NABHRAJ NANDANVAN PHASE III

By Nabhraj Construction

RG-MH-08337 · RERA P51500021357 · Last updated on MahaRERA portal: 25 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
49 of 55Construction stages doneacross 5 buildings; furthest along: Installation of Lifts, 95%
33 of 168Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 181 documents Report an error

NABHRAJ NANDANVAN PHASE III is a Residential / Group Housing project by Nabhraj Construction in Aurangabad, Maharashtra, registered with MahaRERA as P51500021357 on 24 Jun 2019. Possession was promised by 29 Jun 2026 and is now 4 months past that date. The completion date has moved by 11 months from the original filing. 135 of the 168 units on this registration are recorded sold or booked, and 49 of 55 construction stages are filed complete.

At a glance

Project

  • NameNABHRAJ NANDANVAN PHASE III
  • TypeResidential / Group Housing
  • Location
    • GUT NO 734
    • CHIKALTHANA
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431210
  • Pincode431210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500021357
  • ReraGenie IDRG-MH-08337

Builder

  • NameNabhraj Construction
  • Entity typePartnership
  • PartnerAkash Rajesh Butole
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

4 months past promisethis monthRegisteredJun 2019First promiseJul 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Jun 2019
  • Promised completion29 Jun 2026
  • Revised completionRevised to 29 Jun 2026 (originally 31 Jul 2025)
  • Buildings5 building records
  • Documents filed181 files

Current status

80%135 of 168 units booked
100.0%Work done, per cost certificate

Figures as on 25 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA15728028
WING DNA15756056
WING ENA15728028
WING ANA15728028
WING BNA15728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 25 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

49 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 95%.

WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING E90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed103

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots103
Closed/Covered52
Open Space51
BuildingClosed/CoveredOpen SpaceTotal
WING C141428
WING D17724
WING E707
WING A71522
WING B71522

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,880 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024
LandownerVillageDistrict
RAVINDERPALSINGH MATHARUAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityChhatrapati Sambhajinagar Municipal Corporation, Chhatrapati Sambhajinagar
Permissible FSI10733.46
Proposed, not sanctioned6,490 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGARKHEDA ROAD, CIDCO, AURANGABAD
Estimated costRs 106.07 cr
Cost incurredRs 106.07 cr
Work done100.0%
BuildingWingEstimatedIncurred
WING CNARs 20.84 crRs 20.84 cr
WING DNARs 20.84 crRs 20.84 cr
WING ENARs 20.84 crRs 20.84 cr
WING ANARs 20.84 crRs 20.84 cr
WING BNARs 20.84 crRs 20.84 cr
-NARs 1.87 crRs 1.87 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAKW ASSOCIATES
EngineerPiyush Lohade
Chartered AccountantR. B. Sharma & Co
Chartered AccountantR D PATHAN & ASSOCIATES
Chartered AccountantSACHIN TOTALA and CO
PartnerRole in project
Nabhraj Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08072502002Jul 2025 → Jun 2026

Reason as filed by the promoterThe said building Advertisement received from MIHADA is in April 2024 So the said project is under Completion Activity. Due to which the Completion of NABHRAJ NANDATWAN PHASE III P51500021357 is delayed in the due process we have handed over the Possession of Units to All Purchasers. And they have also accepted the same. All Allottees have been agreed taken the possession of the project and individual conveyance done from Promoter. Hence, we request the Authority for accepting our Application for Extension and permitting the same. So we have taken the consent from Building E Allottees and we r

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed181

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 181 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 JUN 26.pdf25 Jul 2026
Withdrawal Update Form 2File: FORM-2 JUN 26.pdf25 Jul 2026
Withdrawal Update Form 3File: FORM-3 JUN 26.pdf25 Jul 2026
Withdrawal Update Form 1File: Form 1 Phase III Mar 26.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 Phase III Mar 26.pdf28 Apr 2026
Withdrawal Update Form 3File: Form-3 Phase III Mar 26.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 01 Phase III Dec 25.pdf6 Apr 2026
Withdrawal Update Form 1File: Form 01 Arch Phase III June 2025.pdf6 Apr 2026
Withdrawal Update Form 1File: Form 1 Arch Phase III Sep 25.pdf6 Apr 2026
Withdrawal Update Form 2File: Form 02 Phase III Dec 25.pdf6 Apr 2026
Withdrawal Update Form 2File: Form 02 Phase III Dec 25.pdf6 Apr 2026
Withdrawal Update Form 2File: Form 2 Egg Phase 3 Sep 25.pdf6 Apr 2026
Withdrawal Update Form 3File: FORM-3 P-III.pdf6 Apr 2026
Withdrawal Update Form 3File: FORM-3 P-III.pdf6 Apr 2026
Withdrawal Update Form 3File: Form 3 and Declaration_merged.pdf6 Apr 2026
Withdrawal Update Form 1File: Form 1 Arch Phase III Sep 25.pdf13 Mar 2026
Withdrawal Update Form 1File: Form 01 Phase III Dec 25.pdf13 Mar 2026
Withdrawal Update Form 2File: Form 2 Egg Phase 3 Sep 25.pdf13 Mar 2026
Withdrawal Update Form 2File: Form 02 Phase III Dec 25.pdf13 Mar 2026
Withdrawal Update Form 3File: Form-3 Sep 25 (Merged).pdf13 Mar 2026
Withdrawal Update Form 3File: FORM-3 P-III.pdf13 Mar 2026
Withdrawal Update Form 1File: Form 1 Arch Phase III Sep 25.pdf27 Feb 2026
Withdrawal Update Form 2File: Form 2 Egg Phase 3 Sep 25.pdf27 Feb 2026
Withdrawal Update Form 3File: Form-3 Sep 25 (Merged).pdf27 Feb 2026
Form 1File: 1 From 1 Dec 19.pdf26 May 2025
Form 2File: 2 Form 2 Dec 19.pdf26 May 2025
Form 3File: 3 Form 3 Dec 19.pdf26 May 2025
Form 1File: Form-1 Dec 19.pdf24 May 2025
Form 2File: Form-2 Dec 19.pdf24 May 2025
Form 3File: Form-3Declaration Dec 19.pdf24 May 2025
Form 3File: Form-3Declaration June 20.pdf24 May 2025
Form 1File: Form-1 June 20.pdf24 May 2025
Form 2File: Form-2 June 20.pdf24 May 2025
Form 2File: Form-2 Sep 20.pdf24 May 2025
Form 1File: Form-1 Sep 20.pdf24 May 2025
Form 3File: Form-3Declaration Sep 20.pdf24 May 2025
Form 1File: 2 Form 1 Jun 19.pdf24 May 2025
Form 2File: 7 FORM 2 JUN 19.pdf24 May 2025
Form 3File: 1 FORM 1 JUN 19.pdf24 May 2025
Form 1File: 3 Form 1 Sep 19.pdf24 May 2025
Form 3File: 2 FORM 3 SEP 19.pdf24 May 2025
Form 2File: 8 SEP 19 Form 2.pdf24 May 2025
Form 1File: 4 Form 1 Mar 20.pdf24 May 2025
Form 2File: 9 FORM 2 MAR 20.pdf24 May 2025
Form 3File: 3 FORM MAR 20.pdf24 May 2025
Form 1File: 6 Form 1 Mar 21.pdf24 May 2025
Form 2File: 11 FORM 2 MAR 21.pdf24 May 2025
Form 3File: 5 FORM 3 MAR 21.pdf24 May 2025
Form 1File: 9 Dec 21 Form 1.pdf24 May 2025
Form 2File: 14 FORM 2 DEC 21.pdf24 May 2025
Form 3File: 6 FORM 3 DEC 21.pdf24 May 2025
Form 1File: 10 Form 1 Mar 22.pdf24 May 2025
Form 2File: 15 FORM 2 MAR 22.pdf24 May 2025
Form 3File: 7 FORM 3 MAR 22.pdf24 May 2025
Form 1File: 13 Form 1 Dec 22.pdf24 May 2025
Form 2File: 18 FORM 2 DEC 22.pdf24 May 2025
Form 3File: 8 FORM 3 DEC 22.pdf24 May 2025
Form 1File: 14 Form 1 Mar 23.pdf24 May 2025
Form 2File: 19 FORM 2 MAR 23.pdf24 May 2025
Form 3File: 9 FORM 3 MAR 23.pdf24 May 2025
Form 1File: 15 Form 1 Jun 23.pdf24 May 2025
Form 2File: 20 FORM 2 JUN 23.pdf24 May 2025
Form 3File: 10 FORM 3 JUN 23.pdf24 May 2025
Form 1File: 16 Form 1 Sep 23.pdf24 May 2025
Form 2File: 21 FORM 2 SEP 23.pdf24 May 2025
Form 3File: 11 FORM 3 SEP 23.pdf24 May 2025
Form 1File: 17 Form 1 Dec 24.pdf24 May 2025
Form 2File: 22 FORM 2 DEC 23.pdf24 May 2025
Form 3File: 12 FORM 3 DEC 23.pdf24 May 2025
Form 1File: 18 Form 1 Mar 24.pdf24 May 2025
Form 2File: 23 FORM 2 MAR 24.pdf24 May 2025
Form 3File: 13 FORM 3 MAR 24.pdf24 May 2025
Form 1File: 19 Form 1 Jun 24.pdf24 May 2025
Form 2File: 24 FORM 2 JUN 24.pdf24 May 2025
Form 3File: 14 FORM 3 JUN 24.pdf24 May 2025
Form 1File: 20 Form 1 Sep 24.pdf24 May 2025
Form 2File: 25 FORM 2 SEP 24.pdf24 May 2025
Form 3File: 15 FORM 3 SEP 24.pdf24 May 2025
Form 1File: 21 Form 1 Dec 24.pdf24 May 2025
Form 2File: 26 FORM 2 DEC 24.pdf24 May 2025

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Nabhraj Nandanvan Phase IIgut no. 734 opp. airport Chikalthana Aurangabad56CompletedMay 2018May 2018
NABHRAJ LALITYACTS NO 145141 AND 145145 OSMANPURA AURANGABAD14CompletedDec 2016Dec 2016
NABHRAJ NANDANVANGUT NO 735 CHIKALTHANA AURANGABAD16CompletedApr 2015Apr 2015
NABHRAJ NESTCTS NO 16624 SBH OSMANPURA AURANGABAD7CompletedJun 2013Jun 2013

How this compares with Aurangabad

80%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 11 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep NABHRAJ NANDANVAN PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHIKALTHANA1,400+ in Aurangabad

2 kmNABHRAJ NANDANVAN PHASE Completed 14Lapsed / revoked 2Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: Nabhraj Construction

Nabhraj Construction has 5 registrations on MahaRERA, including SHREE BALAJI ENCLAVE and Nabhraj Nandanvan Phase II. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that NABHRAJ NANDANVAN PHASE III shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NABHRAJ NANDANVAN PHASE III is delayed beyond 29 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NABHRAJ NANDANVAN PHASE III?

The registered promoter entity is Nabhraj Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NABHRAJ NANDANVAN PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NABHRAJ NANDANVAN PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NABHRAJ NANDANVAN PHASE III?

The professionals named in the filing: Architect: AKW ASSOCIATES; Engineer: Piyush Lohade; Chartered Accountant: R. B. Sharma & Co; Chartered Accountant: R D PATHAN & ASSOCIATES; Chartered Accountant: SACHIN TOTALA and CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NABHRAJ NANDANVAN PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NABHRAJ NANDANVAN PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NABHRAJ NANDANVAN PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.