Registered No litigation declared Others project

SHRIRAM RESIDENCY

By UNIQUE BUILDCON

RG-MH-51615 · RERA P51500023327 · Last updated on MahaRERA portal: 6 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 15 months from the original
62 of 88Construction stages doneacross 8 buildings; furthest along: Staircases, 80%
84 of 178Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

SHRIRAM RESIDENCY is a Others project by UNIQUE BUILDCON in Aurangabad, Maharashtra, registered with MahaRERA as P51500023327 on 12 Dec 2019. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 94 of the 178 units on this registration are recorded sold or booked, and 62 of 88 construction stages are filed complete.

At a glance

Project

  • NameSHRIRAM RESIDENCY
  • TypeOthers
  • Location
    • BHAVSINGPURA TO PADEGAON ROAD
    • BHAVSINGPURA
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500023327
  • ReraGenie IDRG-MH-51615

Builder

  • NameUNIQUE BUILDCON
  • Entity typePartnership
  • PartnersPRAMOD KASTURCHAND MUTHA, CHETAN PREMCHAND MUTHA, SUWALAL GOPIRAM YADAV, MEGHA SANJAY KOMBDE, DEVILAL KALYAN YADAV
  • Other registrations3 more →
  • Completed3 of 4

Key dates

this monthRegisteredDec 2019First promiseDec 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Dec 2019
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 15 Dec 2025)
  • Buildings8 building records
  • Documents filed102 files

Current status

53%94 of 178 units booked
95.8%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA6620525
BNA6620020
MHADA BUILDINGNA7724024
DNA7724024
ENA6620020
FNA6620020
GNA6620020
HNA6620525

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

62 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Staircases, at 80%.

A82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MHADA BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E63%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
F63%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
G82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes90%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Closed/Covered62
BuildingClosed/CoveredTotal
A77
B88
MHADA BUILDING88
D88
E88
F88
G88
H77

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,800 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Jul 2025
LandownerVillageDistrict
SANDEEP JANKIRAM LOKHANDEAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityTOWN PLANNING CHHATRAPATI SAMBHAJINAGAR MAHANAGARPALIKA
Permissible FSI13686.61
Proposed, not sanctioned8,258 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW OSMANPURA COLONY AURANGABAD 431005
Estimated costRs 20.05 cr
Cost incurredRs 19.20 cr
Work done95.75%
BuildingWingEstimatedIncurred
MHADA BUILDINGNARs 2.74 crRs 2.74 cr
DNARs 2.74 crRs 2.74 cr
HNARs 2.49 crRs 2.49 cr
ENARs 2.29 crRs 1.93 cr
FNARs 2.29 crRs 1.93 cr
GNARs 2.29 crRs 2.29 cr
ANARs 2.27 crRs 2.27 cr
BNARs 2.09 crRs 2.09 cr
-NARs 85.55 lakhRs 72.72 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMEER N AUSEKAR
EngineerMILIND MADHUKARRAO WADEKAR
EngineerKALYAN ANNASAHEB KHARDE
Chartered AccountantSAURABH S GANGWAL
Chartered AccountantPRASAD HARALE
Chartered AccountantVISHAL R PATNI
PartnerRole in project
UNIQUE BUILDCON-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28112518463Dec 2025 → Mar 2027

Reason as filed by the promoterProject the promoter already received the completion certificates for A, B, MHADA, D ,G, H. Attached for Reference. And the Only E and F building Pending. In which there is no sale.... rest possession given.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jun 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jun 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 May 2024

