PMAY U Tisgaon 227 A

By Unity Developers

RG-MH-31614 · RERA P51500079949 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 60 months from the original
7 of 77Construction stages doneacross 7 buildings; furthest along: Basement (if any), 0%
784 of 784Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

PMAY U Tisgaon 227 A is a Residential / Group Housing project by Unity Developers in Aurangabad, Maharashtra, registered with MahaRERA as P51500079949 on 7 Apr 2025. Possession is promised by 31 Dec 2030. The completion date has moved by 60 months from the original filing. 0 of the 784 units on this registration are recorded sold or booked, and 7 of 77 construction stages are filed complete.

At a glance

Project

  • NamePMAY U Tisgaon 227 A
  • TypeResidential / Group Housing
  • Location
    • Gut no. 227/1 part
    • Mauje Tisgaon
    • Tisgaon
    • Aurangabad
    • 431102
  • Pincode431102
  • RERA no.P51500079949
  • ReraGenie IDRG-MH-31614

Builder

  • NameUnity Developers
  • Entity typePartnership
  • Other registrations12 more →
  • Completed5 of 13
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredApr 2025First promiseDec 2025Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Apr 2025
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 31 Dec 2025)
  • Buildings7 building records
  • Documents filed45 files

Current status

0%0 of 784 units booked
0.7%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1A2NA881120112
A3A4NA881120112
A5A6NA881120112
A7A8NA881120112
A9A10NA881120112
A11A12NA881120112
A13A14NA881120112

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Basement (if any), at 0%.

A1A29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A3A49%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A5A69%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A7A89%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A9A109%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A11A129%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A13A149%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed577

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots577
Open Space577
BuildingOpen SpaceTotal
A1A28383
A3A48383
A5A68383
A7A88282
A9A108282
A11A128282
A13A148282

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area19,878 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2025
LandownerVillageDistrict
Chhatrapati Sambhajinagar Municial CorporationAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityChhatrapati Sambhajinagar Municipal Corporation
Permissible FSI29792.98
Proposed, not sanctioned29,793 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChetan Trade Centre Opp saint Fransis high School Jalna roadAurangabad JALNA ROAD AKASHWANI CETAN TRADE CENTRE PIN 431001
Estimated costRs 74.04 cr
Cost incurredRs 51.89 lakh
Work done0.7%
BuildingWingEstimatedIncurred
A1A2NARs 9.88 crRs 7.41 lakh
A3A4NARs 9.88 crRs 7.41 lakh
A5A6NARs 9.88 crRs 7.41 lakh
A7A8NARs 9.88 crRs 7.41 lakh
A9A10NARs 9.88 crRs 7.41 lakh
A11A12NARs 9.88 crRs 7.41 lakh
A13A14NARs 9.88 crRs 7.41 lakh
-NARs 4.85 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Swapnil Shroff
EngineerSurve Samarth Chandrakant
Chartered AccountantCA Yash Nagar
PartnerRole in project
Unity Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01012619220Dec 2025 → Dec 2030

Reason as filed by the promoterWe request an extension of the project timeline as per RERA due to the delay in receiving the official work order from the concerned government authorities, despite our continuous follow-ups. As the work order is essential to begin and progress the project, we seek additional time to ensure successful completion once the order is issued. We appreciate your consideration.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Tisgaon 227 A UD Form 1 Signed.PDF12 May 2026
Withdrawal Update Form 2File: Tisgaon 227 A UD Form 2 Signed.PDF12 May 2026
Withdrawal Update Form 3File: Tisgaon 227A.pdf12 May 2026
Withdrawal Update Form 1File: Tisgaon Gut No 227 1 A Form 1.PDF20 Jan 2026
Withdrawal Update Form 2File: Tisgaon Gut No 227 1 A Form 2.PDF20 Jan 2026
Withdrawal Update Form 3File: Form 3 - Tisgaon 227 A 2025-26 Q3_.pdf20 Jan 2026
Withdrawal Update Form 1File: Unity Developers - Tisgaon Gut No 227-1 Block A - Form 1.pdf27 Oct 2025
Withdrawal Update Form 2File: Unity Developers - Tisgaon Gut No 227-1 Block A - Form 2.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf27 Oct 2025
Withdrawal Update Form 1File: Form 1 227 A.pdf24 Jul 2025
Withdrawal Update Form 2File: Form 2 227 A.pdf24 Jul 2025
Withdrawal Update Form 3File: Tisgaon 227-1 Block A Form 3.pdf24 Jul 2025
Copy of the legal title reportFile: RERA SEARCH REPORT GUT NO 227 Tisgaon New.pdf31 Mar 2025
Proforma of Allotment letterFile: NEW ALLOTMENT LETTER.pdf24 Mar 2025
Other - LegalFile: Tisgaon 227-1 7-12_1.pdf24 Mar 2025
Other - LegalFile: UNITY DEVELOPERS_1.pdf24 Mar 2025
Other - FinanceFile: Form 3 Declaration 227 A.pdf24 Mar 2025
Other - FinanceFile: Workorder Tisgaon 227-1.pdf24 Mar 2025
Other - TechnicalFile: Annexure A.PDF24 Mar 2025
Other - TechnicalFile: CC Tisgaon 227A.pdf24 Mar 2025
Proforma of Agreement for saleFile: NEW AGREEMENT TO SALE.pdf24 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: fORMAT B BANK.pdf24 Mar 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Merged.pdf13 Mar 2025
Declaration in FORM BFile: FORM B - Developer New Revised Upload.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tisgaon 227 A Form 3 Upload.pdf13 Mar 2025
Other - LegalFile: Annexure A.PDF13 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 227 A.pdf13 Mar 2025
Declaration about Commencement CertificateFile: Decleration of Commencement Certificate Upload.pdf13 Mar 2025
CERSAI detailsFile: Cersai Declaration.PDF13 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about RERA Designated Bank Accounts for real estate projects.PDF13 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.PDF13 Mar 2025
Details of encumbrances concerned to LegalFile: Encumbrance Merged.pdf13 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.PDF13 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Merged.pdf13 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for securedunsecured finance availed for the project.PDF13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Unity 227-1 Block A.PDF10 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Gmail - 76 08 SANTION BP POROPSAL 05032025 PMAY.pdf10 Mar 2025
CERSAI detailsFile: 227 A.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Upload.pdf7 Mar 2025
Layout approvalFile: Layout.pdf5 Mar 2025
Building plan approvalFile: Building Plan.pdf5 Mar 2025
PAN CardFile: PAN Unity Developers.pdf5 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout.pdf5 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Uploaded.pdf5 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf5 Mar 2025

How this compares with Aurangabad

0%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 60 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep PMAY U Tisgaon 227 A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mauje Tisgaon1,400+ in Aurangabad

Builder: Unity Developers

UNITY DEVELOPERS has 13 registrations on MahaRERA, including MONITA PARK A BUILDING and MONITA PARADISE. Its filings disclose 8 earlier MahaRERA projects: declares 5 of 8 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if PMAY U Tisgaon 227 A is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PMAY U Tisgaon 227 A?

The registered promoter entity is Unity Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PMAY U Tisgaon 227 A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PMAY U Tisgaon 227 A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PMAY U Tisgaon 227 A?

The professionals named in the filing: Architect: Ar. Swapnil Shroff; Engineer: Surve Samarth Chandrakant; Chartered Accountant: CA Yash Nagar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PMAY U Tisgaon 227 A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PMAY U Tisgaon 227 A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PMAY U Tisgaon 227 A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.