PunyaSrushti Tower B and C
By Punyasrushti Sahakari Gruhnirman Sanstha Maryadit
RG-MH-93263 · RERA P53000051732 · Last updated on MahaRERA portal: 14 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PunyaSrushti Tower B and C is a Residential / Group Housing project by Punyasrushti Sahakari Gruhnirman Sanstha Maryadit in Kolhapur, Maharashtra, registered with MahaRERA as P53000051732 on 27 Jun 2023. Possession is promised by 30 Nov 2026. 3 of the 103 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.
At a glance
Project
- NamePunyaSrushti Tower B and C
- TypeResidential / Group Housing
- Location
- E Ward
- Pratibhanagar
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416008
- Pincode416008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000051732
- ReraGenie IDRG-MH-93263
Builder
- NamePunyasrushti Sahakari Gruhnirman Sanstha Maryadit
- Entity typeSociety
- ChairpersonSatyajeet Balaso Bodake
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jun 2023
- Promised completion30 Nov 2026
- Revised completionNone
- Buildings2 building records
- Documents filed123 files
Current status
Figures as on 14 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Punya Srushti Tower B | NA | 18 | 14 | 68 | 0 | 68 |
| Punya Srushti Tower C | NA | 17 | 12 | 35 | 0 | 35 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 55%.
Punya Srushti Tower B57%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 55% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 55% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Punya Srushti Tower C47%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Punya Srushti Tower B | 1 | 1 |
| Punya Srushti Tower C | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Punya Srushti Tower B | NA | Rs 24.61 cr | Rs 3.45 cr |
| Punya Srushti Tower C | NA | Rs 24.61 cr | Rs 3.45 cr |
| - | NA | Rs 81.87 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Amar Tendulkar Architect |
| Engineer | Shekhar Ravalkar Associates |
| Chartered Accountant | V T & Associates |
| Chartered Accountant | SAW & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Punyasrushti Sahakari Gruhnirman Sanstha Maryadit | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| WP/2279/2013/2013 | High Court of Bombay | Disposed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Nov 2026
Documents filed123
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3_SrushtiBnC_Q4202526_(F)_compressed.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf | 13 May 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf | 13 May 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 (F)_Q3_202526_compressed.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1_Sept2025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2_Sept2025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3_Sept2025.pdf | 16 Jan 2026 |
| Form 1File: Form -1-Punya Srushti Architect Certificate (F).pdf | 6 Sep 2025 |
| Form 2File: Form -2-Engineer's certificate (F).pdf | 6 Sep 2025 |
| Form 3File: Form -3 -PUNYA SHRUSHTI TOWER B&C Q4 RERA.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 31032025-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB&C.pdf | 6 Sep 2025 |
| Form 1File: Form -1-Punya Srushti Architect Certificate.pdf | 6 Sep 2025 |
| Form 2File: Form -2-Engineer's certificate.pdf | 6 Sep 2025 |
| Form 3File: Form 3_Tower BandC_Compress.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB&C.pdf | 6 Sep 2025 |
| Form 1File: Form -1-Punya Srushti Architect Certificate.pdf | 6 Sep 2025 |
| Form 2File: Form -2-Engineer's certificate.pdf | 6 Sep 2025 |
| Form 3File: Form 3_Srushti_B_C(F)_compressed.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB&C - Copy.pdf | 6 Sep 2025 |
| Form 1File: Form -1-Punya Srushti Architect Certificate.pdf | 6 Sep 2025 |
| Form 2File: Form -2-Engineer's certificate.pdf | 6 Sep 2025 |
| Form 3File: Form-3, CACertificate_(F)_compressed.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB-C.pdf | 6 Sep 2025 |
| Form 1File: Form -1-Punya Srushti Architect Certificate.pdf | 6 Sep 2025 |
| Form 2File: Form-2-Engineer's certificate.pdf | 6 Sep 2025 |
| Form 3File: Form-3-CACertificate_(f)_compressed (1).pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 4-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiBandC.pdf | 6 Sep 2025 |
| Form 1File: Form -1-Punya Srushti Architect Certificate_Q1202425.pdf | 6 Sep 2025 |
| Form 2File: Form -2-Engineer's certificate_Q1202425.pdf | 6 Sep 2025 |
| Form 3File: Form 3 - Punya Srushti_Q1202425_compressed.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_June2024.pdf | 6 Sep 2025 |
| Form 1File: Form -1-Punya Srushti Architect Certificate (F).pdf | 6 Sep 2025 |
| Form 2File: Form -2-Engineer's certificate (F).pdf | 6 Sep 2025 |
| Form 3File: Form 3_CERIFICATE_Tower BandC(F).pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiBandC.pdf | 6 Sep 2025 |
| Form 1File: Form -1-Punya Srushti Architect Certificate (F).pdf | 6 Sep 2025 |
| Form 2File: Form -2-Engineer's certificate (F).pdf | 6 Sep 2025 |
| Form 3File: Form -3 Srushti B&c_December 2024.pdf | 6 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 31122024-DISCLOSURE OF SOLD BOOKED INVENTORY_Srushti B_C.pdf | 6 Sep 2025 |
| Withdrawal Update Form 1File: Form -1-Punya Srushti Architect Certificate (F).pdf | 6 Sep 2025 |
| Withdrawal Update Form 2File: Form -2-Engineeru0027s certificate (F).pdf | 6 Sep 2025 |
| Withdrawal Update Form 3File: PUNYA SHRUSHTI TOWER Bu0026C-Q1 RERA (1).pdf | 6 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Srushti BnC_Dec2024.pdf | 23 Apr 2025 |
| Building plan approvalFile: 31122024-DISCLOSURE OF SOLD BOOKED INVENTORY_Srushti B_C.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate (F).pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate (F).pdf | 16 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 31122024-DISCLOSURE OF SOLD BOOKED INVENTORY_Srushti B_C.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate (F).pdf | 17 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CERIFICATE_Tower BandC(F).pdf | 17 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate (F).pdf | 17 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiBandC.pdf | 17 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate_Q1202425.pdf | 18 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate_Q1202425.pdf | 18 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_June2024.pdf | 18 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Punya Srushti_Q1202425_compressed.pdf | 18 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate.pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate.pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate.pdf | 24 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate.pdf | 24 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate.pdf | 24 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer's certificate.pdf | 24 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Srushti_B_C(F)_compressed.pdf | 24 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3, CACertificate_(F)_compressed.pdf | 24 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-CACertificate_(f)_compressed (1).pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Punya Srushti Architect Certificate.pdf | 15 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Punya Srushti Architect Certificate.pdf | 15 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate.pdf | 15 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer's certificate.pdf | 15 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer's certificate.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Quality Assurance Certificate 202324.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 1-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB-C.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 2-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB-C.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 3-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB-C.pdf | 15 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 4-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiBandC.pdf | 15 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3, CACertificate_(F)_compressed.pdf | 15 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3, CACertificate_(f)_compressed.pdf | 15 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Srushti_B_C.pdf | 15 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Srushti_B_C.pdf | 15 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 123 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PunyaSrushti Tower B and C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pratibhanagar880+ in Kolhapur
Filed coordinates, straight-line distance. 63 registered projects within 2 km.
Eminent Square
SHRI SIDDHIVINAYAK ASSOCIATES
NIMBALKAR HERITAGE
MORBALE INFRA PROJECT PRIVATE LIMITED
PUNYA ARPIT
RAMSINA CONSTRUCTIONS PVT LTD
HARMONY MADHUBAN
M/S HARMONY INFRA
RAJARAM HEIGHTS
SUNRISE INFRA PROJECTS
CAPITAL
Marudhar Builders
See every Kolhapur project, with the district possession charts
Builder: Punyasrushti Sahakari Gruhnirman Sanstha Maryadit
Punyasrushti Sahakari Gruhnirman Sanstha Maryadit has 3 registrations on MahaRERA, including Punya Srushti Co-Op. Housing Society Ltd and PunyaSrushti Tower B and C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if PunyaSrushti Tower B and C is delayed beyond 30 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PunyaSrushti Tower B and C?
The registered promoter entity is Punyasrushti Sahakari Gruhnirman Sanstha Maryadit, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PunyaSrushti Tower B and C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PunyaSrushti Tower B and C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PunyaSrushti Tower B and C?
The professionals named in the filing: Architect: Amar Tendulkar Architect; Engineer: Shekhar Ravalkar Associates; Chartered Accountant: V T & Associates; Chartered Accountant: SAW & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PunyaSrushti Tower B and C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback