Registered No litigation declared Residential / Group Housing project

Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar

By AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)

RG-MH-32081 · RERA P51500080227 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
0 of 187Construction stages doneacross 17 buildings; furthest along: Excavation, 0%
1,104 of 1,104Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar is a Residential / Group Housing project by AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) in Aurangabad, Maharashtra, registered with MahaRERA as P51500080227 on 9 May 2025. Possession is promised by 14 Mar 2029. 0 of the 1,104 units on this registration are recorded sold or booked, and 0 of 187 construction stages are filed complete.

At a glance

Project

  • NameConstruction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar
  • TypeResidential / Group Housing
  • Location
    • side road from Nisarga Nursury
    • Opposite of Khivsara Plotting Nakshtrawadi
    • Aurangabad
    • 431002
  • Pincode431002
  • RERA no.P51500080227
  • ReraGenie IDRG-MH-32081

Builder

  • NameAURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)
  • Entity typePublic Authority
  • Junior EngineerHameed Rafai
  • Other registrations8 more →
  • Completed2 of 9
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredMay 2025PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 May 2025
  • Promised completion14 Mar 2029
  • Revised completionNone
  • Buildings17 building records
  • Documents filed73 files

Current status

0%0 of 1,104 units booked

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA8790090
A2NA9790090
A3NA9790090
A4NA9790090
A5NA9784084
A6NA9784084
A7NA9784084
A8NA9784084
B1NA9748048
B2NA9742042
B3NA9742042
B4NA9742042
B5NA9748048
B6NA9748048
B7NA9742042
B8NA9748048
B9NA9748048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building17

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 187 construction stages are filed complete across 17 buildings. The stage furthest along is Excavation, at 0%.

A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1151

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,151
Closed/Covered1,151
BuildingClosed/CoveredTotal
A19393
A29393
A39393
A49393
A58989
A68989
A78989
A88989
B15151
B24545
B34545
B44545
B54848
B64848
B74545
B84848
B94848

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area64,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityChhatrapati Sabhajinagar Housing Area and Development Board
Permissible FSI54847.44
Proposed, not sanctioned54,847 sq m
Buildings approved17
Buildings sanctioned17

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAdalat Road,Kranti Chouk,Chhatrapati Sambhajinagar

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSudhakar Bahegavhankar
EngineerRishikesh Vyapari
Chartered AccountantMaya Pagare
PartnerRole in project
CHHATRAPATI SAMBHAJINAGAR HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 14 Mar 2029

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Rera Form MHADA.PDF28 Apr 2026
Form 2File: form2 1056.pdf28 Apr 2026
Form 3File: form 3 1056 (1).pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold unsold 1056_compressed.pdf28 Apr 2026
Self-declaration of Quarterly ProgressFile: 1056 1st.pdf28 Apr 2026
Self-declaration of Quarterly ProgressFile: 1056 2nd.pdf28 Apr 2026
Form 1File: Rera Form MHADA.PDF28 Apr 2026
Form 2File: form2 1056.pdf28 Apr 2026
Form 3File: form 3 1056 (1).pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold unsold 1056_compressed.pdf28 Apr 2026
Form 1File: form 1 1056 qpr.pdf16 Jan 2026
Form 2File: form 2 1056 qpr.pdf16 Jan 2026
Form 3File: form 3 1056 qpr.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: DIsclosure of Sold -Booked Inventory 1056 qpr.pdf16 Jan 2026
Form 1File: Form 1.pdf11 Dec 2025
Form 2File: Form 2.pdf11 Dec 2025
Form 3File: Form 3 Q1.pdf11 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory_.pdf11 Dec 2025
Self-declaration of Quarterly ProgressFile: declaration_0001.pdf11 Dec 2025
Layout approvalFile: Layout Plan-.pdf5 May 2025
Copy of Layout Approval (in case of layout)File: Layout Plan-.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 latest.pdf2 May 2025
Other - LegalFile: Layout Plan.pdf2 May 2025
Other - FinanceFile: BP Cell to MahaRERA.pdf2 May 2025
Other - LegalFile: BP Cell to MahaRERA.pdf30 Apr 2025
Other - FinanceFile: Layout Plan.pdf30 Apr 2025
PAN CardFile: PAN.pdf24 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Nakshatrawadi Commencement Certificate.pdf24 Apr 2025
Declaration about Commencement CertificateFile: Declaration For Commencement Certificate.pdf24 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Declaration Format B.pdf24 Apr 2025
Building plan approvalFile: B5, B6,B8, B9.pdf22 Jan 2025
Building plan approvalFile: B3 and B7 BUA DRG.pdf22 Jan 2025
Building plan approvalFile: B1 BUA DRG (2).pdf22 Jan 2025
Building plan approvalFile: B2 and B4 BUA DRG.pdf22 Jan 2025
Building plan approvalFile: A8 BUA DRG s.pdf22 Jan 2025
Building plan approvalFile: A7 BUA DRG s.pdf22 Jan 2025
Building plan approvalFile: A6 BUA DRG s.pdf22 Jan 2025
Building plan approvalFile: A5 BUA DRG s.pdf22 Jan 2025
Building plan approvalFile: A2 -A4 BUA DRG s.pdf22 Jan 2025
Building plan approvalFile: A1 and A3 BUA DRG s.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: A1 and A3 BUA DRG s.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: A2 -A4 BUA DRG s.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: A5 BUA DRG s.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: A7 BUA DRG s.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: A8 BUA DRG s.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: B2 and B4 BUA DRG.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: B1 BUA DRG (2).pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: B3 and B7 BUA DRG.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: B5, B6,B8, B9.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: A6 BUA DRG s.pdf22 Jan 2025
Other - TechnicalFile: order 30 annexure A.pdf7 Jan 2025
Details of encumbrances concerned to FinanceFile: encumbrwnce.pdf6 Jan 2025
Details of encumbrances concerned to LegalFile: encumbrwnce.pdf6 Jan 2025
Building plan approvalFile: PLANS (1).pdf9 Dec 2024
Building plan approvalFile: PLANS (3).pdf9 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLANS (3).pdf9 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLANS (1).pdf9 Dec 2024
Building plan approvalFile: PLANS.pdf22 Nov 2024
Copy of the legal title reportFile: 09_UTARA_7-12_.pdf22 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: PLANS.pdf22 Nov 2024
Deviation Report with respect to Allotment letterFile: deviation.pdf22 Nov 2024
Deviation Report with respect to model copy of AgreementFile: deviation.pdf22 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Secured unsecured.pdf22 Nov 2024
Proforma of Allotment letterFile: ALLOTMENT.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf21 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about separate Bank Account for real estate projects.pdf21 Nov 2024
Proforma of Agreement for saleFile: ALLOTMENT.pdf21 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf21 Nov 2024
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE CERTIFICATE.pdf19 Nov 2024
CERSAI detailsFile: Undertaking No Cersai Report.pdf19 Nov 2024
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE CERTIFICATE.pdf19 Nov 2024
Declaration in FORM BFile: form b 1056.pdf18 Nov 2024

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late3 not delivered by the promised date3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Proposed construction of 60 L.I.G. T/s Scheme on Plot No. 03, Gut No. 736/Part, Chikalthana, AurangP51500054769Plot No. 03, Gut No. 736/Part, Chikalthana, Aurangabad, Aurangabad60Feb 2024OngoingDec 2029Not due yet
CONSTRUCTION OF 390 T-S LIG AND 16 SHOPS AT GUT NO 708-PART, CHIKALTHANA AURANGABADP51500034364OPPSITE AURANGABAD AIRPORT CHIKALTHANA, Aurangabad406Apr 2022OngoingDec 2027Not due yet
CONSTRUCTION OF 390 T-S LIG AND 16 SHOPS AT GUT NO 708-PART, CHIKALTHANA AURANGABADP51500034364OPPSITE AURANGABAD AIRPORT CHIKALTHANA, Aurangabad390Apr 2022OngoingDec 2027Not due yet
CONSTRUCTION OF 368 EWS T/S UNDER PMAY AND 168 MIG ON S.NO.68 AT PADHEGOAN ,DIST-AURANGABADP51500026531AURANGABAD, Aurangabad536Sep 2020CompletedMar 2026Jul 2024
Construction of 244 EWS and 70 Shops under PMAY Housing Scheme on land S. No. 17 at Ambejogai, BeedP52300049313Ambejogai, Beed244Feb 2023OngoingDec 2025Not delivered
Construction of 132 TS EWS Under PMAY and 48 TS LIG Scheme om S No 146 A at Hingoli dist HingoliP51200027577hingoli, Hingoli180Dec 2020OngoingMar 2025Not delivered
736 EWS TS AND 256 MIG TS AT PLOT NO R-1 ADDITIONAL MIDC LATURP52400017486ADD. MIDC, Latur-Aug 2018OngoingDec 2022Not delivered
364 EWS T/S UNDER PMAY AT JALNA DIS JALNAP51400012018jalna, Jalna80Sep 2017CompletedJul 2019Late, Sep 2020
CONSTRUCTION OF 240 EWS T/S ON GUT NO 09 NAKSATRAWADI AURANGABADP51500013212NAKSHATRAWADI, Aurangabad240Sep 2017CompletedApr 2019Late, Dec 2020

How this compares with Aurangabad

0%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Construction of 1056 EWS Tenements on Gut No on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opposite of Khivsara Plotting Nakshtrawadi1,400+ in Aurangabad

Builder: AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)

AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) has 9 registrations on MahaRERA, including 364 EWS T/S UNDER PMAY AT JALNA DIS JALNA and CONSTRUCTION OF 240 EWS T/S ON GUT NO 09 NAKSATRAWADI AURANGABAD. Its filings disclose 8 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar is delayed beyond 14 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar?

The registered promoter entity is AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA), a public authority as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar?

The professionals named in the filing: Architect: Sudhakar Bahegavhankar; Engineer: Rishikesh Vyapari; Chartered Accountant: Maya Pagare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 1056 EWS Tenements on Gut No 9 Part at Nakshtrawadi,Chhatrapati Sambhajinagar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 1056 EWS Tenements on Gut No to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.