New projects and RERA data in Aurangabad district, Maharashtra

1504 projects are registered in Aurangabad district: 41,246 units across them, 73 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

1504Projects covered
73Registered, last 12 months
41,246Units declared
33,459Units not yet booked
227Completion dates revised
6With declared litigation

Of the 1504 covered registrations, 227 have revised their promised completion date and 6 declare litigation. The median project here is 5% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Aurangabad projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 1,504 projects with a promised date, 562 are recorded delivered, 467 are still on the register and 475 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

050100150200today2017: 12 projects, delivered’172018: 61 projects, delivered2018: 5 projects, registration lapsed or cancelled’182019: 83 projects, delivered2019: 12 projects, registration lapsed or cancelled’192020: 31 projects, delivered2020: 16 projects, registration lapsed or cancelled’202021: 47 projects, delivered2021: 35 projects, registration lapsed or cancelled’212022: 75 projects, delivered2022: 73 projects, registration lapsed or cancelled’222023: 62 projects, delivered2023: 87 projects, registration lapsed or cancelled’232024: 79 projects, delivered2024: 71 projects, registration lapsed or cancelled’242025: 57 projects, delivered2025: 121 projects, registration lapsed or cancelled’252026: 38 projects, delivered2026: 80 projects, on the register2026: 54 projects, registration lapsed or cancelled’262027: 13 projects, delivered2027: 126 projects, on the register2027: 1 projects, registration lapsed or cancelled’272028: 3 projects, delivered2028: 111 projects, on the register’282029: 52 projects, on the register’292030: 1 projects, delivered2030: 64 projects, on the register’302031: 17 projects, on the register’312032: 15 projects, on the register’322033: 1 projects, on the register’332035: 1 projects, on the register’35

577 projects promise possession in 2026 or later. Facts as per filings on RERA website.

05,00010k15k20ktoday’172018: 173 flats, delivered (only 5 of 66 projects filed a flat count)’182019: 326 flats, delivered (only 4 of 95 projects filed a flat count)2019: 27 flats, registration lapsed or cancelled (only 4 of 95 projects filed a flat count)’192020: 908 flats, delivered (only 14 of 47 projects filed a flat count)2020: 152 flats, registration lapsed or cancelled (only 14 of 47 projects filed a flat count)’202021: 983 flats, delivered (only 19 of 82 projects filed a flat count)2021: 252 flats, registration lapsed or cancelled (only 19 of 82 projects filed a flat count)’212022: 1,283 flats, delivered (only 25 of 148 projects filed a flat count)2022: 618 flats, registration lapsed or cancelled (only 25 of 148 projects filed a flat count)’222023: 153 flats, delivered (only 16 of 149 projects filed a flat count)2023: 613 flats, registration lapsed or cancelled (only 16 of 149 projects filed a flat count)’232024: 479 flats, delivered (only 22 of 150 projects filed a flat count)2024: 567 flats, registration lapsed or cancelled (only 22 of 150 projects filed a flat count)’242025: 260 flats, delivered (only 36 of 178 projects filed a flat count)2025: 855 flats, registration lapsed or cancelled (only 36 of 178 projects filed a flat count)’252026: 887 flats, delivered (only 72 of 172 projects filed a flat count)2026: 2,316 flats, on the register (only 72 of 172 projects filed a flat count)2026: 894 flats, registration lapsed or cancelled (only 72 of 172 projects filed a flat count)’262027: 168 flats, delivered (only 67 of 140 projects filed a flat count)2027: 3,953 flats, on the register (only 67 of 140 projects filed a flat count)’272028: 142 flats, delivered2028: 4,329 flats, on the register’282029: 3,260 flats, on the register’292030: 19 flats, delivered2030: 15,162 flats, on the register’302031: 1,164 flats, on the register’312032: 803 flats, on the register’322033: 116 flats, on the register’332035: 384 flats, on the register’35

33,597 flats are promised in 2026 or later, across the 56% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Aurangabad possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 226 of 1,504 projects (15%) have moved at least once; the median move is 24 months and the longest is 120 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

050100150200Originally due 2017: 12 projects kept the original date, 86% of the yearOriginally due 2017: 2 projects moved by 2 years or more, 14% of the year’17Originally due 2018: 66 projects kept the original date, 75% of the yearOriginally due 2018: 11 projects moved by under 2 years, 12% of the yearOriginally due 2018: 11 projects moved by 2 years or more, 12% of the year’18Originally due 2019: 86 projects kept the original date, 73% of the yearOriginally due 2019: 6 projects moved by under 2 years, 5% of the yearOriginally due 2019: 26 projects moved by 2 years or more, 22% of the year’19Originally due 2020: 41 projects kept the original date, 80% of the yearOriginally due 2020: 3 projects moved by under 2 years, 6% of the yearOriginally due 2020: 7 projects moved by 2 years or more, 14% of the year’20Originally due 2021: 68 projects kept the original date, 78% of the yearOriginally due 2021: 8 projects moved by under 2 years, 9% of the yearOriginally due 2021: 11 projects moved by 2 years or more, 13% of the year’21Originally due 2022: 124 projects kept the original date, 87% of the yearOriginally due 2022: 8 projects moved by under 2 years, 6% of the yearOriginally due 2022: 11 projects moved by 2 years or more, 8% of the year’22Originally due 2023: 132 projects kept the original date, 82% of the yearOriginally due 2023: 15 projects moved by under 2 years, 9% of the yearOriginally due 2023: 14 projects moved by 2 years or more, 9% of the year’23Originally due 2024: 130 projects kept the original date, 82% of the yearOriginally due 2024: 14 projects moved by under 2 years, 9% of the yearOriginally due 2024: 15 projects moved by 2 years or more, 9% of the year’24Originally due 2025: 147 projects kept the original date, 78% of the yearOriginally due 2025: 15 projects moved by under 2 years, 8% of the yearOriginally due 2025: 26 projects moved by 2 years or more, 14% of the year’25Originally due 2026: 139 projects kept the original date, 90% of the yearOriginally due 2026: 10 projects moved by under 2 years, 6% of the yearOriginally due 2026: 5 projects moved by 2 years or more, 3% of the year’26Originally due 2027: 106 projects kept the original date, 98% of the yearOriginally due 2027: 2 projects moved by under 2 years, 2% of the year’27Originally due 2028: 102 projects kept the original date, 97% of the yearOriginally due 2028: 3 projects moved by under 2 years, 3% of the year’28Originally due 2029: 43 projects kept the original date, 100% of the year’29Originally due 2030: 53 projects kept the original date, 96% of the yearOriginally due 2030: 2 projects moved by under 2 years, 4% of the year’30Originally due 2031: 15 projects kept the original date, 94% of the yearOriginally due 2031: 1 projects moved by under 2 years, 6% of the year’31Originally due 2032: 13 projects kept the original date, 100% of the year’32Originally due 2033: 1 projects kept the original date, 100% of the year’33

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

05,00010k15k20k’17Originally due 2018: 173 flats kept the original date, 75% of the year (only 6 of 88 projects filed a flat count)Originally due 2018: 99 flats moved by 2 years or more, 12% of the year (only 6 of 88 projects filed a flat count)’18Originally due 2019: 353 flats kept the original date, 73% of the year (only 4 of 118 projects filed a flat count)’19Originally due 2020: 1,060 flats kept the original date, 80% of the year (only 16 of 51 projects filed a flat count)Originally due 2020: 121 flats moved by 2 years or more, 14% of the year (only 16 of 51 projects filed a flat count)’20Originally due 2021: 1,235 flats kept the original date, 78% of the year (only 24 of 87 projects filed a flat count)Originally due 2021: 314 flats moved by 2 years or more, 13% of the year (only 24 of 87 projects filed a flat count)’21Originally due 2022: 1,901 flats kept the original date, 87% of the year (only 30 of 143 projects filed a flat count)Originally due 2022: 228 flats moved by 2 years or more, 8% of the year (only 30 of 143 projects filed a flat count)’22Originally due 2023: 766 flats kept the original date, 82% of the year (only 24 of 161 projects filed a flat count)Originally due 2023: 237 flats moved by under 2 years, 9% of the year (only 24 of 161 projects filed a flat count)Originally due 2023: 1,049 flats moved by 2 years or more, 9% of the year (only 24 of 161 projects filed a flat count)’23Originally due 2024: 710 flats kept the original date, 82% of the year (only 40 of 159 projects filed a flat count)Originally due 2024: 386 flats moved by under 2 years, 9% of the year (only 40 of 159 projects filed a flat count)Originally due 2024: 1,367 flats moved by 2 years or more, 9% of the year (only 40 of 159 projects filed a flat count)’24Originally due 2025: 861 flats kept the original date, 78% of the year (only 65 of 188 projects filed a flat count)Originally due 2025: 796 flats moved by under 2 years, 8% of the year (only 65 of 188 projects filed a flat count)Originally due 2025: 12,002 flats moved by 2 years or more, 14% of the year (only 65 of 188 projects filed a flat count)’25Originally due 2026: 2,258 flats kept the original date, 90% of the year (only 59 of 154 projects filed a flat count)Originally due 2026: 594 flats moved by under 2 years, 6% of the year (only 59 of 154 projects filed a flat count)Originally due 2026: 164 flats moved by 2 years or more, 3% of the year (only 59 of 154 projects filed a flat count)’26Originally due 2027: 2,051 flats kept the original date, 98% of the year (only 40 of 108 projects filed a flat count)Originally due 2027: 21 flats moved by under 2 years, 2% of the year (only 40 of 108 projects filed a flat count)’27Originally due 2028: 3,597 flats kept the original date, 97% of the yearOriginally due 2028: 151 flats moved by under 2 years, 3% of the year’28Originally due 2029: 2,330 flats kept the original date, 100% of the year’29Originally due 2030: 4,481 flats kept the original date, 96% of the yearOriginally due 2030: 90 flats moved by under 2 years, 4% of the year’30Originally due 2031: 1,074 flats kept the original date, 94% of the yearOriginally due 2031: 51 flats moved by under 2 years, 6% of the year’31Originally due 2032: 610 flats kept the original date, 100% of the year’32Originally due 2033: 116 flats kept the original date, 100% of the year’33

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Aurangabad

Who sanctions building in Aurangabad

407 of the 1,504 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Aurangabad Municipal Corporation216
CIDCO49
80 other bodies142

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 1,504 registrations on this page answers this: on 854 the promoter is the only owner named; on 603 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 47 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Aurangabad: projects by taluka

1,504 of the 1,504 registrations on this page name their taluka.

TalukaProjectsShare
Aurangabad1,40994%
8 other talukas956%

Projects in Aurangabad

Showing 1 to 60 of 1,504 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
PMAY U Tisgaon 227 BMauje Tisgaon, 431102Unity Developers28960%24 Apr 2025Registered
PMAY U Sundarwadi 10Mauje Sunderwadi, 431007Aurathrone Infra21120%28 Mar 2025Registered
PMAY U Sundarwadi 9Mauje Sundarwadi, 431007Aurathrone Infra117615%29 Mar 2025Registered
PMAY U Tisgaon 225 BMauje Tisgaon, Chhatrapati Sambhajinagar, 431102Sahakar JV11126%17 Apr 2025Registered
Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati SambhajinagarOpposite of Khivsara Plotting Nakshtrawadi, 431002AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)11040%9 May 2025Registered
PMAY U Tisgaon 227 CMauje Tisgaon, 431102Unity Developers10005%29 Apr 2025Registered
PMAY U Tisgaon 225 AMauje Tisgaon, 431102Sahakar JV8640%7 Apr 2025Registered
PMAY U Tisgaon 227 AMauje Tisgaon, 431102Unity Developers7840%7 Apr 2025Registered
One World Phase IPratapNagar Shahnoorwadi, 431005SIMAR PRIDE VENTURES LLP70060%21 Mar 2023Registered
PMAY U PADEGAONMauje Padegaon, 431002M/s Laxmi JV6720%27 Mar 2025Registered
PMAY591 EWS housing in S.no 29 Mouje Ambewadi GangapurAmbewadi, 431109Samarath Multibiz JV5916%29 May 2021Registered
SARA NIWARAHARSUL, 431008Sara Infrastructures5040%1 Jul 2025Registered
Capital Trade CentreShahnoorwadi, 431001KRK Landmark LLP40812%3 Mar 2025Registered
AQ TOWNJALAN NAGAR, 431001AQ INFRASTRUCTURE PRIVATE LIMITED38417%7 Sep 2017Registered
Saffron LandmarksSatara, 431010Saffron Associates3569%22 Dec 2022Registered
KALYANI SAI VISHWASAWANGI, 431001RAJASHREE UDYOG34067%14 Aug 2017Registered
Rahul NagarNILAJGAON, 431105Ramgopal Muralidhar Dhoot, Kamlabhai Ramgopal Dhoot and Sunil Ramgopal Dhoot3300%12 Dec 2019Completed
SECTOR 41SHENDRA JAHANGIR, 431007MANISH RAMNIRANJAN AGRAWAL AND AMITABH CHATURBHUJ AGRAWAL3260%9 Mar 2020Completed
AURA SQUARE - KALYAN HEIGHTSKUMBEPHAL, 431007KALYAN HEIGHTS3080%8 Nov 2021Registered
AMRUT SAI PLAZA PH 2Silk Mill Colony, 431001Shree Amrut Sai Developer Pvt.Ltd30474%31 Aug 2017Completed
Khinvasara CityNakshatrawadi, 431002Ravindra Champalal Khinvasara3040%8 Jul 2021Registration lapsed
The Solitairee Phase IItkheda, 431005Dizzi Land Farms Private Limited29747%15 Oct 2024Registered
SARA SWARAJYA PHASE-IWADGAON KOLHATI NAGAR 1, 431136SARA INFRASTRUCTURES29321%20 Aug 2024Registered
BiZZ TowerPlot No. P 4/1, 431006INVESTZONE CONSTRUCTION ALLIANCE INDIA PRIVATE LIMITED29067%11 Oct 2021Completed
URBAN AMBITIONKARMAD, 431007MANISH RAMNIRANJAN AGRAWAL2630%18 Dec 2017Completed
Neo OrbitShahnoorwadi, 431005Piyush Infratech Pvt.Ltd.2570%7 Oct 2025Registered
Bhanudas Nagar Phase IIWaluj, 431133Ninad Narendra Khoche2520%24 Jan 2021Completed
Swapna srushti 2Nanakwadi, Chhatrapati Sambhajinagar, 431008NISHA AMRUT SAI BUILDERS2460%13 Oct 2026Registered
SHRI GOVINDAM HEIGHTSSATARA DEVLAI, 431002SHREE VYANKATESHA INFRA23842%28 Apr 2022Registered
180 and 51 GreensSatara Aurangabad, 431005A.M.PATEL INFRA PVT LTD2370%9 Aug 2017Registration lapsed
MANISHAS WHISPER VALLEYSATARA TALUKA, 431010MANISHA'S WHISPER VALLEY23665%29 Jul 2019Completed
PRASSANA HIGH CLASS CITY PHASE - IGANDHELI, 431001SHRI KRISHNA NAGAR SAHAKARI GRAH NIRMAN SANSTHA MARYADIT2260%24 Sep 2026Registered
Dream World Phase IIMIDC Chikalthana Industrial Area, Villege Chikalthana, 431006Manjeet Landmark LLP21412%22 Jan 2026Registered
MILLENNIUM BUSINESS CENTERJALNA ROAD, 431005MILLENNIUMPRO NEST LLP2110%4 Dec 2024Registered
Khinvasara Town Part-1CIDCO, Waluj Mahanagar-1, 431136Champalal Kanhaiyalal Khinvasara20176%5 Mar 2019Completed
Dream World Phase IMIDC Chikalthana, 431006Manjeet Landmark LLP20068%24 Feb 2023Registered
Sawangi City Phase-2Sawangi, 431008Aryaman Infra1970%24 Jun 2026Registered
The Solitairee Phase IIItkheda, 431005Dizzi Land Farms Private Limited19632%17 Mar 2025Registered
Infinity Business ParkSARVEY NO 03/P, VILLAGE BAIJIPURA, SECTOR P 1, TOWN CENTRE CIDCO, AURANGABAD, 431005ABOLI ADVISORS LLP19042%7 Feb 2023Registered
Mulay I SquareK Sector, Near Endurance Plant, 431133Gangamai Industries and constructions Limited AND Nirman Constructions JV18519%9 Aug 2017Registered
Waluj Trade TowerMIDC Waluj Industrial Area, 431136Govind Enterprises1840%13 Jul 2026Registered
Renuka NagariNarayanpur Kh., 431136Shlok Realty18013%1 Apr 2023Registered
SHRIRAM RESIDENCYBHAVSINGPURA, 431001UNIQUE BUILDCON17853%12 Dec 2019Registered
GANGOTRI VIHAR PHASE INakshtrawadi, 431002INSPIRA REALTY LLP1690%23 Oct 2021Completed
KirtibanSatara, 431010Piyush Infratech Private Limited1680%9 Mar 2026Registered
NABHRAJ NANDANVAN PHASE IIICHIKALTHANA, 431210Nabhraj Construction16880%24 Jun 2019Registration lapsed
HARIKUNJFarola, 431105DEEPAK RADHESHYAM JHUNJHUNWALA16146%25 Jul 2017Registration lapsed
Bhanudas Nagar Phase-IBhanudas Nagar Phase I, 431133Joshi Associates1600%21 Jan 2021Completed
Nabhraj RYAN BUSINESS HUBMondha, 431001NABHRAJ BUILDERS AND DEVELOPERS PVT LTD16017%11 Sep 2023Registered
KRISHNANAGARANANTPUR, LASUR STATION, 423702DEVIDAS BAJIRAO MALODE1580%24 Sep 2020Registration lapsed
Amrut Sai Gold StarOpp 30 Green, 431005AMRUT SAI GOLD STAR1568%19 Mar 2019Registered
JANKI HEIGHTSSHENDRA, 431008SHREE BALAJI BUILDCON1540%12 Dec 2024Registered
Suvidhi SignatureChikalthana Industrial Area, 431006Sunder Ajanta Hospitality15358%21 Apr 2023Completed
KINGS CITYBALAPUR, 431117PREETANSH DEVELOPERS15195%15 Jun 2022Registered
ARCH YZ ATLANTISCHIKALTHANA, 431006Jaz Infra1480%9 Sep 2026Registered
Hrim Ssky City Phase VBeed By Pass, 431007Ashok Baheti1425%25 Aug 2019Registered
Khinvasara Nirvana City Part 1Sulibhanjan, 431101Shanti Resorts LLP1410%19 Mar 2018Completed
GOLOK CARNATIONWadgaon Kolhati (CT), 431136GOLOK DEVELOPERS14051%11 Aug 2017Registered
PARSHWA HEIGHTSSATARA PARISAR, 431001ABHISHEK DEVELOPERS14039%3 Feb 2022Registered
THE URBAN OASISTISGAON WALUJ MAHANAGAR, 431136AMRUT NISHA SAI LANDMARKS14062%2 Apr 2024Registered
Planning a launch in Aurangabad? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Aurangabad

VIKAS LAXMAN CHAUDHARY (14), SAJANSING MOTILAL JARWAL (12), SIMAR PRIDE VENTURES LLP (10), Sara Infrastructures (9), SARA PROPERTIES (9), Bhuvi Landmarks LLP (8). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Aurangabad projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 5% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Aurangabad project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Aurangabad district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Aurangabad registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Aurangabad project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Aurangabad district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.