Registration lapsed No litigation declared Residential / Group Housing project

180 and 51 Greens

By A.M.PATEL INFRA PVT LTD

RG-MH-00987 · RERA P51500004770 · Last updated on MahaRERA portal: 23 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 33 months past the filed date
  • 4 complaints at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Jan 2024Possession promised33 months past this date
40 of 88Construction stages doneacross 8 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
237 of 237Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

180 and 51 Greens is a Residential / Group Housing project by A.M.PATEL INFRA PVT LTD in Aurangabad, Maharashtra, registered with MahaRERA as P51500004770 on 9 Aug 2017. Possession was promised by 31 Jan 2024 and is now 33 months past that date. The completion date has moved by 6 months from the original filing. 0 of the 237 units on this registration are recorded sold or booked, and 40 of 88 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • Name180 and 51 Greens
  • TypeResidential / Group Housing
  • Location
    • Beed By Pass Road
    • Satara Aurangabad
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500004770
  • ReraGenie IDRG-MH-00987

Builder

  • NameA.M.PATEL INFRA PVT LTD
  • Entity typeCompany
  • Managing DirectorBHAVEN BHASKARBHAI AMIN
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

33 months past promisethis monthRegisteredAug 2017First promiseJul 2023Revised toJan 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion31 Jan 2024
  • Revised completionRevised to 31 Jan 2024 (originally 31 Jul 2023)
  • Buildings8 building records
  • Documents filed106 files

Current status

0%0 of 237 units booked

Figures as on 23 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A OF 180 GREENSNA141446046
WING B OF 180 GREENSNA141446046
WING C OF 180 GREENSNA141446046
WING D OF 180 GREENSNA141446046
WING E OF 51 GREENSNA15315350050
CLUBHOUSE IINA20101
CLUBHOUSE INA22101
AMENITY BUILDINGNA80011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 23 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

WING A OF 180 GREENS81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor1%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
WING B OF 180 GREENS90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
WING C OF 180 GREENS89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
WING D OF 180 GREENS78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor1%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
WING E OF 51 GREENS95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CLUBHOUSE II0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
CLUBHOUSE I0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AMENITY BUILDING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes100%

Parking filed160

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots160
Open Space160
BuildingOpen SpaceTotal
WING A OF 180 GREENS4040
WING B OF 180 GREENS4040
WING C OF 180 GREENS4040
WING D OF 180 GREENS4040

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area29,050 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jul 2026
LandownerVillageDistrict
SHARADCHANDRA RAMANLALJI BAKLIWALAurangabad (M Corp.)Aurangabad
HEMANTKUMAR RAMANLALJI BAKLIWALAurangabad (M Corp.)Aurangabad
DILIPKUMAR RAMANLALJI BAKLIWALAurangabad (M Corp.)Aurangabad
VIPINKUMAR RAMANLALJI BAKLIWALAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityCHH SAMBHAJINAGAR MUNCIPAL CORPORATION
Permissible FSI47000.5
Proposed, not sanctioned41,448 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSBI Waluj Branch Aurangabad

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR MANOJ KALA
ArchitectMR SHOURYA PATEL
ArchitectMANOJ KALA
EngineerSAINATH SUKHDEV MHASKE
Chartered AccountantV R AMIN AND ASSOCIATES
Chartered AccountantABHIJEET PATIL
PartnerRole in project
A.M.PATEL INFRA PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500017218Jul 2023 → Jan 2024

Reason as filed by the promoterWe do Have four towers consisting 46 units in each towers . Out of four towers our three towers are 98% completed. Fourth tower we have completed entire RCC work, drainage line is completed, exterior final paint is in progress. Lift is ordered . within 45 days lift will be installed . 50 percent apartments Glass aluminium work is completed and rest is in progress. All common area like all floors staircase lift lobbies , parking, entrance lobby , parking light is completed. All basic services like water , drainage line, electricity services are operational through out the project. Further we ha

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC003000000010089Rajesh VermaBhaveen Patel & Others AM Patel Infra Pvt Ltd01/11/2021
CC003000000010100Karbhari Deorao LohakareAM Patel Infra Pvt Ltd16/03/2023
CC12602232Rashmin AchaliaA.M.PATEL INFRA PVT LTD16/04/2026
CC12602236Poonam Atul GugaleA.M.PATEL INFRA PVT LTD16/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Feb 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 May 2025

