ReraGenieLog inGet a buyer report

Home / Browse projects / Kolhapur, Maharashtra / Eminent Square

Registered No litigation declared Others project

Eminent Square

By SHRI SIDDHIVINAYAK ASSOCIATES

RG-MH-57895 · RERA P53000052046 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 3.00 crore secured on the land, in favour of Shri Siddhivinayak Associates
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
84 of 113Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Eminent Square is a Others project by SHRI SIDDHIVINAYAK ASSOCIATES in Kolhapur, Maharashtra, registered with MahaRERA as P53000052046 on 19 Jul 2023. Possession is promised by 31 Dec 2028. 29 of the 113 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameEminent Square
  • TypeOthers
  • Location
    • E ward CIBER Chowk
    • Ring Road
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416008
  • Pincode416008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000052046
  • ReraGenie IDRG-MH-57895

Builder

  • NameSHRI SIDDHIVINAYAK ASSOCIATES
  • Entity typePartnership
  • PartnersAnant Vilasrao Murugude, Savita Amar Upadhye, Deepali Nilesh Patil

Key dates

this monthRegisteredJul 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Jul 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Current status

26%29 of 113 units booked
50.9%Work done, per cost certificate

Figures as on 12 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Eminent SquareNA10104271113

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Eminent Square: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed155

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots155
Closed/Covered155

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofShri Siddhivinayak Associates
Secured amountRs 3.00 crore
CERSAI search filedYes
Declared on7 Aug 2025
LandownerVillageDistrict
Shri Mukund Namdev DhavanKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI10641.53
Proposed, not sanctioned10,642 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch9 th lane Rajarampuri Kolhapur
Estimated costRs 24.26 cr
Cost incurredRs 12.34 cr
Work done50.86%
BuildingWingEstimatedIncurred
Eminent SquareNARs 23.26 crRs 12.34 cr
-NARs 1.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA Square Amar Bhavnendra Upadhye
EngineerDigvijay Nilesh Patil
Chartered AccountantNidhi S Kumbhar
Chartered AccountantSantosh Tase
PartnerRole in project
SHRI SIDDHIVINAYAK ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf12 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf12 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf12 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf12 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf4 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 -2024-2025.pdf4 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf4 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf4 Dec 2025
Withdrawal Update Form 3File: Form 3.pdf4 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf7 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf7 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf7 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf21 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Eminent Square.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf21 Oct 2024
Details of encumbrances concerned to FinanceFile: Siddhivinayak Finance.pdf7 Oct 2024
Details of encumbrances concerned to LegalFile: Siddhivinayak Finance.pdf7 Oct 2024
Building plan approvalFile: Sanctioned Plans Final-1-4_compressed.pdf13 Aug 2024
Building plan approvalFile: Sanctioned Plans Final-5-9_compressed.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans Final-1-4_compressed.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans Final-5-9_compressed.pdf13 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf13 Aug 2024
Building plan approvalFile: Sanctioned Plan_compressed (1).pdf22 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan_compressed (1).pdf22 Jul 2024
Declaration about Commencement CertificateFile: Commencement Certificate.pdf22 Jul 2024
Declaration about Commencement CertificateFile: Format D.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (24).pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold booked inventory.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf17 Oct 2023
Declaration in FORM BFile: Form B NewPromoter.pdf24 Jun 2023
Declaration about Commencement CertificateFile: Format D.pdf23 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 25may.pdf25 May 2023
CERSAI detailsFile: Self Declaration.pdf24 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A-Murugude.pdf11 May 2023
Building plan approvalFile: Garden Final Plan-1.pdf19 Apr 2023
Building plan approvalFile: Garden Final Plan-2.pdf19 Apr 2023
Building plan approvalFile: Garden Final Plan-3.pdf19 Apr 2023
Building plan approvalFile: Garden Final Plan-4.pdf19 Apr 2023
Building plan approvalFile: Garden Final Plan-5.pdf19 Apr 2023
Building plan approvalFile: Garden Final Plan-6.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Garden Final Plan-1.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Garden Final Plan-2.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Garden Final Plan-3.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Garden Final Plan-4.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Garden Final Plan-5.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Garden Final Plan-6.pdf19 Apr 2023
CERSAI detailsFile: CERSAI_Search.pdf19 Apr 2023
Copy of the legal title reportFile: Search Report_0001.pdf17 Apr 2023
Copy of the legal title reportFile: Index 2.pdf17 Apr 2023
Proforma of Agreement for saleFile: Agreement Dhavan.pdf17 Apr 2023
Layout approvalFile: Layout.pdf11 Apr 2023
PAN CardFile: PAN.pdf11 Apr 2023

How this compares with Kolhapur

26%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep Eminent Square on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ring Road880+ in Kolhapur

2 kmEminent SquareCompleted 24Lapsed / revoked 12Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: SHRI SIDDHIVINAYAK ASSOCIATES

SHRI SIDDHIVINAYAK ASSOCIATES has 1 registration on MahaRERA, including Eminent Square. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if Eminent Square is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Eminent Square?

The registered promoter entity is SHRI SIDDHIVINAYAK ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Eminent Square?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Eminent Square?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Eminent Square?

The professionals named in the filing: Architect: A Square Amar Bhavnendra Upadhye; Engineer: Digvijay Nilesh Patil; Chartered Accountant: Nidhi S Kumbhar; Chartered Accountant: Santosh Tase. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Eminent Square?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Eminent Square. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Eminent Square to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.