Form 2_Engineer Certificate_Mar26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: NBL_R1B_RERA_Form 3_CA Certificate_Mar26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Signed_Archt_Certificate_Form1_NBL_R1B_Chandivalley_Dec25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: 2_Signed Engineer Certifcate_Form2_NBL_R1B_Sep25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Signed_CA Certificate_Form3_NBL_R1B_Chandivalley_Dec25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: 1_Signed_Architect Certificate_form1_NBL_R1B_Sep25.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: 2_Signed Engineer Certifcate_Form2_NBL_R1B_Sep25.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: 3_Signed Form3_NBL_RERA_R1B_Sep25.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: R1B_RERA Architect Certificate_JUNE25_18_07_25.pdf | 19 Jul 2025 |
| Withdrawal Update Form 1File: R1B_RERA Architect Certificate_JUNE25_18_07_25.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Engineer Certificate Form2_NBL R1B_June25[1] 18 07 2025.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Engineer Certificate Form2_NBL R1B_June25[1] 18 07 2025.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: CA Form 3_R1B_RERA_QPR_Jun25.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: CA Form 3_R1B_RERA_QPR_Jun25.pdf | 19 Jul 2025 |
| Declaration and undertaking (Annexure A)File: NBL R1B Declaration Cum Undertaking Annexure A Order 50.pdf | 23 May 2025 |
| Layout approvalFile: Amended Plan Approval letter.pdf | 22 May 2025 |
| Layout approvalFile: 1 Pg 1-2_Amended Approval Plans Signed Scan copy.pdf | 22 May 2025 |
| Layout approvalFile: 2 Pg 3-4_Amended Approval Plans Signed Scan copy.pdf | 22 May 2025 |
| Layout approvalFile: 3 Pg 5-6_Amended Approval Plans Signed Scan copy.pdf | 22 May 2025 |
| Layout approvalFile: 4 Pg 7-8_Amended Approval Plans Signed Scan copy.pdf | 22 May 2025 |
| Layout approvalFile: 5 Pg 9-10_Amended Approval Plans Signed Scan copy.pdf | 22 May 2025 |
| Layout approvalFile: 6 Pg 11-12_Amended Approval Plans Signed Scan copy.pdf | 22 May 2025 |
| Building plan approvalFile: Amended plans approval Drawing _compressed_27.pdf | 9 May 2025 |
| Building plan approvalFile: Amended plans approval Drawing_compressed (1)-Pg-28-30.pdf | 9 May 2025 |
| Building plan approvalFile: CFO NOC Certificate_R1B.pdf | 7 May 2025 |
| Building plan approvalFile: IOD_Amended plans approval letter.pdf | 7 May 2025 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| AMARYLLIS TOWERS AND PLAZAP51800028801 | NAHAR AMRIT SHAKTI, Mumbai Suburban | 422 | Mar 2021 | Completed | Jun 2026 | Apr 2025 |
| Winterberry Tower and PlazaP51800047208 | NAHAR AMRIT SHAKTI, Mumbai Suburban | 42 | Oct 2022 | Ongoing | Mar 2026 | Not delivered |
| OLIVIAP51800003168 | Chandivali, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2022 | Dec 2022 |
| R-12/7 and 8 Barberny-Bryony | Nahar Amrit Shakti Chandivili | - | - | Completed | Aug 2015 | Dec 2014 |
| R 12 /11, YVONNE | Nahar Amrit Shakti Chandivili | - | - | Completed | Aug 2015 | Dec 2014 |
| R-20 Nahar Business Center | Nahar Amrit Shakti Chandivili | - | - | Completed | Jan 2015 | Jan 2015 |
| R-18 White Lily and Water Lily | Nahar Amrit Shakti Chandivili | - | - | Completed | Dec 2014 | Late, Jul 2016 |
| R-12,10 LAUREL-LILAC | Nahar Amrit Shakti Chandivili | - | - | Completed | Jun 2013 | Late, Feb 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 27 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NAHAR'S CHANDI VALLEY - PHASE I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chandivali Nahar Amrit Shakti6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 127 registered projects within 2 km.
AMARYLLIS TOWERS AND PLAZA
NAHAR BUILDERS LTD.
JANGID MEADOWS
JANGID HOME PVT LTD
KABRA RESIDENCY PARK
AHINSA BUILDTECH PVT LTD
IBIS at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
BARBET at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
C AND J CORPORATE PARK
Anil Arora
See every Mumbai Suburban project, with the district possession charts
Builder: NAHAR BUILDERS LIMITED
NAHAR BUILDERS LIMITED has 1 registration on MahaRERA, including NAHAR'S CHANDI VALLEY - PHASE I. Its filings disclose 8 earlier MahaRERA projects: declares 5 of 7 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if NAHAR'S CHANDI VALLEY - PHASE I is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NAHAR'S CHANDI VALLEY - PHASE I?
The registered promoter entity is NAHAR BUILDERS LIMITED, a company as per the filing. Its CIN U45202MH2011PLC221752 and GSTIN 27AADCN8065A1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NAHAR'S CHANDI VALLEY - PHASE I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NAHAR'S CHANDI VALLEY - PHASE I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NAHAR'S CHANDI VALLEY - PHASE I?
The professionals named in the filing: Architect: RAVIBHAI; Engineer: VINAY GAJANAN MUKADAM; Chartered Accountant: SHAILESH RATIKANT SALVI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NAHAR'S CHANDI VALLEY - PHASE I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.