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 arch certificate may 25.pdf23 May 2025
Certificates of CA (Form 3)File: RERA AMP SEP 23.pdf23 May 2025
Certificates of CA (Form 3)File: RERA AMP DEC 23.pdf23 May 2025
Certificates of CA (Form 3)File: RERA AMP Mar 24.pdf23 May 2025
Certificates of CA (Form 3)File: RERA AMP June 24.pdf23 May 2025
Certificates of CA (Form 3)File: RERA AMP Sep 24.pdf23 May 2025
Certificates of CA (Form 3)File: RERA AMP DEC 24.pdf23 May 2025
Certificates of CA (Form 3)File: RERA AMP MAR 25.pdf23 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 2A sept 23_0001.pdf23 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 2A Dec 23_0001.pdf23 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 2A March 24_0001.pdf23 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 2A June 24_0001.pdf23 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 2A Sept 24_0001.pdf23 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 2A Dec 24_0001.pdf23 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 2A MAR 25_0001.pdf23 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AQ Certificate 22_0001.pdf23 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A March 24.pdf21 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate 180 and 51 greens.pdf19 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31st March 23.pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30th June 23.pdf11 Aug 2023
Disclosure of sold/ booked inventoryFile: Final sold inventory.pdf10 Aug 2023
Disclosure of sold/ booked inventoryFile: Final sold unsold inevtry 30th sep 2023.pdf9 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: sold unsold inevtry 30th sep 2023.pdf8 Aug 2023
Declaration in FORM BFile: Form B 2023.pdf1 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf1 Aug 2023
Certificates of CA (Form 3)File: CA CERTIFICATE MARCH 23.pdf1 Aug 2023
Certificates of CA (Form 3)File: CA CERTIFICATE JUN 23.pdf1 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate dec 22.pdf8 Apr 2023
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: DocScanner Feb 8, 2023 6-43 PM.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: DocScanner Feb 8, 2023 6-44 PM.pdf8 Feb 2023
Certificates of CA (Form 3)File: march 2022_0001_compressed.pdf27 Jan 2023
Certificates of CA (Form 3)File: june 2022_0001_compressed.pdf27 Jan 2023
Certificates of CA (Form 3)File: Sept 2022_0001_compressed.pdf27 Jan 2023
Certificates of CA (Form 3)File: march 2022_0001-2_compressed.pdf27 Jan 2023
Certificates of CA (Form 3)File: sept 2022_0001-2_compressed.pdf27 Jan 2023
Certificates of CA (Form 3)File: june 2022_0001-2_compressed.pdf27 Jan 2023
Disclosure of sold/ booked inventoryFile: sold unsold list Nov 22.pdf22 Nov 2021
Certificates of CA (Form 3)File: Form 3 Certificate of CA 180 GREENS 30.pdf22 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Cer No 0009.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Cer No 0010.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Cer No 0011.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Cer No 0008 (1).pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Cer No 0012.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Cer No 0013.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Cer No 0014.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Cer No 0015.pdf14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Certificates of CA (Form 5).pdf9 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Certificates of CA (Form 5)(2).pdf9 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold- Booked Inventrory.pdf7 Aug 2021
Certificates of CA (Form 3)File: form 3.pdf7 Aug 2021
Building plan approvalFile: SHEET 1_compressed (1).pdf2 Jun 2021
Building plan approvalFile: SHEET 2_compressed (1).pdf2 Jun 2021
Building plan approvalFile: SHEET 3_compressed (1).pdf2 Jun 2021
Building plan approvalFile: SHEET 4_compressed (1).pdf2 Jun 2021
Building plan approvalFile: SHEET 5_compressed (1).pdf2 Jun 2021
Building plan approvalFile: SHEET 6_compressed (1).pdf2 Jun 2021
Building plan approvalFile: SHEET 7_compressed.pdf2 Jun 2021
Building plan approvalFile: SHEET 10_compressed.pdf2 Jun 2021
Building plan approvalFile: SHEET 11_compressed.pdf2 Jun 2021
Building plan approvalFile: SHEET 12_compressed.pdf2 Jun 2021
Building plan approvalFile: SHEET 13_compressed.pdf2 Jun 2021
Building plan approvalFile: SHEET 14_compressed.pdf2 Jun 2021
Building plan approvalFile: SHEET 15_compressed.pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 1_compressed (1).pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 2_compressed (1).pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 3_compressed (1).pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 4_compressed (1).pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 5_compressed (1).pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 6_compressed (1).pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 7_compressed.pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 10_compressed.pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 11_compressed.pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 12_compressed.pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 13_compressed.pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 14_compressed.pdf2 Jun 2021
Building Plan Approval (IOD)File: SHEET 15_compressed.pdf2 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer's Certificate_compressed.pdf2 Jun 2021
Layout approvalFile: Commecement certificate 2021_compressed.pdf1 Jun 2021
Copy of Layout Approval (in case of layout)File: Commecement certificate 2021_compressed.pdf1 Jun 2021

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
36 GreensP51500050638NEAR 30 GREENS, Aurangabad35Apr 2023Certificate SignedNov 2027Not due yet
180 and 51 greensgut no 39 satara parisar aurangabad--CompletedJan 2024Late, May 2025
108 Green Heights and 50 GreensGut no 41 Opposite Kamal Nayan Bajaj Hospital Beed By pass Road Village Satara Tq and Dist Aurangabad108-CompletedJan 2014Late, Jan 2015
30 Greens30 Greens gut no 33 and 35 Golwadi Paithan Road Aurangabad--CompletedOct 2012Late, Dec 2012

How this compares with Aurangabad

0%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 6 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep 180 and 51 Greens on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Satara Aurangabad1,400+ in Aurangabad

Builder: A.M.PATEL INFRA PVT LTD

A.M.PATEL INFRA PVT LTD has 2 registrations on MahaRERA, including 180 and 51 Greens and 36 Greens. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that 180 and 51 Greens shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if 180 and 51 Greens is delayed beyond 31 Jan 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 180 and 51 Greens?

The registered promoter entity is A.M.PATEL INFRA PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 180 and 51 Greens?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 180 and 51 Greens?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 180 and 51 Greens?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 180 and 51 Greens?

The professionals named in the filing: Architect: MR MANOJ KALA; Architect: MR SHOURYA PATEL; Architect: MANOJ KALA; Engineer: SAINATH SUKHDEV MHASKE; Chartered Accountant: V R AMIN AND ASSOCIATES; Chartered Accountant: ABHIJEET PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 180 and 51 Greens?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 180 and 51 Greens. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 180 and 51 Greens to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.