Home / Browse projects / Aurangabad, Maharashtra / Mulay I Square
Mulay I Square
By Gangamai Industries and constructions Limited AND Nirman Constructions JV
RG-MH-01640 · RERA P51500005118 · Last updated on MahaRERA portal: 13 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mulay I Square is a Commercial project by Gangamai Industries and constructions Limited AND Nirman Constructions JV in Aurangabad, Maharashtra, registered with MahaRERA as P51500005118 on 9 Aug 2017. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 36 months from the original filing. 35 of the 185 units on this registration are recorded sold or booked, and 7 of 33 construction stages are filed complete.
At a glance
Project
- NameMulay I Square
- TypeCommercial
- Location
- Jogeshwari Road
- K Sector
- Near Endurance Plant
- Gangapur
- Aurangabad
- 431133
- Pincode431133
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500005118
- ReraGenie IDRG-MH-01640
Builder
- NameGangamai Industries and constructions Limited AND Nirman Constructions JV
- Entity typePartnership
- PartnersGangamai Industries and Construction Limited, Nirmangold Structures Private Limited
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Aug 2017
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Mar 2023)
- Buildings3 building records
- Documents filed88 files
Current status
Figures as on 13 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 6 | NA | 4 | 4 | 0 | 47 | 47 |
| Building No 5 | NA | 2 | 2 | 0 | 14 | 14 |
| Building No 1 | NA | 3 | 3 | 0 | 124 | 124 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 97%.
Building No 60%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 52%
| Activity | Progress |
|---|---|
| Excavation | 12% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 10% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 196%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97% |
| Sanitary Fittings within the flats / premises | 92% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 94% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 76% |
Progress on shared amenities15
As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 72% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 90% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 70% |
| Solid Waste Management And Disposal | Yes | 70% |
| Water conservation /Rain water harvesting | Yes | 70% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building No 1 | NA | Rs 11.92 cr | Rs 11.92 cr |
| Building No 5 | NA | Rs 4.36 cr | Rs 3.98 cr |
| - | NA | Rs 3.41 cr | Rs 1.72 cr |
| Building No 6 | NA | Rs 1.30 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sudhir P Kulkarni |
| Architect | Sthapatya Group & Associates |
| Engineer | Kaustubh Vijaykumar Mande |
| Engineer | Mohammed Ismail Plan Well Consultants |
| Engineer | Sthapatya Group & Associates |
| Chartered Accountant | R O Heda & Co |
| Chartered Accountant | Nikhil N Loya |
| Partner | Role in project |
|---|---|
| Gangamai Ind. & Constn. Limited-Nirman Gold Structures | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have completed 80% of the project constructions. However for balance cnstruction and completion from Muncipal corporation further extension required. Till the date only 10 bookings received and all constructions have been made through own funds till the date.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Gangamai Nirman JV_Mar 26_11zon (1).pdf | 13 May 2026 |
| Withdrawal Update Form 2File: Form 2_Gangamai Nirman JV_Mar 26.pdf | 13 May 2026 |
| Withdrawal Update Form 3File: Form 3_Gangamai Nirman JV_Mar 26_signed.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: Form 1_Gangamai Nirman JV_Dec 25.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Form 2_Gangamai Nirman JV_Dec 25.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: Form 3_Gangamai Nirman JV_Dec 25_signed.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: Form 1_Sept 2025_Signed.pdf | 5 Nov 2025 |
| Withdrawal Update Form 2File: Form 2_Sept 2025.pdf | 5 Nov 2025 |
| Withdrawal Update Form 3File: Gangamai_Form 3_Sept 25_Signed.pdf | 5 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5_24-25_Signed.pdf | 5 Nov 2025 |
| Withdrawal Update Form 1File: Form 1_NGSPL_June 25.pdf | 23 Jul 2025 |
| Withdrawal Update Form 1File: Form 1_NGSPL_June 25.pdf | 23 Jul 2025 |
| Withdrawal Update Form 1File: Form 1_NGSPL_June 25.pdf | 23 Jul 2025 |
| Withdrawal Update Form 1File: Form 1_NGSPL_June 25.pdf | 23 Jul 2025 |
| Withdrawal Update Form 1File: Form 1_NGSPL_June 25.pdf | 23 Jul 2025 |
| Withdrawal Update Form 1File: Form 1_NGSPL_June 25.pdf | 23 Jul 2025 |
| Withdrawal Update Form 1File: Form 1_NGSPL_June 25.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_NGSPL_Jun 2025.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_NGSPL_Jun 2025.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_NGSPL_Jun 2025.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_NGSPL_Jun 2025.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_NGSPL_Jun 2025.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_NGSPL_Jun 2025.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_NGSPL_Jun 2025.pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: Form 3_Gangamai NGSPL_June 25_Signed.pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: Form 3_Gangamai NGSPL_June 25_Signed.pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: Form 3_Gangamai NGSPL_June 25_Signed.pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: Form 3_Gangamai NGSPL_June 25_Signed.pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: Form 3_Gangamai NGSPL_June 25_Signed.pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: Form 3_Gangamai NGSPL_June 25_Signed.pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: Form 3_Gangamai NGSPL_June 25_Signed.pdf | 23 Jul 2025 |
| Form 1File: FORM 1.pdf | 20 Jul 2025 |
| Form 2File: FORM 2.pdf | 20 Jul 2025 |
| Form 3File: Gangamai_Form3 _Mar 25_Signed & Scanned.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventary_Mar-25.pdf | 20 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_MULAY_I_SQUARE_2023_24_SIGNED SCANNED.pdf | 25 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_23-24.pdf | 15 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Nirman Gangamai JV_Mar 24_opt.pdf | 14 Feb 2025 |
| Certificates of CA (Form 3)File: Form - 3_Mar 2024.pdf | 14 Feb 2025 |
| Certificates of CA (Form 3)File: Form - 3_ June 2024.pdf | 14 Feb 2025 |
| Certificates of CA (Form 3)File: Form - 3_Sept 2024.pdf | 14 Feb 2025 |
| Certificates of CA (Form 3)File: Form - 3_Dec 2024.pdf | 14 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_ Nirman Gangamai JV_mar 2024.pdf | 14 Feb 2025 |
| CERSAI detailsFile: Asset Based Search2_2.pdf | 9 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf | 8 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf | 8 Feb 2024 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf | 8 Feb 2024 |
| Proforma of Allotment letterFile: model Allotment_letter.pdf | 8 Feb 2024 |
| Proforma of Agreement for saleFile: Agreement to sale.pdf | 8 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation report wrt allotment letter.pdf | 8 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation reprot wrt agreement to sale.pdf | 8 Feb 2024 |
| Declaration in FORM BFile: Form B.pdf | 5 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect certificate building 1 5 6.pdf | 5 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf | 5 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019 20.pdf | 5 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020 21.pdf | 5 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021 22.pdf | 5 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022 23.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Booked Inventory.pdf | 5 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 5 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisation.pdf | 5 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Separate bank account.pdf | 5 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018_19.pdf | 18 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019_20.pdf | 18 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020_21.pdf | 18 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021_22.pdf | 18 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022_23.pdf | 18 Jan 2024 |
| Declaration in FORM BFile: RERA Form B.pdf | 11 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Enginner Certificate.pdf | 11 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Mar 2020 .pdf | 11 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Mar 2021.pdf | 11 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Mar 2022.pdf | 11 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Mar 2023.pdf | 11 Jan 2024 |
| Certificates of CA (Form 5)File: NGSPL Form 5 Scanned.pdf | 1 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: NGSPL-ilovepdf-compressed (1).pdf | 24 Apr 2018 |
| Layout approvalFile: Layout Plan.pdf | 31 Jul 2017 |
| Building plan approvalFile: Building Approval (new).pdf | 31 Jul 2017 |
| PAN CardFile: PAN.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: Work order compressed.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: Declaration Encobrances.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mulay I Square on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near K Sector, Near Endurance Plant1,400+ in Aurangabad
Bhanudas Nagar Phase II
Ninad Narendra Khoche
Bhanudas Nagar Phase-I
Joshi Associates
SUNRISE VILLE
AMAR BABASAHEB JADHAV
CHHATRAPATI NAGAR
CHHATRAPATI BUILDERS & DEVELOPERS
MAYUR PARK
K P RESIDENCY
SARA SANGAM KAVERI BUILDING
JAGRUT SARA ASSOCIATES
See every Aurangabad project, with the district possession charts
Builder: Gangamai Industries and constructions Limited AND Nirman Constructions JV
Gangamai Industries and constructions Limited AND Nirman Constructions JV has 1 registration on MahaRERA, including Mulay I Square. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that Mulay I Square shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Mulay I Square is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mulay I Square?
The registered promoter entity is Gangamai Industries and constructions Limited AND Nirman Constructions JV, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mulay I Square?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mulay I Square?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mulay I Square?
The professionals named in the filing: Architect: Sudhir P Kulkarni; Architect: Sthapatya Group & Associates; Engineer: Kaustubh Vijaykumar Mande; Engineer: Mohammed Ismail Plan Well Consultants; Engineer: Sthapatya Group & Associates; Chartered Accountant: R O Heda & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mulay I Square?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback