Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 55%
100 of 103Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

PunyaSrushti Tower B and C is a Residential / Group Housing project by Punyasrushti Sahakari Gruhnirman Sanstha Maryadit in Kolhapur, Maharashtra, registered with MahaRERA as P53000051732 on 27 Jun 2023. Possession is promised by 30 Nov 2026. 3 of the 103 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NamePunyaSrushti Tower B and C
  • TypeResidential / Group Housing
  • Location
    • E Ward
    • Pratibhanagar
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416008
  • Pincode416008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000051732
  • ReraGenie IDRG-MH-93263

Builder

  • NamePunyasrushti Sahakari Gruhnirman Sanstha Maryadit
  • Entity typeSociety
  • ChairpersonSatyajeet Balaso Bodake
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2023PromisedNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion30 Nov 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed123 files

Current status

3%3 of 103 units booked
13.8%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Punya Srushti Tower BNA181468068
Punya Srushti Tower CNA171235035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 55%.

Punya Srushti Tower B57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Punya Srushti Tower C47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
Punya Srushti Tower B11
Punya Srushti Tower C11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,265 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Sep 2025

Approvals and building plan

Sanctioning authorityKOLHAPUR MUNICIPAL CORPORATION KOLHAPUR
Permissible FSI15181.64
Proposed, not sanctioned15,182 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJRAMPURI KOLHAPUR
Estimated costRs 50.04 cr
Cost incurredRs 6.89 cr
Work done13.78%
BuildingWingEstimatedIncurred
Punya Srushti Tower BNARs 24.61 crRs 3.45 cr
Punya Srushti Tower CNARs 24.61 crRs 3.45 cr
-NARs 81.87 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmar Tendulkar Architect
EngineerShekhar Ravalkar Associates
Chartered AccountantV T & Associates
Chartered AccountantSAW & ASSOCIATES
PartnerRole in project
Punyasrushti Sahakari Gruhnirman Sanstha Maryadit-

