New projects and RERA data in Kolhapur district, Maharashtra

880 projects are registered in Kolhapur district: 14,903 units across them, 70 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

880Projects covered
70Registered, last 12 months
14,903Units declared
10,475Units not yet booked
153Completion dates revised
8With declared litigation

Of the 880 covered registrations, 153 have revised their promised completion date and 8 declare litigation. The median project here is 19% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Kolhapur projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 880 projects with a promised date, 390 are recorded delivered, 269 are still on the register and 221 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

050100150200today2017: 9 projects, delivered2017: 2 projects, registration lapsed or cancelled’172018: 50 projects, delivered2018: 4 projects, registration lapsed or cancelled’182019: 40 projects, delivered2019: 7 projects, registration lapsed or cancelled’192020: 21 projects, delivered2020: 8 projects, registration lapsed or cancelled’202021: 27 projects, delivered2021: 22 projects, registration lapsed or cancelled’212022: 47 projects, delivered2022: 19 projects, registration lapsed or cancelled’222023: 49 projects, delivered2023: 33 projects, registration lapsed or cancelled’232024: 43 projects, delivered2024: 48 projects, registration lapsed or cancelled’242025: 52 projects, delivered2025: 50 projects, registration lapsed or cancelled’252026: 35 projects, delivered2026: 42 projects, on the register2026: 25 projects, registration lapsed or cancelled’262027: 14 projects, delivered2027: 73 projects, on the register2027: 2 projects, registration lapsed or cancelled’272028: 3 projects, delivered2028: 67 projects, on the register2028: 1 projects, registration lapsed or cancelled’282029: 44 projects, on the register’292030: 27 projects, on the register’302031: 12 projects, on the register’312032: 4 projects, on the register’32

349 projects promise possession in 2026 or later. Facts as per filings on RERA website.

01,2502,5003,7505,000today’172018: 71 flats, delivered (only 1 of 54 projects filed a flat count)’182019: 145 flats, delivered (only 2 of 47 projects filed a flat count)’192020: 22 flats, delivered (only 5 of 29 projects filed a flat count)2020: 71 flats, registration lapsed or cancelled (only 5 of 29 projects filed a flat count)’202021: 70 flats, registration lapsed or cancelled (only 3 of 49 projects filed a flat count)’21’222023: 192 flats, delivered (only 14 of 82 projects filed a flat count)2023: 313 flats, registration lapsed or cancelled (only 14 of 82 projects filed a flat count)’232024: 220 flats, delivered (only 6 of 91 projects filed a flat count)2024: 114 flats, registration lapsed or cancelled (only 6 of 91 projects filed a flat count)’242025: 876 flats, delivered (only 31 of 102 projects filed a flat count)2025: 581 flats, registration lapsed or cancelled (only 31 of 102 projects filed a flat count)’252026: 450 flats, delivered2026: 1,582 flats, on the register2026: 596 flats, registration lapsed or cancelled’262027: 416 flats, delivered2027: 1,828 flats, on the register’272028: 25 flats, delivered2028: 2,496 flats, on the register’282029: 1,454 flats, on the register’292030: 1,420 flats, on the register’302031: 1,628 flats, on the register’312032: 333 flats, on the register’32

12,228 flats are promised in 2026 or later, across the 73% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Kolhapur possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 152 of 880 projects (17%) have moved at least once; the median move is 18 months and the longest is 90 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

0255075100Originally due 2017: 11 projects kept the original date, 55% of the yearOriginally due 2017: 7 projects moved by under 2 years, 35% of the yearOriginally due 2017: 2 projects moved by 2 years or more, 10% of the year’17Originally due 2018: 45 projects kept the original date, 66% of the yearOriginally due 2018: 14 projects moved by under 2 years, 21% of the yearOriginally due 2018: 9 projects moved by 2 years or more, 13% of the year’18Originally due 2019: 36 projects kept the original date, 61% of the yearOriginally due 2019: 9 projects moved by under 2 years, 15% of the yearOriginally due 2019: 14 projects moved by 2 years or more, 24% of the year’19Originally due 2020: 18 projects kept the original date, 72% of the yearOriginally due 2020: 4 projects moved by under 2 years, 16% of the yearOriginally due 2020: 3 projects moved by 2 years or more, 12% of the year’20Originally due 2021: 40 projects kept the original date, 77% of the yearOriginally due 2021: 2 projects moved by under 2 years, 4% of the yearOriginally due 2021: 10 projects moved by 2 years or more, 19% of the year’21Originally due 2022: 56 projects kept the original date, 82% of the yearOriginally due 2022: 5 projects moved by under 2 years, 7% of the yearOriginally due 2022: 7 projects moved by 2 years or more, 10% of the year’22Originally due 2023: 69 projects kept the original date, 79% of the yearOriginally due 2023: 6 projects moved by under 2 years, 7% of the yearOriginally due 2023: 12 projects moved by 2 years or more, 14% of the year’23Originally due 2024: 75 projects kept the original date, 77% of the yearOriginally due 2024: 17 projects moved by under 2 years, 17% of the yearOriginally due 2024: 6 projects moved by 2 years or more, 6% of the year’24Originally due 2025: 73 projects kept the original date, 83% of the yearOriginally due 2025: 12 projects moved by under 2 years, 14% of the yearOriginally due 2025: 3 projects moved by 2 years or more, 3% of the year’25Originally due 2026: 78 projects kept the original date, 96% of the yearOriginally due 2026: 3 projects moved by under 2 years, 4% of the year’26Originally due 2027: 80 projects kept the original date, 98% of the yearOriginally due 2027: 2 projects moved by under 2 years, 2% of the year’27Originally due 2028: 66 projects kept the original date, 97% of the yearOriginally due 2028: 2 projects moved by under 2 years, 3% of the year’28Originally due 2029: 40 projects kept the original date, 95% of the yearOriginally due 2029: 2 projects moved by under 2 years, 5% of the year’29Originally due 2030: 26 projects kept the original date, 100% of the year’30Originally due 2031: 12 projects kept the original date, 92% of the yearOriginally due 2031: 1 projects moved by under 2 years, 8% of the year’31Originally due 2032: 3 projects kept the original date, 100% of the year’32

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

06251,2501,8752,500’17Originally due 2018: 71 flats kept the original date, 66% of the year (only 1 of 68 projects filed a flat count)’18Originally due 2019: 145 flats kept the original date, 61% of the year (only 5 of 59 projects filed a flat count)Originally due 2019: 56 flats moved by 2 years or more, 24% of the year (only 5 of 59 projects filed a flat count)’19Originally due 2020: 93 flats kept the original date, 72% of the year (only 5 of 25 projects filed a flat count)’20Originally due 2021: 70 flats kept the original date, 77% of the year (only 6 of 52 projects filed a flat count)Originally due 2021: 420 flats moved by 2 years or more, 19% of the year (only 6 of 52 projects filed a flat count)’21Originally due 2022: 334 flats moved by 2 years or more, 10% of the year (only 1 of 68 projects filed a flat count)’22Originally due 2023: 470 flats kept the original date, 79% of the year (only 22 of 87 projects filed a flat count)Originally due 2023: 112 flats moved by under 2 years, 7% of the year (only 22 of 87 projects filed a flat count)Originally due 2023: 269 flats moved by 2 years or more, 14% of the year (only 22 of 87 projects filed a flat count)’23Originally due 2024: 257 flats kept the original date, 77% of the year (only 19 of 98 projects filed a flat count)Originally due 2024: 367 flats moved by under 2 years, 17% of the year (only 19 of 98 projects filed a flat count)Originally due 2024: 192 flats moved by 2 years or more, 6% of the year (only 19 of 98 projects filed a flat count)’24Originally due 2025: 700 flats kept the original date, 83% of the year (only 33 of 88 projects filed a flat count)Originally due 2025: 652 flats moved by under 2 years, 14% of the year (only 33 of 88 projects filed a flat count)Originally due 2025: 116 flats moved by 2 years or more, 3% of the year (only 33 of 88 projects filed a flat count)’25Originally due 2026: 1,519 flats kept the original date, 96% of the year (only 36 of 81 projects filed a flat count)Originally due 2026: 123 flats moved by under 2 years, 4% of the year (only 36 of 81 projects filed a flat count)’26Originally due 2027: 1,887 flats kept the original date, 98% of the yearOriginally due 2027: 133 flats moved by under 2 years, 2% of the year’27Originally due 2028: 2,141 flats kept the original date, 97% of the yearOriginally due 2028: 34 flats moved by under 2 years, 3% of the year’28Originally due 2029: 1,331 flats kept the original date, 95% of the yearOriginally due 2029: 68 flats moved by under 2 years, 5% of the year’29Originally due 2030: 1,382 flats kept the original date, 100% of the year’30Originally due 2031: 1,628 flats kept the original date, 92% of the yearOriginally due 2031: 65 flats moved by under 2 years, 8% of the year’31Originally due 2032: 268 flats kept the original date, 100% of the year’32

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Kolhapur

Who sanctions building in Kolhapur

284 of the 880 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Kolhapur Municipal Corporation196
Kolhapur Urban Area Development Authority17
34 other bodies71

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 880 registrations on this page answers this: on 513 the promoter is the only owner named; on 315 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 52 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Kolhapur: projects by taluka

880 of the 880 registrations on this page name their taluka.

TalukaProjectsShare
Karvir60168%
Hatkanangle10011%
Gadhinglaj8710%
Shirol465%
8 other talukas465%

Projects in Kolhapur

Showing 1 to 60 of 880 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
HIGHSTREET CBD - TOWER AKARVEER, 416007HIGHSTREET DEVELOPERS5319%2 Feb 2026Registered
ELIXA PARKā€˜E’ Ward, 416001AJAYSINH V DESAI BUILDERS & DEVELOPERS33485%29 Jul 2017Completed
GATEWAY RESIDENCIESUchgaon (CT), 416005SIDDHIVINAYAK DEVELOPERS31410%29 Jan 2026Registered
24 KEYWEST EAST AND WEST AVENUEIN FRONT OF INCOME TAX OFFICE, 416003KEYWEST INFRA3074%14 Jul 2025Registered
SHAMRAO SHELKE COMMERCIAL AND RESIDENTIAL COMPLEXBAMBAWADE, 416015TRIVENI INFRAPROJECT PVT LTD25751%10 Aug 2017Registered
PRATHAM PRASAD GARDENSPHULEWADI, 416010GURUPRASAD DEVELOPERS AND BUILDERS25047%22 Dec 2022Registered
Loknagari Karande MalaKarande Mala, Kasaba Bawada E Ward, Kadamwadi Road, 416003VIKESH ABHAYKUMAR OSWAL2300%25 May 2026Registered
GRUHALAXMI RACHANASambhaji Nagar, 416012BATU BUILDERS19854%29 Nov 2021Registered
SHRI MAHALAXMI RESIDENCYMOUJE WADIPIR, 416001SUPRIYA SACHIN MANGALE16938%6 Feb 2024Registered
WESTERN GATEWAYPhulewadi, 416010Harmony Vision16818%21 Aug 2023Registered
M/S. BALAJI PROPERTIESUCHGAON, 416004VISHAL KANTILAL CHORDIA HUF1610%11 Sep 2023Completed
SRI SRI RESIDENCYSambhaji Nagar 'B' Ward Near Magdum Lawn, Kolhapur, 416012SRI SRI BUILDERS AND DEVELOPERS PROPRIETOR VIJAY KISANLAL AGARWAL15868%18 Feb 2021Registration lapsed
THE BALSAMA Ward Sane Guruji Vasahat KII Karveer, 416011M/S JOTIRADITYA BUILDERS1440%29 May 2026Registered
ONE EARTHKolhapur (M Corp.), 416012DESHPANDE INFRA1355%10 Dec 2025Registered
KRYSTAL TOWERSE WARD, 416003RAYSONS CONSTRUCTIONS13141%31 May 2024Registered
HIGHSTREET CBD - TOWER EHockey Stadium Chowk, 416007HIGHSTREET DEVELOPERS12838%2 Feb 2026Registered
DRONAGIRIJIWBA NANA JADHAV PARK, 416012ASHTIN INDIA PVT LTD12681%11 Apr 2022Registered
HIGHSTREET CBD - TOWER DHOCKEY STADIUM CHOWK, 416007HIGHSTREET DEVELOPERS12666%27 Mar 2025Registered
plotted development scheme on gat no 417 at Radhanagri taluka Radhanagri dist KolhapurRadhanagari, 416212Pune Housing and Area Development Board Pune12372%14 Aug 2017Completed
JEWEL SQUAREB WARD MANGALWAR PETH, 416012RATNARAJ BUILDERS AND DEVELOPERS1206%16 May 2024Registered
Eminent SquareRing Road, 416008SHRI SIDDHIVINAYAK ASSOCIATES11326%19 Jul 2023Registered
AMEY HI LIFEnana patil nagar, 416010AMEY ESTATE10990%28 Jul 2017Completed
ROYAL PLANETE ward Opp Rajesh Motors, 416001SURAJ ESTATE DEVELOPERS10861%12 Dec 2022Completed
BEEZHIVEE WARD, SHAHUPURI, 416001BEDEKAR LIFESPACES LLP10626%29 May 2021Completed
Mixed-B 3 MayyzChafodi T.tarale, 242342Rupal as Companyz1042%1 Jan 2024Registration lapsed
PunyaSrushti Tower B and CPratibhanagar, 416008Punyasrushti Sahakari Gruhnirman Sanstha Maryadit1033%27 Jun 2023Registered
DWARKA EUROUchgaon, 416005Randive Builders and Developers9833%8 Jul 2021Registered
SANJAY GHODAWAT INDUSTRIAL PARKMouje Majale, 416109Ghodawat Eduserve Limited Liability Partnership970%30 Mar 2022Registration lapsed
Suryoday Nagar Layout-Buchgaon, 416005Suraj Land Developments960%14 Dec 2020Completed
ANANT PRIDE PHASE IIIBANK SHIPAI COLONY, 416007VIVEKANAND VASANTRAO PATIL900%11 May 2026Registered
NIMBALKAR HERITAGETarabai Road, 416008MORBALE INFRA PROJECT PRIVATE LIMITED900%21 May 2026Registered
SAPPHIRE SKYDevkar Panand, 416012S.S.Builders and Developers8918%24 May 2022Registered
ROYAL 09 TOURIST BUSINESS HUBE ward, 416001SURAJ ESTATE DEVELOPERS8844%6 Aug 2022Completed
EMH - 2-, 416145Padmavati Developers860%10 Oct 2022Registration lapsed
GAYATRI-BHAWANI APARTMENTTARABAI PARK, 416003Vijaykumar Vasudev Patki8638%17 Aug 2017Registration lapsed
CRYSTAL SKYLINESALOKHE NAGAR, 416007Build Angle Builders and Developers8522%17 Dec 2024Registered
Gajalaxmi ParkHatkanagle, 416115Amit Yashwant Singh and Others850%23 May 2020Registration lapsed
YASHSHRI - GRAND LAKE VISTAA WARD, 416012DESTINY BUILDERS850%1 Oct 2026Registered
Atharva Sky Line Wing-BUjalaiwadi, 416005Sanjay Prabhakar Kulkarni8474%14 Nov 2019Registered
IDEAL ELITEMorewadi, 416013IDEAL PROPERTIES846%21 Jan 2026Registered
SEQUOIA RISEE WARD, 416013AMAR PANDURANG JADHAV840%27 Apr 2026Registered
RADHA REGENCYRamanand nagar, 416007VJ AND SPACE REALTORS830%11 Sep 2026Registered
PUNYA SHLOK TOWER I AND TOWER IIE WARD KOLHAPUR, 416005RAMSINA CONSTRUCTIONS PVT LTD8019%19 Jan 2024Registration lapsed
TIME SQUAREGavat Mandai Kolhapur, 416001GREY BRICKS REALITY800%1 Oct 2026Registered
Viraj City Building FKagal, 416216Bhuyekar Patil Construction Company8046%28 Apr 2022Registered
INDRANAND GREENSKolhapur, 416004Satish Anandrao Ghorpade7758%7 Oct 2017Registered
PUNYA ARPITTAKALA, 416008RAMSINA CONSTRUCTIONS PVT LTD7779%20 Apr 2022Registration lapsed
SHREE SAMARTH HEIGHTSGADHINGLAJ, 416502SHREE SAMARTH HEIGHTS7212%25 Aug 2023Registered
HARMONY MADHUBANE WARD, KATKAR MAL, TAKALA, 416008M/S HARMONY INFRA7127%2 Feb 2024Registered
OM SAI PARADISENA, 416502SHREE BALAJI BUILDERS AND DEVELOPERS7114%15 Apr 2024Completed
plotted development at Gat no 49 Gaganbavda taluka Gaganbavda district KolhapurGagan Bavda, 416206Pune Housing and Area Development Board Pune7194%1 Sep 2017Completed
RAJARAM SHIVGONDA GORULEHARALI BUDRUK, 416502RAJARAM SHIVGONDA GORULE7079%6 Dec 2020Registration lapsed
Gajanan Venkatesh ComplexNagala Park, 416012Vishal Developers6983%29 Dec 2021Registered
HARIPRIYA SANKULNIRMAN CHOWK, 416012DATTA SAI BUILDERS AND DEVELOPERS6943%19 Jul 2023Registered
LAVANGONDA SHIVGONDA PATILA/P- HARALI, 416502LAVANGONDA SHIVGONDA PATILL6933%20 Jan 2020Registered
AMBAI RESIDENCYRankala west, 416012M/S HARMONY INFRA6781%4 Jan 2022Completed
Jainapur Industrial ParkJainapur, 416101Jainapur Vikas Industrial Association and Samruddhi Industries Ltd.660%21 Oct 2020Registration lapsed
Vrindavan ParadiseDHARMRAJ CHOWK, 416115HBD DEVELOPERS6627%21 Feb 2024Registered
AMEY HI LIFE WING C & DKolhapur (M Corp.), 416010AMEY ESTATES650%11 Sep 2025Registered
AERO CITYUJALAIWADI TAL-KARVIR, 416004VIJAY SADHURAM PANJWANI640%11 Sep 2026Registered
Planning a launch in Kolhapur? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Kolhapur

DESHPANDE INFRA (7), Pune Housing and Area Development Board Pune (7), BHASKAR RAMGONDA PATIL (6), Tushar Mohanrao Khatavkar (6), HIGHSTREET DEVELOPERS (5), THE IDEAL CONSTRUCTION (5). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Kolhapur projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 19% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Kolhapur project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Kolhapur district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Kolhapur registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Kolhapur project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Kolhapur district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.