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 19072026 Architect Certificate Up To June 26 by Anil.pdf6 Aug 2026
Withdrawal Update Form 1File: 19072026 Architect Certificate Up To June 26 by Anil.pdf6 Aug 2026
Withdrawal Update Form 2File: 19072026 Engineer Certificate Up To June 26 By Anil.pdf6 Aug 2026
Withdrawal Update Form 2File: 19072026 Engineer Certificate Up To June 26 By Anil.pdf6 Aug 2026
Withdrawal Update Form 3File: 19072026 CA Form No3 June26.pdf6 Aug 2026
Withdrawal Update Form 3File: 19072026 CA Form No3 June26.pdf6 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A Upto June2026 By RERA Signed Copy.pdf4 Aug 2026
Withdrawal Update Form 1File: FORM 1 MAR 26.pdf7 May 2026
Withdrawal Update Form 2File: FORM 2 MAR 26.pdf7 May 2026
Withdrawal Update Form 3File: FORM 3 MAR 26 (O).pdf7 May 2026
Withdrawal Update Form 1File: Architect Certificate Form.pdf11 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Form 2.pdf11 Mar 2026
Withdrawal Update Form 3File: CA Form No3_compressed.pdf11 Mar 2026
Form 1File: FORM 1 SEP 2025.pdf20 Nov 2025
Form 2File: FORM 2 SEP 2025.pdf20 Nov 2025
Form 3File: Shriram Residency Form-3 Dclaration Sep 2025.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Up To SEP 2025.pdf20 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf4 Nov 2025
Form 1File: 1 Form-1 June 25.pdf7 Aug 2025
Form 2File: 2 Form -2 June 25.pdf7 Aug 2025
Form 3File: 3 Form-3 June 25.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold Unsold June 25.pdf7 Aug 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 10082024 Form No5 202324.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A QUALITY ASSURANCE CERTIFICATE UP TO MARCH 2025 NEW.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shriram Residency Form-1 June.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shriram Residency Form-2 June.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Shriram Residency Sold June.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 Revised.pdf19 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: part occupancy Certificate abcd.pdf16 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A QUALITY ASSURANCE CERTIFICATE UP TO MARCH 2024.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UBNAC.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: UBNEC.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 27102023 CA Form No3 Revised.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 07092023 Form No5 FY2022-23.pdf9 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01042023 Form1 Architect Certificate Upto 31 March2023.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 17072023 Form1 Architect Certificate Upto April To June 2023.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01042023 Form 2 Engineer Certificate As on 31 March2023.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17072023 Form2 Engineer Certificate April To June 2023.pdf18 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Upto March2023.pdf6 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 201920 Unique Buildcon.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 202021 Unique Buildcon.pdf14 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Upto March2020.pdf11 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Upto March2021.pdf11 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Upto March2022.pdf11 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15052020 Form1Architect Certificate Upto 31 March2020.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15052020 Form2 Engineer Certificate Up to March2020.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 12012023 Form No5 202122.pdf12 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03012022 Form1 Architect Certificate at the time of Registration.pdf3 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03012022 Form1 Architect Certificate Upto 31 March 2021.pdf3 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03012022 Form1 Architect Certificate Upto 31 March 2022.pdf3 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03012022 Form2 Engineers Certificate at the time of Registration.pdf3 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03012022 Form2 Engineer Certificate Up to March2021.pdf3 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03012022 Form2 Engineer Certificate Up to March2022.pdf3 Jan 2023
Details of encumbrancesFile: 09072021 No Encumbrances.pdf9 Jul 2021
Layout approvalFile: 1 Layout Plan.pdf5 Jun 2020
Building plan approvalFile: 2 Building ABGH.pdf5 Jun 2020
Building plan approvalFile: 3 Section ABGH.pdf5 Jun 2020
Building plan approvalFile: 4 Building CD.pdf5 Jun 2020
Building plan approvalFile: 5 Section CD.pdf5 Jun 2020
Building plan approvalFile: 6 Building EF.pdf5 Jun 2020
Building plan approvalFile: 7 Section EF.pdf5 Jun 2020
Copy of Layout Approval (in case of layout)File: 1 Layout Plan.pdf5 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: 2 Building ABGH.pdf5 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: 3 Section ABGH.pdf5 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: 4 Building CD.pdf5 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: 5 Section CD.pdf5 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: 6 Building EF.pdf5 Jun 2020
Building Plan Approval / NA Order for plotted developmentFile: 7 Section EF.pdf5 Jun 2020
Commencement Certificates / NA Order for plotted developmentFile: 060520 Revise Permission.pdf5 Jun 2020
Proforma of Allotment letterFile: Draft of Agreement to Sale.pdf18 Nov 2019

How this compares with Aurangabad

53%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 15 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SHRIRAM RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAVSINGPURA1,400+ in Aurangabad

2 kmSHRIRAM RESIDENCYCompleted 4Lapsed / revoked 7Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: UNIQUE BUILDCON

UNIQUE BUILDCON has 4 registrations on MahaRERA, including SHRIRAM RESIDENCY and Unique Legacy Majestic. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SHRIRAM RESIDENCY is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRIRAM RESIDENCY?

The registered promoter entity is UNIQUE BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRIRAM RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRIRAM RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRIRAM RESIDENCY?

The professionals named in the filing: Architect: SAMEER N AUSEKAR; Engineer: MILIND MADHUKARRAO WADEKAR; Engineer: KALYAN ANNASAHEB KHARDE; Chartered Accountant: SAURABH S GANGWAL; Chartered Accountant: PRASAD HARALE; Chartered Accountant: VISHAL R PATNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRIRAM RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRIRAM RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRIRAM RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.