Home / Browse projects / Kolhapur, Maharashtra / OM SAI PARADISE

Completed No litigation declared Others project

OM SAI PARADISE

By SHREE BALAJI BUILDERS AND DEVELOPERS

RG-MH-80446 · RERA P53000055702 · Last updated on MahaRERA portal: 14 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
May 2027Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
61 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

OM SAI PARADISE is a Others project by SHREE BALAJI BUILDERS AND DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000055702 on 15 Apr 2024. The registration is recorded completed; possession was promised by 1 May 2027. 10 of the 71 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameOM SAI PARADISE
  • TypeOthers
  • Location
    • BHAGAT SINGH ROAD
    • NA
    • Gadhinglaj
    • Kolhapur
    • 416502
  • Pincode416502
  • RERA no.P53000055702
  • ReraGenie IDRG-MH-80446

Builder

  • NameSHREE BALAJI BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersSATISH NANASAHEB PATADE, TANUJA SATISH PATADE, NARESH AGRAWAL, HIMANSHU AGRAWAL
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2024PromisedMay 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Apr 2024
  • Promised completion1 May 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Current status

14%10 of 71 units booked
69.6%Work done, per cost certificate

Figures as on 14 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OM SAI PARADISE A WINGNA76181836
OM SAI PARADISE B WINGNA76181735

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

OM SAI PARADISE A WING64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
OM SAI PARADISE B WING64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed130

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots130
Closed/Covered130
BuildingClosed/CoveredTotal
OM SAI PARADISE A WING6565
OM SAI PARADISE B WING6565

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,180 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Oct 2025
LandownerVillageDistrict
SAMBHAJI BABU KILLEDARGadhinglajKolhapur
SUBHASH SATAGOUDA PATILGadhinglajKolhapur

