Saffron Landmarks

By Saffron Associates

RG-MH-03706 · RERA P51500048247 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
324 of 356Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

Saffron Landmarks is a Commercial project by Saffron Associates in Aurangabad, Maharashtra, registered with MahaRERA as P51500048247 on 22 Dec 2022. Possession is promised by 30 Jun 2027. 32 of the 356 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSaffron Landmarks
  • TypeCommercial
  • Location
    • Beed Bypass
    • Satara
    • Satara (CT)
    • Aurangabad
    • 431010
  • Pincode431010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500048247
  • ReraGenie IDRG-MH-03706

Builder

  • NameSaffron Associates
  • Entity typePartnership
  • PartnersUmesh Popatlal Munot, Vithal Ganpatrao Labhshetwar, Lalit Mansukh Zambad, Yogesh Baliram Vargantwar, Mandakini Narayanrao Mahajan, Manoj Kapurchand Kala, Manish Dalichand Parakh, Narayan Venkat Polawar, Laxminarayan Mallaya Chanda, Madhukar Govind Narlawar, Murlidhar Pralhad Wattamwar
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2022PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Dec 2022
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed116 files

Current status

9%32 of 356 units booked
57.0%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Saffron LandmarkNA15100356356

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

Saffron Landmark: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,304 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Apr 2026

Approvals and building plan

Sanctioning authorityAurangabad Mahanagarpalika
Permissible FSI39580.21
Proposed, not sanctioned28,080 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChikalthana, Aurangabad
Estimated costRs 80.00 cr
Cost incurredRs 45.60 cr
Work done57.0%
BuildingWingEstimatedIncurred
Saffron LandmarkNARs 80.00 crRs 45.60 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManoj Kala
EngineerRajesh Vargantwar
EngineerAbhishek Bakliwal
EngineerSanket Chavan
EngineerMillind Wamanrao Wankhede
Chartered AccountantNarendra Navandar & Co
Chartered AccountantMahesh Indani
PartnerRole in project
Saffron Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A FY 2025-26 ENGINEERSS CERTIFICATE SAFFRON.pdf2 Jul 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate Mar 2026.pdf27 Apr 2026
Withdrawal Update Form 2File: From 2 Engineers Certificate Mar 2026.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3 Saffron Associates_0001.pdf27 Apr 2026
Form 5 (FY 2022-2023)File: Saffron Landmarks Form 5 FY 2022-23.pdf9 Mar 2026
Form 5 (FY 2023-2024)File: Saffron Landmarks Form 5 FY 2023-24.pdf9 Mar 2026
Form 5 (FY 2024-2025)File: Saffron Landmarks Form 5 FY 2024-25.pdf9 Mar 2026
Form 1File: ARCHITECTS CERTIFICATE LANDMARK Q3 25-26.pdf10 Feb 2026
Form 2File: ENGINEERS CERTIFICATE LANDMARK Q3 25-26.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: 13 Disclosure of Sold-Booked Inventory DEC 2025.pdf10 Feb 2026
Form 3File: CA Certificate Saffron Associates_0001.pdf10 Feb 2026
OthersFile: SAFFRON LANDMARK SITE SUPERVISOR CERTIFICATE Q3 25-26.pdf10 Feb 2026
Form 1File: Architect certificate SEP 2025 SL (1).pdf19 Nov 2025
Form 2File: Engineers Certificate SEP 2025 SL.pdf19 Nov 2025
Form 3File: Saffron Landmark LLP Sep-2025_0001.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory SEP 2025.pdf19 Nov 2025
OthersFile: Site Supervisor Certificate SEP 2025 SL.pdf19 Nov 2025
Form 1File: 11 Architects Certificate Saffron landmark 05-07-2025.pdf20 Sep 2025
Form 2File: Saffron Landmarks Er Jun 2025.pdf20 Sep 2025
Disclosure of Sold and Booked InventoryFile: 11 Disclosure of Sold-Booked Inventory JUNE 2025.pdf20 Sep 2025
OthersFile: 11 JUNE 25 Form 2A - Site Superviser (Quality Assurance).pdf20 Sep 2025
Form 3File: CA Certificate Dt-20-09-2025_0001_0001.pdf20 Sep 2025
Form 1File: Form 1.pdf16 Sep 2025
Form 2File: Saffron Landmarks Er Dec 2022.pdf16 Sep 2025
Form 3File: Form 3.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: 01 Disclosure of Sold-Booked Inventory DEC 2022.pdf16 Sep 2025
OthersFile: 01 SAFFRON LANDMARK SITE SUPERVISER DEC 22.pdf16 Sep 2025
Form 1File: Form 1.pdf16 Sep 2025
Form 2File: Saffron Landmarks Er Mar 2023.pdf16 Sep 2025
Form 3File: Form 3.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: 02 Disclosure of Sold-Booked Inventory MAR 2023.pdf16 Sep 2025
OthersFile: 02 SAFFRON LANDMARK SITE SUPERVISER MAR 23.pdf16 Sep 2025
Form 1File: Form 1.pdf16 Sep 2025
Form 2File: Saffron Landmarks Er Jun 2023.pdf16 Sep 2025
Form 3File: Form 3.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: 03 Disclosure of Sold-Booked Inventory JUNE 2023.pdf16 Sep 2025
OthersFile: 03 SAFFRON LANDMARK SITE SUPERVISER JUN 23.pdf16 Sep 2025
Form 1File: Form 1.pdf16 Sep 2025
Form 2File: Saffron Landmarks Er Sep 2023.pdf16 Sep 2025
Form 3File: Form 3.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: disc.pdf16 Sep 2025
OthersFile: 04 SAFFRON LANDMARK SITE SUPERVISER SEP 23.pdf16 Sep 2025
Form 1File: Form 1.pdf16 Sep 2025
Form 2File: Saffron Landmarks Er Dec 2023.pdf16 Sep 2025
Form 3File: CA Certificate Dec 23.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: 05 Disclosure of Sold-Booked Inventory DEC 2023.pdf16 Sep 2025
OthersFile: 05 SAFFRON LANDMARK SITE SUPERVISER DEC 23.pdf16 Sep 2025
Form 1File: Form 1.pdf16 Sep 2025
Form 2File: Saffron Landmarks Er Mar 2024.pdf16 Sep 2025
Form 3File: CA Certificate Mar 24.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: 06 Disclosure of Sold-Booked Inventory MAR 2024.pdf16 Sep 2025
OthersFile: 06 SAFFRON LANDMARK SITE SUPERVISER MAR 24.pdf16 Sep 2025
Form 1File: Form 1.pdf16 Sep 2025
Form 2File: Saffron Landmarks Er Jun 2024.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: 07 Disclosure of Sold-Booked Inventory JUNE 2024.pdf16 Sep 2025
OthersFile: 07 SAFFRON LANDMARK SITE SUPERVISER JUN 24.pdf16 Sep 2025
Form 3File: CA Certificate Jun 24.pdf16 Sep 2025
Form 1File: 08 Architects Certificate Saffron Landamarks 01-10-2024.pdf16 Sep 2025
Form 2File: Saffron Landmarks Er Sep 2024.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: 08 Disclosure of Sold-Booked Inventory SEP 2024.pdf16 Sep 2025
Form 3File: CA Certificate Sep 24.pdf16 Sep 2025
OthersFile: 08 SAFFRON LANDMARK SITE SUPERVISER SEP 24.pdf16 Sep 2025
Form 1File: Form 1.pdf16 Sep 2025
Form 2File: Saffron Landmarks Er Dec 2024.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: 09 Disclosure of Sold-Booked Inventory DEC 2024.pdf16 Sep 2025
Form 3File: CA Certificate Dec 24.pdf16 Sep 2025
OthersFile: 09 SAFFRON LANDMARK SITE SUPERVISER DEC 24.pdf16 Sep 2025
Form 1File: Form 1.pdf16 Sep 2025
Form 2File: Saffron Landmarks Er Mar 2025.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: 10 Disclosure of Sold-Booked Inventory MAR 2025.pdf16 Sep 2025
Form 3File: CA Certificate Mar 25.pdf16 Sep 2025
OthersFile: 10 SAFFRON LANDMARK SITE SUPERVISER MAR 25.pdf16 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE COMMERCIAL 24-25 Q1.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE COMMERCIAL 24-25 Q2.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE COMMERCIAL 24-25 Q3.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE COMMERCIAL 24-25 Q4.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Saffron Landmark Dt-06-01-2024_0001.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Saffron Landmark Dt-06-04-2024.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-12-2022_0001.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dt-31-03-2023_0001.pdf8 Jul 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
SAFFRON TRANQUIL LANDSCAPEP51500002740Satara, AurangabadAug 2017CompletedJan 2021Registered original: Jul 2019Dec 2019

How this compares with Aurangabad

9%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Saffron Landmarks on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Satara1,400+ in Aurangabad

2 kmSaffron LandmarksCompleted 23Lapsed / revoked 16Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: Saffron Associates

Saffron Associates has 5 registrations on MahaRERA, including SAFFRON TRANQUIL LANDSCAPE and SAFFRON LANDSCAPES. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if Saffron Landmarks is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Saffron Landmarks?

The registered promoter entity is Saffron Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Saffron Landmarks?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Saffron Landmarks?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Saffron Landmarks?

The professionals named in the filing: Architect: Manoj Kala; Engineer: Rajesh Vargantwar; Engineer: Abhishek Bakliwal; Engineer: Sanket Chavan; Engineer: Millind Wamanrao Wankhede; Chartered Accountant: Narendra Navandar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Saffron Landmarks?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Saffron Landmarks. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Saffron Landmarks to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.