Completed No litigation declared Residential / Group Housing project

ROYAL PLANET

By SURAJ ESTATE DEVELOPERS

RG-MH-36216 · RERA P53000048148 · Last updated on MahaRERA portal: 29 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
31 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
42 of 108Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

ROYAL PLANET is a Residential / Group Housing project by SURAJ ESTATE DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000048148 on 12 Dec 2022. The registration is recorded completed; possession was promised by 31 Dec 2027. 66 of the 108 units on this registration are recorded sold or booked, and 31 of 33 construction stages are filed complete.

At a glance

Project

  • NameROYAL PLANET
  • TypeResidential / Group Housing
  • Location
    • old Pune Banglore Road
    • E ward Opp Rajesh Motors
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416001
  • Pincode416001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000048148
  • ReraGenie IDRG-MH-36216

Builder

  • NameSURAJ ESTATE DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAJFS8992AIZS
  • PartnersChetan Hasmukhbhai Vasa, Sunit Chinubhai Parikh, Anand Shankarrao Mane, Divyaraj Hasmukhbhai Vasa
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredDec 2022PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Dec 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed121 files

Current status

61%66 of 108 units booked
73.6%Work done, per cost certificate

Figures as on 29 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA9849049
Building BNA10011011
Buildind CNA7048048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

31 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Building A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Buildind C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed530

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots530
Closed/Covered105
Open Space425
BuildingClosed/CoveredOpen SpaceTotal
Building A45203248
Building B2480104
Buildind C36142178

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,585 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Sep 2024
LandownerVillageDistrict
M/s Shree Saraswati Concrete worksGokul Shirgaon (CT)Kolhapur
M/s Hindustan ConstructionsKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI11473.46
Proposed, not sanctioned11,473 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShahupuri Kolhapur
Estimated costRs 81.00 cr
Cost incurredRs 59.60 cr
Work done73.58%
BuildingWingEstimatedIncurred
Building ANARs 26.00 crRs 19.64 cr
Building BNARs 26.00 crRs 19.64 cr
Buildind CNARs 26.00 crRs 19.64 cr
-NARs 3.00 crRs 69.03 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrism Design Studio
EngineerNikhil Rambhia Rambhia
EngineerPradyumna Ananda Gurav
EngineerNiraj Mohan Kognole
EngineerBhimrao V More
Chartered AccountantGourav Phadnis and Company
Chartered AccountantDileep Phadnis and Company
PartnerRole in project
SURAJ ESTATE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3_compressed (23).pdf29 Jan 2026
Occupational CertificateFile: Full Completion Certificate.pdf29 Jan 2026
Occupational CertificateFile: Part Occupancy Certificate.pdf29 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf20 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf20 Nov 2025
Withdrawal Update Form 3File: Form 3_compressed (19).pdf20 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf20 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A.pdf20 Nov 2025
Form 2A (FY 2022-2023)File: Form 2A 2023.pdf20 Nov 2025
Form 2A (FY 2025-2026)File: Form 2A 2025.pdf20 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3_compressed (14).pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf30 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold .pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold .pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold .pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold .pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold .pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold .pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Royal Planet Form 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Royal Planet Form 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Royal Planet Form 5.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Form 5 Royal Planet.pdf28 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold .pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold inventary.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 2A.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory sep.pdf11 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 - 2022-2023.pdf29 Sep 2023
Building plan approvalFile: Plan 5.pdf28 Sep 2023
Building plan approvalFile: Plan 1.pdf28 Sep 2023
Building plan approvalFile: Plan 2.pdf28 Sep 2023
Building plan approvalFile: Plan 3.pdf28 Sep 2023
Building plan approvalFile: Plan 4.pdf28 Sep 2023
Building plan approvalFile: Plan 6.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf28 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf28 Sep 2023

How this compares with Kolhapur

61%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep ROYAL PLANET on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near E ward Opp Rajesh Motors880+ in Kolhapur

2 kmROYAL PLANETCompleted 47Lapsed / revoked 27Other 61Dot size: filed unitsN

Filed coordinates, straight-line distance. 135 registered projects within 2 km.

Builder: SURAJ ESTATE DEVELOPERS

SURAJ ESTATE DEVELOPERS has 3 registrations on MahaRERA, including Royal Dreamland and ROYAL 09 TOURIST BUSINESS HUB. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if ROYAL PLANET is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROYAL PLANET?

The registered promoter entity is SURAJ ESTATE DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAJFS8992AIZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROYAL PLANET?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROYAL PLANET?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROYAL PLANET?

The professionals named in the filing: Architect: Prism Design Studio; Engineer: Nikhil Rambhia Rambhia; Engineer: Pradyumna Ananda Gurav; Engineer: Niraj Mohan Kognole; Engineer: Bhimrao V More; Chartered Accountant: Gourav Phadnis and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROYAL PLANET?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROYAL PLANET. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROYAL PLANET to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.