Home / Browse projects / Kolhapur, Maharashtra / HARIPRIYA SANKUL

Registered No litigation declared Others project

HARIPRIYA SANKUL

By DATTA SAI BUILDERS AND DEVELOPERS

RG-MH-66322 · RERA P53000052036 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Staircases, 80%
39 of 69Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

HARIPRIYA SANKUL is a Others project by DATTA SAI BUILDERS AND DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000052036 on 19 Jul 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 30 of the 69 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameHARIPRIYA SANKUL
  • TypeOthers
  • Location
    • NEAR NIRMAN CHOWK
    • 100 FEET RING ROAD.
    • NIRMAN CHOWK
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416012
  • Pincode416012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000052036
  • ReraGenie IDRG-MH-66322

Builder

  • NameDATTA SAI BUILDERS AND DEVELOPERS
  • Entity typeOthers
  • PartnerYogesh Vyanktesh Athale
  • Named personVENKTESHWARA CONSTRUCTIONS
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2023First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Jul 2023
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed89 files

Current status

43%30 of 69 units booked
53.5%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HARIPRIYA SANKULNA1211442569

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

HARIPRIYA SANKUL: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises73%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VYANKTESHWARA CONSTRUCTIONSKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI3416.52
Proposed, not sanctioned3,417 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1014 A WARD,KHARI CORNER,KOLHAPUR
Estimated costRs 24.19 cr
Cost incurredRs 12.93 cr
Work done53.45%
BuildingWingEstimatedIncurred
HARIPRIYA SANKULNARs 12.09 crRs 6.46 cr
-NARs 12.09 crRs 6.46 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL SASANE
EngineerRAVINDRA WANDKAR
Chartered AccountantGIRISH MULEY
PartnerRole in project
DATTA SAI BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53000024084Mar 2026 → Mar 2027

Reason as filed by the promoterBuilt up area is increased due to recent revision of plan resulting in delay.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 march 2026.pdf23 Apr 2026
Withdrawal Update Form 2File: FORM 2 MARCH 2026.pdf23 Apr 2026
Withdrawal Update Form 3File: FORM- 3 march 2026_compressed.pdf23 Apr 2026
Form 2A (FY 2025-2026)File: FORM 2A.pdf23 Apr 2026
Form 5 (FY 2025-2026)File: FORM 5 march 2026.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf16 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM-2.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM-2.pdf16 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf16 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf16 Jan 2026
Withdrawal Update Form 1File: RERA CERTIFICATE MIRAJKAR20250710.pdf15 Oct 2025
Withdrawal Update Form 1File: RERA CERTIFICATE MIRAJKAR20250710.pdf15 Oct 2025
Withdrawal Update Form 2File: FORM - 2.pdf15 Oct 2025
Withdrawal Update Form 2File: FORM - 2.pdf15 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf15 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf15 Oct 2025
Withdrawal Update Form 1File: FORM - 1.pdf10 Jul 2025
Withdrawal Update Form 1File: FORM - 1.pdf10 Jul 2025
Withdrawal Update Form 2File: FORM - 2.pdf10 Jul 2025
Withdrawal Update Form 2File: FORM - 2.pdf10 Jul 2025
Withdrawal Update Form 3File: FORM - 3.pdf10 Jul 2025
Withdrawal Update Form 3File: FORM - 3.pdf10 Jul 2025
Form 2A (FY 2024-2025)File: ANNEXURE - A FORM - 2A.pdf10 Jul 2025
Withdrawal Update Form 1File: HARIPRIYA SANKUL FORM NO 1.pdf16 Jun 2025
Withdrawal Update Form 1File: FORM 1.pdf16 Jun 2025
Withdrawal Update Form 216 Jun 2025
Withdrawal Update Form 216 Jun 2025
Withdrawal Update Form 3File: FORM 3.pdf16 Jun 2025
Withdrawal Update Form 3File: FORM 3.pdf16 Jun 2025
Form 5 (FY 2024-2025)File: FORM - 5.pdf13 Jun 2025
Form 1File: RERA_FORM 1_Haripriya sankul.pdf12 Jun 2025
Form 2File: ANNEXURE - B FORM - 2.pdf12 Jun 2025
OthersFile: ANNEXURE - A FORM - 2A.pdf12 Jun 2025
Form 3File: FORM 3.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory.pdf12 Jun 2025
Building plan approvalFile: HPSC0982_compressed.pdf8 Jun 2024
Building plan approvalFile: HPSC0984_compressed.pdf8 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0982_compressed.pdf8 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0984_compressed.pdf8 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: sudharit badhkam parvana_compressed.pdf8 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HARIPRIYA SANKUL FORM NO 1.pdf22 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HARIPRIYA SANKUL FORM NO 3.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 06022024.pdf25 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 06022024.pdf25 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Haripriya Sankul 25032024.pdf25 Mar 2024
Proforma of Agreement for saleFile: Aggriment For Sale.pdf12 Jul 2023
Proforma of Allotment letterFile: Alootment Letter new_compressed.pdf5 Jul 2023
Layout approvalFile: 7.pdf17 Jun 2023
Building plan approvalFile: (1).pdf17 Jun 2023
Building plan approvalFile: 2.pdf17 Jun 2023
Building plan approvalFile: 3.pdf17 Jun 2023
Building plan approvalFile: 4.pdf17 Jun 2023
Building plan approvalFile: 5 (1).pdf17 Jun 2023
Building plan approvalFile: 6.pdf17 Jun 2023
Building plan approvalFile: 4.pdf17 Jun 2023
Building plan approvalFile: 5 (1).pdf17 Jun 2023
Copy of Layout Approval (in case of layout)File: 7.pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: (1).pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 (1).pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 (1).pdf17 Jun 2023
Declaration in FORM BFile: DATTA SAI FORM B.pdf29 Apr 2023
Declaration in FORM BFile: VENKATESHWARA FORM B_compressed.pdf29 Apr 2023
Declaration in FORM BFile: watmuktiyar POA.pdf29 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DATTA SAI ANNEXURE A.pdf29 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: VENKATESHWARA ANNEXURE A.pdf29 Apr 2023
Details of encumbrances concerned to FinanceFile: new finance encumbrance.pdf19 Apr 2023
Details of encumbrances concerned to FinanceFile: New legal encumbrance.pdf19 Apr 2023
Details of encumbrances concerned to LegalFile: new finance encumbrance.pdf19 Apr 2023
Details of encumbrances concerned to LegalFile: New legal encumbrance.pdf19 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 17FORM 3 CA CERTIFICATE.pdf17 Apr 2023
Deviation Report with respect to Allotment letterFile: Allotment Letter.pdf11 Apr 2023
Deviation Report with respect to Allotment letterFile: Allotment Letter.pdf11 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Agreemant for Sale.pdf11 Apr 2023
Layout approvalFile: 5Layout.pdf27 Mar 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Gurubal ViharP53000048211Mangalwar Peth, Kolhapur21Dec 2022CompletedDec 2024Late, Jan 2025
Green HeavenP53000019213Mohite Park, Kolhapur19Jan 2019CompletedMar 2022Late, Apr 2022

How this compares with Kolhapur

43%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one moved by 12 months
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep HARIPRIYA SANKUL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NIRMAN CHOWK880+ in Kolhapur

2 kmHARIPRIYA SANKULCompleted 26Lapsed / revoked 11Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 83 registered projects within 2 km.

Builder: DATTA SAI BUILDERS AND DEVELOPERS

DATTA SAI BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including HARIPRIYA SANKUL. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if HARIPRIYA SANKUL is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HARIPRIYA SANKUL?

The registered promoter entity is DATTA SAI BUILDERS AND DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HARIPRIYA SANKUL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HARIPRIYA SANKUL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HARIPRIYA SANKUL?

The professionals named in the filing: Architect: RAHUL SASANE; Engineer: RAVINDRA WANDKAR; Chartered Accountant: GIRISH MULEY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HARIPRIYA SANKUL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HARIPRIYA SANKUL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HARIPRIYA SANKUL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.