Litigation declared1

CaseCourtStatus
WP/2279/2013/2013High Court of BombayDisposed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf14 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf14 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3_SrushtiBnC_Q4202526_(F)_compressed.pdf14 May 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf13 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf13 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 (F)_Q3_202526_compressed.pdf13 May 2026
Withdrawal Update Form 1File: Withdrawal Application Form1_Sept2025.pdf16 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2_Sept2025.pdf16 Jan 2026
Withdrawal Update Form 3File: Withdrawal Application Form3_Sept2025.pdf16 Jan 2026
Form 1File: Form -1-Punya Srushti Architect Certificate (F).pdf6 Sep 2025
Form 2File: Form -2-Engineer's certificate (F).pdf6 Sep 2025
Form 3File: Form -3 -PUNYA SHRUSHTI TOWER B&C Q4 RERA.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: 31032025-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB&C.pdf6 Sep 2025
Form 1File: Form -1-Punya Srushti Architect Certificate.pdf6 Sep 2025
Form 2File: Form -2-Engineer's certificate.pdf6 Sep 2025
Form 3File: Form 3_Tower BandC_Compress.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB&C.pdf6 Sep 2025
Form 1File: Form -1-Punya Srushti Architect Certificate.pdf6 Sep 2025
Form 2File: Form -2-Engineer's certificate.pdf6 Sep 2025
Form 3File: Form 3_Srushti_B_C(F)_compressed.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB&C - Copy.pdf6 Sep 2025
Form 1File: Form -1-Punya Srushti Architect Certificate.pdf6 Sep 2025
Form 2File: Form -2-Engineer's certificate.pdf6 Sep 2025
Form 3File: Form-3, CACertificate_(F)_compressed.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB-C.pdf6 Sep 2025
Form 1File: Form -1-Punya Srushti Architect Certificate.pdf6 Sep 2025
Form 2File: Form-2-Engineer's certificate.pdf6 Sep 2025
Form 3File: Form-3-CACertificate_(f)_compressed (1).pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: 4-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiBandC.pdf6 Sep 2025
Form 1File: Form -1-Punya Srushti Architect Certificate_Q1202425.pdf6 Sep 2025
Form 2File: Form -2-Engineer's certificate_Q1202425.pdf6 Sep 2025
Form 3File: Form 3 - Punya Srushti_Q1202425_compressed.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_June2024.pdf6 Sep 2025
Form 1File: Form -1-Punya Srushti Architect Certificate (F).pdf6 Sep 2025
Form 2File: Form -2-Engineer's certificate (F).pdf6 Sep 2025
Form 3File: Form 3_CERIFICATE_Tower BandC(F).pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiBandC.pdf6 Sep 2025
Form 1File: Form -1-Punya Srushti Architect Certificate (F).pdf6 Sep 2025
Form 2File: Form -2-Engineer's certificate (F).pdf6 Sep 2025
Form 3File: Form -3 Srushti B&c_December 2024.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: 31122024-DISCLOSURE OF SOLD BOOKED INVENTORY_Srushti B_C.pdf6 Sep 2025
Withdrawal Update Form 1File: Form -1-Punya Srushti Architect Certificate (F).pdf6 Sep 2025
Withdrawal Update Form 2File: Form -2-Engineeru0027s certificate (F).pdf6 Sep 2025
Withdrawal Update Form 3File: PUNYA SHRUSHTI TOWER Bu0026C-Q1 RERA (1).pdf6 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Srushti BnC_Dec2024.pdf23 Apr 2025
Building plan approvalFile: 31122024-DISCLOSURE OF SOLD BOOKED INVENTORY_Srushti B_C.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate (F).pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate (F).pdf16 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 31122024-DISCLOSURE OF SOLD BOOKED INVENTORY_Srushti B_C.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate (F).pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CERIFICATE_Tower BandC(F).pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate (F).pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiBandC.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate_Q1202425.pdf18 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate_Q1202425.pdf18 Aug 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_June2024.pdf18 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Punya Srushti_Q1202425_compressed.pdf18 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate.pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate.pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate.pdf24 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate.pdf24 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate.pdf24 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer's certificate.pdf24 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Srushti_B_C(F)_compressed.pdf24 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3, CACertificate_(F)_compressed.pdf24 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-CACertificate_(f)_compressed (1).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Punya Srushti Architect Certificate.pdf15 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Punya Srushti Architect Certificate.pdf15 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate.pdf15 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer's certificate.pdf15 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineer's certificate.pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Quality Assurance Certificate 202324.pdf15 Jun 2024
Disclosure of sold/ booked inventoryFile: 1-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB-C.pdf15 Jun 2024
Disclosure of sold/ booked inventoryFile: 2-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB-C.pdf15 Jun 2024
Disclosure of sold/ booked inventoryFile: 3-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiB-C.pdf15 Jun 2024
Disclosure of sold/ booked inventoryFile: 4-DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiBandC.pdf15 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3, CACertificate_(F)_compressed.pdf15 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3, CACertificate_(f)_compressed.pdf15 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Srushti_B_C.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Srushti_B_C.pdf15 Mar 2024

How this compares with Kolhapur

3%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep PunyaSrushti Tower B and C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pratibhanagar880+ in Kolhapur

2 kmPunyaSrushti Tower B andCompleted 22Lapsed / revoked 9Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: Punyasrushti Sahakari Gruhnirman Sanstha Maryadit

Punyasrushti Sahakari Gruhnirman Sanstha Maryadit has 3 registrations on MahaRERA, including Punya Srushti Co-Op. Housing Society Ltd and PunyaSrushti Tower B and C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if PunyaSrushti Tower B and C is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PunyaSrushti Tower B and C?

The registered promoter entity is Punyasrushti Sahakari Gruhnirman Sanstha Maryadit, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PunyaSrushti Tower B and C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PunyaSrushti Tower B and C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PunyaSrushti Tower B and C?

The professionals named in the filing: Architect: Amar Tendulkar Architect; Engineer: Shekhar Ravalkar Associates; Chartered Accountant: V T & Associates; Chartered Accountant: SAW & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PunyaSrushti Tower B and C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PunyaSrushti Tower B and C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PunyaSrushti Tower B and C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.