Home / Browse projects / Kolhapur, Maharashtra / PUNYA ARPIT
PUNYA ARPIT
By RAMSINA CONSTRUCTIONS PVT LTD
RG-MH-44352 · RERA P53000034647 · Last updated on MahaRERA portal: 7 Oct 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 28 months past the filed date
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PUNYA ARPIT is a Others project by RAMSINA CONSTRUCTIONS PVT LTD in Kolhapur, Maharashtra, registered with MahaRERA as P53000034647 on 20 Apr 2022. Possession was promised by 30 Jun 2024 and is now 28 months past that date. The completion date has moved by 6 months from the original filing. 61 of the 77 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NamePUNYA ARPIT
- TypeOthers
- Location
- RAJARAM ROAD
- TAKALA
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416008
- Pincode416008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000034647
- ReraGenie IDRG-MH-44352
Builder
- NameRAMSINA CONSTRUCTIONS PVT LTD
- Entity typeCompany
- CINU45200PN2009PTC133526
- GSTIN27AAECR5443B1ZM
- DirectorsSACHIN ABHAYKUMAR OSWAL, SANJEEVANI ABHAYKUMAR OSWAL, KAVITA LAKMICHAND NOTANI
- Other registrations3 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on20 Apr 2022
- Promised completion30 Jun 2024
- Revised completionRevised to 30 Jun 2024 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed59 files
Current status
Figures as on 7 Oct 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PUNYA ARPIT | NA | 11 | 0 | 77 | 0 | 77 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
PUNYA ARPIT: 76% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PUNYA ARPIT | NA | Rs 18.21 cr | Rs 12.27 cr |
| - | NA | Rs 1.00 cr | Rs 46.11 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR SUSHANT WARAPE |
| Architect | Sushant Warape |
| Engineer | SHEKHAR S REVALKAR |
| Engineer | Shekhar Sharad Revalkar |
| Chartered Accountant | NIRAJ NAVANDHAR |
| Chartered Accountant | SAW & ASSOCIATES |
| Chartered Accountant | Niraj Vijay Nawandhar |
| Chartered Accountant | Siddharth Pravin Shaha |
| Partner | Role in project |
|---|---|
| RAMSINA CONSTRUCTIONS PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDate: 20.12.2023 To, Maharashtra Real Estate Regulatory Authority, Mumbai. I, Vikesh Abhaykumar Oswal, Director of Ramsina Constructions Pvt Ltd, Promoter/Developer of the Proposed Redevelopment Project "Punya Arpit” Residential Building, located at, C.S.No.1184, E ward, Takala, Kolhapur. MahaRERA Registration No. REA53000106410. I/We hereby sought extension for following reasons - 1. Concerned Project’s Proposed Date of Completion will exhausted on 31/12/2023. 2. However, the Concern Project had required more time than anticipated for excavation due to Hard subsurface strata i.e. Basalt Rock,
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Oct 2024
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Punya Arpit OC 08-09-2024_240909_124344.pdf | 7 Oct 2024 |
| Other - TechnicalFile: Form 4-Architect’s Certificate on Completion of Project.pdf | 7 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Punya Arpit OC 08-09-2024_240909_124344.pdf | 7 Oct 2024 |
| Other - TechnicalFile: Form 4-Architect’s Certificate on Completion of Project.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate_June2024.pdf | 18 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate_Arpit_June2024.pdf | 18 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Punya Arpit_June2024.pdf | 18 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arpit Form 1 - Architect Certificate.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate_Arpit.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arpit_Form No 3.pdf | 30 May 2024 |
| Declaration in FORM BFile: Form B_Arpit_Extention.pdf | 6 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Quality Assurance_Arpit.pdf | 6 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_Aprit.pdf | 6 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5_March2023_Arpit.pdf | 6 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5_March2023_Arpit.pdf | 4 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other organisations.pdf | 15 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate_Arpit.pdf | 12 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate_Arpit.pdf | 12 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate_Arpit.pdf | 12 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No-March2023_Arpit.