ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur

Registered No litigation declared Residential / Group Housing project

PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur

By Samarath Multibiz JV

RG-MH-99765 · RERA P51500029399 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 60 months from the original
13 of 836Construction stages doneacross 76 buildings; furthest along: Staircases, 90%
554 of 591Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur is a Residential / Group Housing project by Samarath Multibiz JV in Aurangabad, Maharashtra, registered with MahaRERA as P51500029399 on 29 May 2021. Possession is promised by 31 Dec 2029. The completion date has moved by 60 months from the original filing. 37 of the 591 units on this registration are recorded sold or booked, and 13 of 836 construction stages are filed complete.

At a glance

Project

  • NamePMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur
  • TypeResidential / Group Housing
  • Location
    • Mouje
    • Ambewadi
    • Gangapur (M Cl)
    • Gangapur
    • Aurangabad
    • 431109
  • Pincode431109
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500029399
  • ReraGenie IDRG-MH-99765

Builder

  • NameSamarath Multibiz JV
  • Entity typeOthers
  • Named personsNavnirman mahila Bahu-Uddeshiya Sanstha, Siddharth Properties

Key dates

this monthRegisteredMay 2021First promiseDec 2024Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 May 2021
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2024)
  • Buildings76 building records
  • Documents filed113 files

Current status

6%37 of 591 units booked
21.9%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA11808
A2NA11808
A3NA11808
A4NA11808
A5NA11808
A6NA11808
A7NA11808
A8NA11808
A9NA11808
A10NA11808
A11NA11808
A12NA11808
A13NA11808
A14NA11808
A15NA11808
A16NA11808
A17NA11808
B1NA11808
B2NA11808
B3NA11808
B4NA11808
B5NA11808
B6NA11808
B7NA11808
B8NA11808
B9NA11808
B10NA11808
B11NA11808
B12NA11808
B13NA11808
B14NA11808
B15NA11808
B16NA11808
B17NA11808
B18NA11707
B19NA11707
B20NA11707
B21NA11707
B22NA11707
B23NA11707
B24NA11707
B25NA11808
B26NA11808
B27NA11808
B28NA11808
B29NA11808
B30NA11808
B31NA11808
B32NA11808
B33NA11707
B34NA11707
B35NA11808
B36NA11707
B37NA11808
B38NA11808
B39NA11707
B40NA11707
B41NA11707
B42NA11707
B43NA11707
B44NA11707
B45NA11707
B46NA11808
B47NA11808
B48NA11808
B49NA11808
B50NA11808
B51NA11808
B52NA11808
B53NA11808
B54NA11808
B55NA11808
B56NA11808
B57NA11808
B58NA11808
B59NA11808

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 76 buildings; the table lists the first 20.

13 of 836 construction stages are filed complete across 76 buildings. The stage furthest along is Staircases, at 90%.

A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A100%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A110%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A120%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A130%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A140%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A150%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A160%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A170%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed591

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots591
Open Space591
BuildingOpen SpaceTotal
A177
A277
A377
A477
A577
A677
A777
A877
A977
A1077
A1177
A1277
A1377
A1477
A1577
A1677
A1777
B188
B288
B388
B488
B588
B688
B788
B888
B988
B1088
B1188
B1288
B1388
B1488
B1588
B1688
B1788
B1888
B1988
B2088
B2188
B2288
B2388
B2488
B2588
B2688
B2788
B2888
B2988
B3088
B3188
B3288
B3388
B3488
B3588
B3688
B3788
B3888
B3988
B4088
B4188
B4288
B4388
B4488
B4588
B4688
B4788
B4888
B4988
B5088
B5188
B5288
B5388
B5488
B5588
B5688
B5788
B5888
B5988

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area79,953 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Gangapur Nagar PanchayatGangapur (M Cl)Aurangabad

Approvals and building plan

Sanctioning authorityGANGAPUR MUNICIPAL COUNCIL, GANGAPUR TQ GANGAPUR DIST AURANGABAD
Permissible FSI19204.83
Proposed, not sanctioned19,205 sq m
Buildings approved76
Buildings sanctioned76

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchjalna Aurangabad
Estimated costRs 8.19 cr
Cost incurredRs 1.80 cr
Work done21.93%
BuildingWingEstimatedIncurred
A1NARs 7.58 crRs 1.67 cr
-NARs 60.68 lakhRs 12.74 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Nitawane
ArchitectAADI STUDIO
EngineerSwapnil Wakale
EngineerAMAR KHANDELWAL
Chartered AccountantTushar Desarda
Chartered AccountantCA Abhay Lodha & Associates
Chartered AccountantBKPS AND ASSOCIATES
Chartered AccountantSinghal Sunil and Associates
PartnerRole in project
Samarath Multibiz JV-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07012619330Dec 2024 → Dec 2029

Reason as filed by the promoterTHERE IS THE ISSUE IN THE LAND ACQUISITION BY MUNICIPAL COUNCIL FOR THE SAID PROJECT DUE TO WHICH THE PROJECT IS DELAYED NOW EVERYTHING SORTED OUT SO THE MUNICIPAL COUNCILS NEEDS RERA EXTENSION THROUGH THE DEVELOPER OF THE PROJECT.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 May 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 May 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 16 Form-1 March 25.pdf23 Jun 2026
Form 2File: 16 Form-2 March 25.pdf23 Jun 2026
Form 3File: 16 Form-3 March 25.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: 16 Sold Mar 25.pdf23 Jun 2026
Withdrawal Update Form 1File: 1 FORM-1 JUN 25.pdf23 Jun 2026
Withdrawal Update Form 1File: 18 Form-1 Sep 25.pdf23 Jun 2026
Withdrawal Update Form 2File: 2 FORM-2 JUN 25.pdf23 Jun 2026
Withdrawal Update Form 2File: 18 Form-2 Sep 25.pdf23 Jun 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025.pdf23 Jun 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025.pdf23 Jun 2026
Withdrawal Update Form 1File: 1 FORM-1 JUN 25.pdf11 Mar 2026
Withdrawal Update Form 2File: 2 FORM-2 JUN 25.pdf11 Mar 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025.pdf11 Mar 2026
Form 1File: 1 Form-1 June 21.pdf4 Dec 2025
Form 2File: 1 Form-2 June 21.pdf4 Dec 2025
Form 3File: 1 Form-3 June 21.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 1 Sold Jun 21.pdf4 Dec 2025
Form 1File: 2 Form-1 Sep 21.pdf4 Dec 2025
Form 2File: 2 Form-2 Sep 21.pdf4 Dec 2025
Form 3File: 2 Form-3 Sep 21.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 2 Sold Sep 21.pdf4 Dec 2025
Form 1File: 3 Form-1 Dec 21.pdf4 Dec 2025
Form 2File: 3 Form-2 Dec 21.pdf4 Dec 2025
Form 3File: 3 Form-3 Dec 21.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 3 Sold Dec 21.pdf4 Dec 2025
Form 1File: 4 Form-1 March 22.pdf4 Dec 2025
Form 2File: 4 Form-2 March 22.pdf4 Dec 2025
Form 3File: 4 Form-3 March 22.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold Mar 22.pdf4 Dec 2025
OthersFile: Form-2A 21-22.pdf4 Dec 2025
Form 1File: 5 Form-1 June 22.pdf4 Dec 2025
Form 2File: 5 Form-2 June 22.pdf4 Dec 2025
Form 3File: 5 Form-3 June 22.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 5 Sold Jun 22.pdf4 Dec 2025
Form 1File: 6 Form-1 Sep 22.pdf4 Dec 2025
Form 2File: 6 Form-2 Sep 22.pdf4 Dec 2025
Form 3File: 6 Form-3 Sep 22.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 6 Sold Sep 22.pdf4 Dec 2025
Form 1File: 7 Form-1 Dec 22.pdf4 Dec 2025
Form 2File: 7 Form-2 Dec 22.pdf4 Dec 2025
Form 3File: 7 Form-3 Dec 22.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 7 Sold Dec 22.pdf4 Dec 2025
Form 1File: 8 Form-1 March 23.pdf4 Dec 2025
Form 2File: 8 Form-2 March 23.pdf4 Dec 2025
Form 3File: 8 Form-3 March 23.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 8 Sold Mar 23.pdf4 Dec 2025
OthersFile: Form-2A 22-23.pdf4 Dec 2025
Form 1File: 9 Form-1 June 23.pdf4 Dec 2025
Form 2File: 9 Form-2 June 23.pdf4 Dec 2025
Form 3File: 9 Form-3 June 23.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 9 Sold Jun 23.pdf4 Dec 2025
Form 1File: 10 Form-1 Sep 23.pdf4 Dec 2025
Form 2File: 10 Form-2 Sep 23.pdf4 Dec 2025
Form 3File: 10 Form-3 Sep 23.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 10 Sold Sep 23.pdf4 Dec 2025
Form 1File: 11 Form-1 Dec 23.pdf4 Dec 2025
Form 2File: 11 Form-2 Dec 23.pdf4 Dec 2025
Form 3File: 11 Form-3 Dec 23.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 11 Sold Dec 23.pdf4 Dec 2025
Form 1File: 12 Form-1 March 24.pdf4 Dec 2025
Form 2File: 12 Form-2 March 24.pdf4 Dec 2025
Form 3File: 12 Form-3 March 24.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 12 Sold Mar 24.pdf4 Dec 2025
OthersFile: Form-2A 23-24.pdf4 Dec 2025
Form 1File: 13 Form-1 June 24.pdf4 Dec 2025
Form 2File: 13 Form-2 June 24.pdf4 Dec 2025
Form 3File: 13 Form-3 June 24.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 13 Sold Jun 24.pdf4 Dec 2025
Form 1File: 14 Form-1 Sep 24.pdf4 Dec 2025
Form 2File: 14 Form-2 Sep 24.pdf4 Dec 2025
Form 3File: 14 Form-3 Sep 24.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 14 Sold Sep 24.pdf4 Dec 2025
Form 1File: 15 Form-1 Dec 24.pdf4 Dec 2025
Form 2File: 15 Form-2 Dec 24.pdf4 Dec 2025
Form 3File: 15 Form-3 Dec 24.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: 15 Sold Dec 24.pdf4 Dec 2025
Building plan approvalFile: Building Permission 2_11_compressed.pdf20 May 2021
Building plan approvalFile: Building Permission 4_11_compressed.pdf20 May 2021
Building plan approvalFile: Building Permission 4_11_compressed.pdf20 May 2021
Building plan approvalFile: Building Permission 5_11_compressed.pdf20 May 2021

How this compares with Aurangabad

6%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 60 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep PMAY591 EWS housing in S.no 29 Mouje Ambewad on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambewadi1,400+ in Aurangabad

Builder: Samarath Multibiz JV

Samarath Multibiz JV has 1 registration on MahaRERA, including PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur?

The registered promoter entity is Samarath Multibiz JV, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur?

The professionals named in the filing: Architect: Rahul Nitawane; Architect: AADI STUDIO; Engineer: Swapnil Wakale; Engineer: AMAR KHANDELWAL; Chartered Accountant: Tushar Desarda; Chartered Accountant: CA Abhay Lodha & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PMAY591 EWS housing in S.no 29 Mouje Ambewadi Gangapur. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PMAY591 EWS housing in S.no 29 Mouje Ambewad to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.