Approvals and building plan

Sanctioning authoritygadhinglaj municipal council
Permissible FSI3233.7
Proposed, not sanctioned3,234 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGADHINGLAJ DASHRACOWK DASHRACOWK MAIN ROAD, GADHINGLAJ MAHARASHTRA
Estimated costRs 14.50 cr
Cost incurredRs 10.10 cr
Work done69.64%
BuildingWingEstimatedIncurred
OM SAI PARADISE A WINGNARs 7.25 crRs 5.05 cr
OM SAI PARADISE B WINGNARs 7.25 crRs 5.05 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR NISHIKANT GORULE
EngineerMANOJ CHOUGALE
Chartered AccountantCA SHRIPAL MADANLALJI JAIN
Chartered AccountantMALIKARJUN
PartnerRole in project
SHREE BALAJI BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_DEC 25_OM SAI PARADISE.pdf14 Jan 2026
Withdrawal Update Form 1File: FORM 1_DEC 25_OM SAI PARADISE.pdf14 Jan 2026
Withdrawal Update Form 2File: FORM 2_DEC 25_ OM SAI PARADISE.pdf14 Jan 2026
Withdrawal Update Form 2File: FORM 2_DEC 25_ OM SAI PARADISE.pdf14 Jan 2026
Withdrawal Update Form 3File: FORM 3_ DEC 25_ OM SAI PARADISE.pdf14 Jan 2026
Withdrawal Update Form 3File: FORM 3_ DEC 25_ OM SAI PARADISE.pdf14 Jan 2026
Occupational CertificateFile: FULL OC.pdf14 Jan 2026
Form 1File: FORM 1_ SEP 25_ OM SAI PARADISE.pdf13 Oct 2025
Form 2File: FORM 2_SEP 25_ OM SAI PARADISE.pdf13 Oct 2025
Form 3File: FORM 3_ SEP 25_ OM SAI PARADISE.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 25_ OM SAI PARADISE.pdf13 Oct 2025
Form 1File: FORM 1_ JUNE 25_ OM SAI PARADISE.pdf19 Jul 2025
Form 2File: FORM 2_ JUNE 25_ OM SAI PARADISE (1).pdf19 Jul 2025
Form 3File: FORM 3_ JUNE 25_ OM SAI PARADISE.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ OM SAI PARADISE.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A_ MARCH25.pdf19 Jul 2025
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 25.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ MARCH 25.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 25.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 25.pdf18 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: secured unsecured.pdf4 Feb 2025
Building plan approvalFile: Revised Plans.pdf22 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised Building Permission Shree Balaji- Certificate.pdf22 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised Plans.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1_SHREE BALAJI BUILDERS AND DEVELOPERS_OM SAI PARADISE_DECEMBER 2024.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3_SHREE BALAJI BUILDERS AND DEVELOPERS_OM SAI PARADISE_DECEMBER 2024.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2_SHREE BALAJI BUILDERS AND DEVELOPERS_OM SAI PARADISE_DECEMBER 2024.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_SHREE BALAJI BUILDERS AND DEVELOPERS_OM SAI PARADISE_DECEMBER 2024.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ SEP 24.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ SEP 24.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ SEP 24.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSLD_ SEP 24.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ JUNE 24.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ JUNE 24.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ JUNE 24.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ JUNE 24.pdf29 Jul 2024
Other - LegalFile: 1 Other - Legal.pdf26 Mar 2024
Other - LegalFile: PLAN.pdf26 Mar 2024
Other - TechnicalFile: PROJECT DECLARATION_on 100 RS STAMP PAPER AND NOTARY.pdf26 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Gmail - Comencement Certificate and Sactioned Plan.pdf13 Feb 2024
Details of encumbrances concerned to FinanceFile: ilovepdf_merged (1)-2.pdf21 Jan 2024
Details of encumbrances concerned to FinanceFile: 4 b Details of encumbrances concerned to Legal (1).pdf21 Jan 2024
Details of encumbrances concerned to LegalFile: ilovepdf_merged (1)-2.pdf21 Jan 2024
Details of encumbrances concerned to LegalFile: 4 b Details of encumbrances concerned to Legal (1).pdf21 Jan 2024
Declaration about Commencement CertificateFile: ilovepdf_merged (1)-3-4.pdf21 Jan 2024
CERSAI detailsFile: ilovepdf_merged (1)-5.pdf21 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 (2).pdf21 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (1)-6-9.pdf21 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ilovepdf_merged (1)-10.pdf21 Jan 2024
Deviation Report with respect to Allotment letterFile: ilovepdf_merged (1)-12-copy-0.pdf21 Jan 2024
Deviation Report with respect to model copy of AgreementFile: ilovepdf_merged (1)-12.pdf21 Jan 2024
Layout approvalFile: 5 Copy of Layout Approval (in case of layout) PRINT.pdf20 Jan 2024
Building plan approvalFile: 6 Building Plan Approval PRINT.pdf20 Jan 2024
PAN CardFile: 1 PAN CARD.pdf20 Jan 2024
Copy of the legal title reportFile: 2 Copy of the legal title report.pdf20 Jan 2024
Copy of Layout Approval (in case of layout)File: 5 Copy of Layout Approval (in case of layout) PRINT.pdf20 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval PRINT.pdf20 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificates NA Order for plotted development.pdf20 Jan 2024
Declaration in FORM BFile: 9 Declaration in FORM B.pdf20 Jan 2024
Proforma of Agreement for saleFile: 16 Proforma of Agreement for sale.pdf20 Jan 2024
Proforma of Allotment letterFile: 17 Proforma of Allotment letter.pdf20 Jan 2024

How this compares with Kolhapur

14%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep OM SAI PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NA880+ in Kolhapur

Builder: SHREE BALAJI BUILDERS AND DEVELOPERS

SHREE BALAJI BUILDERS AND DEVELOPERS has 7 registrations on MahaRERA, including GOKULDHAM APPARTMENT and VENKATESH KUMKUM BLDG NO 10. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if OM SAI PARADISE is delayed beyond 1 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM SAI PARADISE?

The registered promoter entity is SHREE BALAJI BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM SAI PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM SAI PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM SAI PARADISE?

The professionals named in the filing: Architect: AR NISHIKANT GORULE; Engineer: MANOJ CHOUGALE; Chartered Accountant: CA SHRIPAL MADANLALJI JAIN; Chartered Accountant: MALIKARJUN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM SAI PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM SAI PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM SAI PARADISE to a free account