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arpit_Architect_Form 1.pdf | 25 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arpit_Engineers_Form 2.pdf | 25 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arpit_CA Form_3_compressed.pdf | 25 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA_Arpit_Form5_202122_compressed.pdf | 14 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form-1_compressed.pdf | 31 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form-2_compressed.pdf | 31 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form-3_compressed.pdf | 31 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Declaration_Legal_Arpit.pdf | 30 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Declaration_Legal_Arpit.pdf | 30 Dec 2022 |
| Proforma of Agreement for saleFile: Agreement for Sale.pdf | 30 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration_Separate Bank_Arpit.pdf | 30 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report_AL_Arpit.pdf | 30 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report_Agreement_Arpit.pdf | 30 Dec 2022 |
| Building plan approvalFile: Building Plan Approval 2.pdf | 8 Apr 2022 |
| Building plan approvalFile: Building Plan Approval 3.pdf | 8 Apr 2022 |
| Building plan approvalFile: Building Plan Approval 4.pdf | 8 Apr 2022 |
| Building plan approvalFile: Building Plan Approval 5.pdf | 8 Apr 2022 |
| Layout approvalFile: Copy of Layout Approval.pdf | 8 Apr 2022 |
| Building plan approvalFile: Building Plan Approval 1.pdf | 8 Apr 2022 |
| PAN CardFile: PAN Card.pdf | 8 Apr 2022 |
| Copy of the legal title reportFile: Copy of the legal title report.pdf | 8 Apr 2022 |
| Copy of the legal title reportFile: COPY OF LEGAL TITLE REPORT 2.pdf | 8 Apr 2022 |
| Details of encumbrancesFile: Details of encumbrances.pdf | 8 Apr 2022 |
| Details of encumbrancesFile: details of encumbrances1.pdf | 8 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout Approval.pdf | 8 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval 1.pdf | 8 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval 2.pdf | 8 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval 3.pdf | 8 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval 4.pdf | 8 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval 5.pdf | 8 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf | 8 Apr 2022 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 8 Apr 2022 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 8 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 8 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Enginner Certificate (1).pdf | 8 Apr 2022 |
| CERSAI detailsFile: CERSAI details.pdf | 8 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 8 Apr 2022 |
| Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf | 8 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PUNYA ARPIT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TAKALA880+ in Kolhapur
Filed coordinates, straight-line distance. 147 registered projects within 2 km.
Eminent Square
SHRI SIDDHIVINAYAK ASSOCIATES
PunyaSrushti Tower B and C
Punyasrushti Sahakari Gruhnirman Sanstha M
NIMBALKAR HERITAGE
MORBALE INFRA PROJECT PRIVATE LIMITED
HARMONY MADHUBAN
M/S HARMONY INFRA
RAJARAM HEIGHTS
SUNRISE INFRA PROJECTS
CAPITAL
Marudhar Builders
See every Kolhapur project, with the district possession charts
Builder: RAMSINA CONSTRUCTIONS PVT LTD
Ramsina Constructions Pvt. Ltd has 4 registrations on MahaRERA, including TUSTI and PUNYA ARPIT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What does it mean that PUNYA ARPIT shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PUNYA ARPIT is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PUNYA ARPIT?
The registered promoter entity is RAMSINA CONSTRUCTIONS PVT LTD, a company as per the filing. Its CIN U45200PN2009PTC133526 and GSTIN 27AAECR5443B1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PUNYA ARPIT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PUNYA ARPIT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PUNYA ARPIT?
The professionals named in the filing: Architect: AR SUSHANT WARAPE; Architect: Sushant Warape; Engineer: SHEKHAR S REVALKAR; Engineer: Shekhar Sharad Revalkar; Chartered Accountant: NIRAJ NAVANDHAR; Chartered Accountant: SAW & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PUNYA ARPIT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback