ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / GOLOK CARNATION

Registered No litigation declared Residential / Group Housing project

GOLOK CARNATION

By GOLOK DEVELOPERS

RG-MH-01535 · RERA P51500005262 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
32 of 66Construction stages doneacross 6 buildings; furthest along: Sanitary Fittings within the flats /..., 85%
69 of 140Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

GOLOK CARNATION is a Residential / Group Housing project by GOLOK DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500005262 on 11 Aug 2017. Possession is promised by 30 Dec 2026. 71 of the 140 units on this registration are recorded sold or booked, and 32 of 66 construction stages are filed complete.

At a glance

Project

  • NameGOLOK CARNATION
  • TypeResidential / Group Housing
  • Location
    • Gut No. 52/01
    • Wadgaon Kolhati (CT)
    • Aurangabad
    • 431136
  • Pincode431136
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500005262
  • ReraGenie IDRG-MH-01535

Builder

  • NameGOLOK DEVELOPERS
  • Entity typePartnership
  • PartnerULHAS JAGANNATH INGALE

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings6 building records
  • Documents filed54 files

Current status

51%71 of 140 units booked
89.8%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A AND BNA8724024
WING C AND DNA8724024
WING E AND FNA8724024
WING I AND J AND KNA9840040
WING G AND HNA8724024
WING LNA11404

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 85%.

WING A AND B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C AND D38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure14%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING E AND F90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING I AND J AND K65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
WING G AND H90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING L55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes35%
Storm Water DrainsYes5%
Landscaping & Tree PlantingYes10%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes25%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes35%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes60%

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Open Space64
BuildingOpen SpaceTotal
WING A AND B1212
WING C AND D1212
WING E AND F1212
WING I AND J AND K1616
WING G AND H1212

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
JAYESH CHANDRAKANT WALIMBEAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED, WALUJ MAHANAGAR, AURANGABAD
Permissible FSI7161.84
Proposed, not sanctioned7,162 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANCHAN CHAMBERS, KRANTI CHOWK, STATION ROAD, AURANGABAD
Estimated costRs 12.64 cr
Cost incurredRs 11.35 cr
Work done89.81%
BuildingWingEstimatedIncurred
WING I AND J AND KNARs 3.36 crRs 3.14 cr
WING A AND BNARs 2.04 crRs 1.90 cr
WING C AND DNARs 2.04 crRs 1.90 cr
WING E AND FNARs 2.04 crRs 1.90 cr
WING G AND HNARs 2.04 crRs 1.90 cr
-NARs 1.01 crRs 48.52 lakh
WING LNARs 12.39 lakhRs 11.58 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOJ K KALA
ArchitectRahul S Badhe
EngineerNAMDEV GOVINDRAO KARKHANE
EngineerSandeep Bhavsar
Chartered AccountantSaurabh Agrawal
Chartered AccountantCA Sheekant P Thorat
PartnerRole in project
GOLOK DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arch Certificate.pdf9 Jun 2026
Withdrawal Update Form 2File: Eng certificate.pdf9 Jun 2026
Withdrawal Update Form 3File: Q4 of 25-26 Golok compressed.pdf9 Jun 2026
Form 1File: Q3 of 25-26.pdf4 Mar 2026
Form 2File: Q3 of 25-26.pdf4 Mar 2026
Form 3File: Q3 of 25-26_compressed.pdf4 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q3 of 25-26.pdf4 Mar 2026
Form 1File: Q2 of 25-26.pdf6 Oct 2025
Form 2File: Q2 of 25-26.pdf6 Oct 2025
Form 3File: Q2 of 25-26 Golok.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: Q2 of 25-26.pdf6 Oct 2025
Form 1File: Q1 of 24-25.pdf30 Sep 2025
Form 2File: Q1 of 24-25.pdf30 Sep 2025
Form 3File: Q1 of 24-25 Golok.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q1 of 24-25.pdf30 Sep 2025
Form 1File: Q2 of 24-25.pdf30 Sep 2025
Form 2File: Q2 of 24-25.pdf30 Sep 2025
Form 3File: Q2 of 24-25 Golok.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q2 of 24-25.pdf30 Sep 2025
Form 1File: Q3 of 24-25.pdf30 Sep 2025
Form 2File: Q3 of 24-25.pdf30 Sep 2025
Form 3File: Q3 of 24-25 Golok.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q3 of 24-25.pdf30 Sep 2025
Form 1File: Q4 of 24-25.pdf30 Sep 2025
Form 2File: Q4 of 24-25.pdf30 Sep 2025
Form 3File: Q4 of 24-25 Golok.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q4 of 24-25.pdf30 Sep 2025
Form 1File: Q1 of 25-26.pdf30 Sep 2025
Form 2File: Q1 of 25-26.pdf30 Sep 2025
Form 3File: Q1 of 25-26 Golok.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q1 of 25-26.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 Scanned.pdf30 Sep 2025
Copy of the legal title reportFile: TITLE SEARCH REPORT.pdf31 Jul 2017
Details of encumbrancesFile: TITLE SEARCH REPORT.pdf31 Jul 2017
Declaration in FORM BFile: FORM B FIRM.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: img215.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: img216.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: img217.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: img218.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 1.pdf31 Jul 2017
Certificates of CA (Form 3)File: Gholok RERA Cert (1).pdf31 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf31 Jul 2017
Proforma of Allotment letterFile: AGREEMENT TO SALE DRAFT - COMPRESSED.pdf31 Jul 2017
Layout approvalFile: Layout 1.pdf30 Jul 2017
Layout approvalFile: Layout 2.pdf30 Jul 2017
Building plan approvalFile: Layout 1.pdf30 Jul 2017
Building plan approvalFile: Layout 2.pdf30 Jul 2017
PAN CardFile: FIRM PAN PDF.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout 1.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout 2.pdf30 Jul 2017
Building Plan Approval (IOD)File: Layout 1.pdf30 Jul 2017
Building Plan Approval (IOD)File: Layout 2.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf30 Jul 2017

How this compares with Aurangabad

51%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep GOLOK CARNATION on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadgaon Kolhati (CT)1,400+ in Aurangabad

Builder: GOLOK DEVELOPERS

GOLOK DEVELOPERS has 1 registration on MahaRERA, including GOLOK CARNATION. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if GOLOK CARNATION is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOLOK CARNATION?

The registered promoter entity is GOLOK DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOLOK CARNATION?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOLOK CARNATION?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOLOK CARNATION?

The professionals named in the filing: Architect: MANOJ K KALA; Architect: Rahul S Badhe; Engineer: NAMDEV GOVINDRAO KARKHANE; Engineer: Sandeep Bhavsar; Chartered Accountant: Saurabh Agrawal; Chartered Accountant: CA Sheekant P Thorat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOLOK CARNATION?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOLOK CARNATION. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOLOK CARNATION to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.