Home / Browse projects / Aurangabad, Maharashtra / The Solitairee Phase II

Registered No litigation declared Others project

The Solitairee Phase II

By Dizzi Land Farms Private Limited

RG-MH-31303 · RERA P51500079637 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
9 of 33Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 50%
133 of 196Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

The Solitairee Phase II is a Others project by Dizzi Land Farms Private Limited in Aurangabad, Maharashtra, registered with MahaRERA as P51500079637 on 17 Mar 2025. Possession is promised by 31 Dec 2030. 63 of the 196 units on this registration are recorded sold or booked, and 9 of 33 construction stages are filed complete.

At a glance

Project

  • NameThe Solitairee Phase II
  • TypeOthers
  • Location
    • Paithan Road
    • Itkheda
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500079637
  • ReraGenie IDRG-MH-31303

Builder

  • NameDizzi Land Farms Private Limited
  • Entity typeCompany
  • CINU01110MH1992PTC066197
  • GSTIN27AACCD4623R1Z9
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsAshu Jain, Satish Laxminarayan Kagliwal
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Mar 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings3 building records
  • Documents filed79 files

Current status

32%63 of 196 units booked

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Type D WingNA1615511263
A type E WingNA1615521466
A Type F WingNA1615511667

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 50%.

A Type D Wing33%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A type E Wing33%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A Type F Wing33%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,840 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Milind Dinkarrao KelkarAurangabad (M Corp.)Aurangabad
Mohini Milind KelkarAurangabad (M Corp.)Aurangabad
Rajlaxmi Satish LodhaAurangabad (M Corp.)Aurangabad
Narayana Infra Ventures Pvt LtdAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityChhatrapati Sambhajinagar Municipal Corporation, Chhatrapati Sambhajinagar
Permissible FSI25642.03
Proposed, not sanctioned21,842 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchD5-1 A B and C EAST NEAR PROZONE MALL CHILKALTHANACHHATRAPATI SAMBHAJINAGAR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManoj Kala
EngineerAjay Chidamber Kulkarni
Chartered AccountantNarendra Navandar
Chartered AccountantR B Sharma
PartnerRole in project
Dizzi Land Farms Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Phase 2 Form 1.pdf1 Jun 2026
Form 2File: Phase 2 Form 2.pdf1 Jun 2026
Form 3File: Phase II Form 3.pdf1 Jun 2026
Disclosure of Sold and Booked InventoryFile: Phase II Sold Unsold.pdf1 Jun 2026
Form 1File: P II Architect Certificate Form 1.pdf31 Jan 2026
Form 2File: P II Engineers Certificate Form 2.pdf31 Jan 2026
Form 3File: P II Declaration Form 3.pdf31 Jan 2026
Disclosure of Sold and Booked InventoryFile: P II Sold Unsold.pdf31 Jan 2026
Form 1File: P II Sept 25 Form 1 Architect Certificate.pdf18 Nov 2025
Form 2File: P II Sept 25 From 2 Engineers Certificate.pdf18 Nov 2025
Form 3File: P II Sept 25 Form 3 Declaration.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: P II Sept 25 Sold Unsold.pdf18 Nov 2025
Form 1File: 5 Form-1 Jun 25.pdf15 Sep 2025
Form 2File: 6 Form-2 Jun 25.pdf15 Sep 2025
Form 3File: 7 FORM-3 JUN 25.pdf15 Sep 2025
Disclosure of Sold and Booked InventoryFile: 8 SOLD JUN 25.pdf15 Sep 2025
Form 1File: FORM 1 MARCH 2025.pdf31 May 2025
Form 2File: FORM 2 MARCH 2025.pdf31 May 2025
Form 3File: FORM 3 DECLARATION.pdf31 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Format A With Declaration.pdf11 Mar 2025
Other - FinanceFile: Bank account Declaration.pdf11 Mar 2025
Other - TechnicalFile: Arch Area Declaration.pdf11 Mar 2025
Other - FinanceFile: Arch Area Statement.pdf10 Mar 2025
Other - TechnicalFile: Arch Area Statement.pdf10 Mar 2025
Other - TechnicalFile: Form-B Declaration.pdf10 Mar 2025
Building plan approvalFile: letter.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA.pdf29 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: letter.pdf29 Jan 2025
Other - TechnicalFile: letter.pdf29 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Plinth Phase 2.pdf1 Jan 2025
Other - TechnicalFile: Plinth Phase 2.pdf1 Jan 2025
Other - TechnicalFile: GetUserDocumentFileContent.pdf1 Jan 2025
Proforma of Agreement for saleFile: ASF - Dizziland RERA.pdf1 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank Declaration.pdf1 Jan 2025
Copy of the legal title reportFile: 1 (3 files merged).pdf14 Dec 2024
Other - TechnicalFile: DIZZI DRW - 3-11 Area Phase 2.pdf14 Dec 2024
CERSAI detailsFile: CERSAI_Search_Report_200316335783_For_Asset_Based_Search_07_08_2024_17_17_03_253.pdf7 Aug 2024
CERSAI detailsFile: 1 CERSAI details (1).pdf7 Aug 2024
Details of encumbrances concerned to FinanceFile: Letter of Encumberance_0001.pdf6 Aug 2024
Details of encumbrances concerned to FinanceFile: Declaration of No-Encumberance_0001.pdf6 Aug 2024
Details of encumbrances concerned to LegalFile: Letter of Encumberance_0001.pdf6 Aug 2024
Details of encumbrances concerned to LegalFile: Declaration of No-Encumberance_0001.pdf6 Aug 2024
Deviation Report with respect to model copy of AgreementFile: To Whom so ever It may concern_0001.pdf6 Aug 2024
Declaration in FORM BFile: Form-B New PHASE 2.pdf3 Aug 2024
Declaration about Commencement CertificateFile: Format-D.pdf3 Aug 2024
Other - TechnicalFile: Annexure A Phase-II Dt-18-07-2024_0001.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf1 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure_0001.pdf1 Aug 2024
Proforma of Allotment letterFile: allotment_letter_new_format[1] along with parking details.pdf31 Jul 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 1-11.pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 2-11.pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 3-11.pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 4-11.pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 5-11 - converted.pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 6-11 - converted.pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 7-11 - converted.pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 8-11 - converted.pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 9-11.pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 10-11 - converted.pdf30 Jul 2024
Building plan approvalFile: DIZZI DRW - 11-11 - converted.pdf30 Jul 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 11-11 - converted.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 10-11 - converted.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 9-11.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 8-11 - converted.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 7-11 - converted.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 6-11 - converted.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 4-11.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 3-11.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 2-11.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 1-11.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: DIZZI DRW - 5-11 - converted.pdf30 Jul 2024
PAN CardFile: FirmPan.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf25 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: DIZZILAND PERMISSION.pdf25 Jul 2024
Deviation Report with respect to Allotment letterFile: To Whom So Ever it may con_0001.pdf25 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Satish Kagliwal_0001.pdf25 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Ashu jain_0001.pdf25 Jul 2024

How this compares with Aurangabad

32%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep The Solitairee Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Itkheda1,400+ in Aurangabad

2 kmThe Solitairee Phase IICompleted 17Lapsed / revoked 10Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: Dizzi Land Farms Private Limited

Dizzi Land Farms Private Limited has 3 registrations on MahaRERA, including The Solitairee Phase I and The Solitairee Phase II. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if The Solitairee Phase II is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Solitairee Phase II?

The registered promoter entity is Dizzi Land Farms Private Limited, a company as per the filing. Its CIN U01110MH1992PTC066197 and GSTIN 27AACCD4623R1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Solitairee Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Solitairee Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Solitairee Phase II?

The professionals named in the filing: Architect: Manoj Kala; Engineer: Ajay Chidamber Kulkarni; Chartered Accountant: Narendra Navandar; Chartered Accountant: R B Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Solitairee Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Solitairee Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Solitairee Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.