Home / Browse projects / Kolhapur, Maharashtra / PUNYA SHLOK TOWER I AND TOWER II
PUNYA SHLOK TOWER I AND TOWER II
By RAMSINA CONSTRUCTIONS PVT LTD
RG-MH-48874 · RERA P53000054418 · Last updated on MahaRERA portal: 14 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 6 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PUNYA SHLOK TOWER I AND TOWER II is a Residential / Group Housing project by RAMSINA CONSTRUCTIONS PVT LTD in Kolhapur, Maharashtra, registered with MahaRERA as P53000054418 on 19 Jan 2024. Possession was promised by 30 Apr 2026 and is now 6 months past that date. 15 of the 80 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.
At a glance
Project
- NamePUNYA SHLOK TOWER I AND TOWER II
- TypeResidential / Group Housing
- Location
- C S NO 2100 / C - 277
- E WARD KOLHAPUR
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416005
- Pincode416005
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000054418
- ReraGenie IDRG-MH-48874
Builder
- NameRAMSINA CONSTRUCTIONS PVT LTD
- Entity typeCompany
- DirectorVIKESH ABHAYKUMAR OSWAL
- Other registrations3 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 Jan 2024
- Promised completion30 Apr 2026
- Revised completionNone
- Buildings2 building records
- Documents filed83 files
Current status
Figures as on 14 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER I | NA | 8 | 6 | 48 | 0 | 48 |
| TOWER II | NA | 10 | 8 | 32 | 0 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 80%.
TOWER I66%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER II66%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed214
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| TOWER I | 117 | 117 |
| TOWER II | 97 | 97 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Salag Sahakari Gruh Nirman Sanstha Maryadit Kolhap | Kolhapur (M Corp.) | Kolhapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TOWER I | NA | Rs 6.86 cr | Rs 4.47 cr |
| TOWER II | NA | Rs 6.86 cr | Rs 4.47 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Amar Tendulkar Architects |
| Architect | CHAITANYA BHURKE |
| Engineer | ShekharRevalkar and Associates |
| Chartered Accountant | V T and Associates |
| Chartered Accountant | SAW & Associates |
| Partner | Role in project |
|---|---|
| RAMSINA CONSTRUCTIONS PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3_Shlok 1n2_Q4202526 (F)_compressed.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf | 13 May 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf | 13 May 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 (F)_compressed.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: Form-1_June2025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: Form-2-June2025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: Form-3-CACertificate_June2025(F).pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: Form-3-_June2025(F).pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 (F).pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: Form-1-Architectu0027s Certificate (F).pdf | 14 Dec 2025 |
| Withdrawal Update Form 1File: Form-1-Architectu0027s Certificate (F).pdf | 14 Dec 2025 |
| Withdrawal Update Form 2File: Form-2-Engineeru0027s certificate_Shlok (F).pdf | 14 Dec 2025 |
| Withdrawal Update Form 2File: Form-2-Engineeru0027s certificate_Shlok (F).pdf | 14 Dec 2025 |
| Withdrawal Update Form 3File: Form-3-CACertificate_June2025(F).pdf | 14 Dec 2025 |
| Withdrawal Update Form 3File: Form-3-CACertificate_June2025(F).pdf | 14 Dec 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Srushti BnC_Dec2024.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Architect's Certificate (F).pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer's certificate_Shlok (F).pdf | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 31122024-DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3, CACertificate_Sept2024_(R).pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Architect's Certificate (F).pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer's certificate_Shlok (F).pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Architect's Certificate_June2024.pdf | 19 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer's certificate_Shlok_June2024.pdf | 19 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_June2024.pdf | 19 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Punya Sholk_June2024_compressed.pdf | 19 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate.pdf | 18 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Architect's Certificate.pdf | 18 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer's certificate_Shlok.pdf | 18 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Quality Assurance Certificate 202324.pdf | 18 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 1-DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 18 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 2-DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3, CACertificate_word_compressed.pdf | 18 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Form-3, CACertificate_word_compressed.pdf | 18 Jun 2024 |
| Other - LegalFile: FORM-B_Salag Sanstha.pdf | 11 Jan 2024 |
| Other - LegalFile: Development Agreement Punya Shlok.pdf | 11 Jan 2024 |
| Other - LegalFile: POA Punya Slhok.pdf | 11 Jan 2024 |
| Other - LegalFile: Declaration_Pramoter.pdf | 18 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12-1 CA Certificate_Form No 3_Revise_compressed.pdf | 30 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12-2 Declaration About Nil Consideration in Form No 3.pdf | 30 Nov 2023 |
| Other - FinanceFile: 12-2 Declaration About Nil Consideration in Form No 3.pdf | 30 Nov 2023 |
| Copy of the legal title reportFile: 2 Legal Title n Flow of the Title Report_compressed.pdf | 28 Nov 2023 |
| Copy of the legal title reportFile: 3 TITLE AND ENCUMBRANCES REPOR New.pdf | 28 Nov 2023 |
| Layout approvalFile: Layout-Final Amalgamation plan 06-01-2023_compressed.pdf | 21 Oct 2023 |
| Building plan approvalFile: 1-6_Proforma_compressed.pdf | 21 Oct 2023 |
| Building plan approvalFile: 2-6_Tower I and Tower II - Parking and Ground Floor_compressed.pdf | 21 Oct 2023 |
| Building plan approvalFile: 3-6_Tower I and Tower II (First and Sixth Floor)_compressed.pdf | 21 Oct 2023 |
| Building plan approvalFile: 4-6_Tower I (Terrace Floor) and Tower II (Seventh Floor)_compressed.pdf | 21 Oct 2023 |
| Building plan approvalFile: 5-6_Section A_compressed.pdf | 21 Oct 2023 |
| Building plan approvalFile: 6-6_Section B_compressed.pdf | 21 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Layout-Final Amalgamation plan 06-01-2023_compressed.pdf | 21 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-6_Proforma_compressed.pdf | 21 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-6_Tower I and Tower II - Parking and Ground Floor_compressed.pdf | 21 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-6_Tower I and Tower II (First and Sixth Floor)_compressed.pdf | 21 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-6_Tower I (Terrace Floor) and Tower II (Seventh Floor)_compressed.pdf | 21 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5-6_Section A_compressed.pdf | 21 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6-6_Section B_compressed.pdf | 21 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 13-09-2023_compressed.pdf | 21 Oct 2023 |
| Declaration about Commencement CertificateFile: 6 Declaration About CC.pdf | 21 Oct 2023 |
| CERSAI detailsFile: 11-1 Declaration About Cersai.pdf | 21 Oct 2023 |
| PAN CardFile: 1 RCPL_PanCard.pdf | 20 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: 4 Encumbrance Related Finance.pdf | 20 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: 5 Encumbrance Related Legal.pdf | 20 Oct 2023 |
| Details of encumbrances concerned to LegalFile: 4 Encumbrance Related Finance.pdf | 20 Oct 2023 |
| Details of encumbrances concerned to LegalFile: 5 Encumbrance Related Legal.pdf | 20 Oct 2023 |
| Declaration about Commencement CertificateFile: 6 Declaration About CC.pdf | 20 Oct 2023 |
| Declaration in FORM BFile: 7 FORM-B PunyaShlok_compressed.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect Certificate_Form No 1.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form 02-Engineers certificate.pdf | 20 Oct 2023 |
| CERSAI detailsFile: 11 CERSAI.pdf | 20 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 13 Disclosure of interest in other organisations.pdf | 20 Oct 2023 |
| Proforma of Agreement for saleFile: 14 ATS FINAL Punya Shlok.pdf | 20 Oct 2023 |
| Proforma of Allotment letterFile: 15 Allotment Letter Punya Shlok Tower I AND II.pdf | 20 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 16 Separate Bank Account.pdf | 20 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PUNYA SHLOK TOWER I AND TOWER II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near E WARD KOLHAPUR880+ in Kolhapur
Filed coordinates, straight-line distance. 115 registered projects within 2 km.
GATEWAY RESIDENCIES
SIDDHIVINAYAK DEVELOPERS
DWARKA EURO
Randive Builders and Developers
Suryoday Nagar Layout-B
Suraj Land Developments
Atharva Sky Line Wing-B
Sanjay Prabhakar Kulkarni
NOBLE POINT
Masute and Patil Builders
ATHARVA SPANDAN
HEMANT PRABHAKAR KULKARNI
See every Kolhapur project, with the district possession charts
Builder: RAMSINA CONSTRUCTIONS PVT LTD
Ramsina Constructions Pvt. Ltd has 4 registrations on MahaRERA, including TUSTI and PUNYA ARPIT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What does it mean that PUNYA SHLOK TOWER I AND TOWER II shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PUNYA SHLOK TOWER I AND TOWER II is delayed beyond 30 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PUNYA SHLOK TOWER I AND TOWER II?
The registered promoter entity is RAMSINA CONSTRUCTIONS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PUNYA SHLOK TOWER I AND TOWER II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PUNYA SHLOK TOWER I AND TOWER II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PUNYA SHLOK TOWER I AND TOWER II?
The professionals named in the filing: Architect: Amar Tendulkar Architects; Architect: CHAITANYA BHURKE; Engineer: ShekharRevalkar and Associates; Chartered Accountant: V T and Associates; Chartered Accountant: SAW & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PUNYA SHLOK TOWER I AND TOWER II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback