Home / Browse projects / Aurangabad, Maharashtra / SARA SWARAJYA PHASE-I

Registered No litigation declared Residential / Group Housing project

SARA SWARAJYA PHASE-I

By SARA INFRASTRUCTURES

RG-MH-81334 · RERA P51500077523 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 7.00 crore secured on the land, in favour of NISHANT MULTISTATE COOPERATIVE CREDIT SOCIETY LTD AKOLA, VARDHAMAN NAGARI SAHAKARI PATSANSTHA MARYADIT
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
18 of 55Construction stages doneacross 5 buildings; furthest along: Slabs of Super Structure, 80%
232 of 293Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

SARA SWARAJYA PHASE-I is a Residential / Group Housing project by SARA INFRASTRUCTURES in Aurangabad, Maharashtra, registered with MahaRERA as P51500077523 on 20 Aug 2024. Possession is promised by 31 Dec 2030. 61 of the 293 units on this registration are recorded sold or booked, and 18 of 55 construction stages are filed complete.

At a glance

Project

  • NameSARA SWARAJYA PHASE-I
  • TypeResidential / Group Housing
  • Location
    • WADGAON KOLHATI NAGAR 1
    • Wadgaon Kolhati (CT)
    • Aurangabad
    • 431136
  • Pincode431136
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500077523
  • ReraGenie IDRG-MH-81334

Builder

  • NameSARA INFRASTRUCTURES
  • Entity typePartnership
  • PartnerSITARAM RATANLAL AGRAWAL
  • Other registrations11 more →
  • Completed8 of 12
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Aug 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings5 building records
  • Documents filed63 files

Current status

21%61 of 293 units booked

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAIGAD A TYPE BUILDINGNA8770070
RAJGAD B TYPE BUILDINGNA8755055
VISHALGAD C TYPE BUILDINGNA8756056
PRATAPGAD C TYPE BUILDINGNA8756056
SINHAGAD C TYPE BUILDINGNA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

RAIGAD A TYPE BUILDING27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAJGAD B TYPE BUILDING46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VISHALGAD C TYPE BUILDING27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PRATAPGAD C TYPE BUILDING40%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SINHAGAD C TYPE BUILDING41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed367

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots367
Closed/Covered66
Open Space301
BuildingClosed/CoveredOpen SpaceTotal
RAIGAD A TYPE BUILDING145569
RAJGAD B TYPE BUILDING145569
VISHALGAD C TYPE BUILDING145569
PRATAPGAD C TYPE BUILDING106777
SINHAGAD C TYPE BUILDING146983

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,894 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofNISHANT MULTISTATE COOPERATIVE CREDIT SOCIETY LTD AKOLA, VARDHAMAN NAGARI SAHAKARI PATSANSTHA MARYADIT
Secured amountRs 7.00 crore
CERSAI search filedYes
Declared on1 Oct 2025
LandownerVillageDistrict
RAVIJA RAVINDER SINGALMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityCIDCO Waluj Mahanagar
Permissible FSI18039.16
Proposed, not sanctioned13,145 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIDC Industrial Area, Chikhalthana MIDC , Nr Prozon Mall Chhatrapati Sambhajinagar

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMOL KSHIRSAGAR
EngineerAMOL KSHIRSAGAR
Chartered AccountantSD AGRAWAL AND ASSOCIATES
PartnerRole in project
SARA INFRASTRUCTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Mar 26.pdf1 Jun 2026
Form 2File: Form-2 Mar 26.pdf1 Jun 2026
Form 3File: Form-3 Mar 26.pdf1 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Mar 26.pdf1 Jun 2026
Form 1File: 1 Form 1 Swarajya Ph-1 Sep 25.pdf7 May 2026
Form 2File: 2 Form 2 Swarajya Ph-1 Sep 25.pdf7 May 2026
Form 3File: 3 Form 3 Swarajya Ph-1 Sep 25.pdf7 May 2026
Disclosure of Sold and Booked InventoryFile: 4 Sold Swarajya Ph-1 Sep 25.pdf7 May 2026
Form 1File: Form 1 _ Sara Swarajya Ph-1.pdf7 May 2026
Form 2File: Form 2 _ Sara Swarajya Ph-1.pdf7 May 2026
Form 3File: Form 3 Diclaration _Sara Swarajya Ph-1.pdf7 May 2026
Disclosure of Sold and Booked InventoryFile: Discloser_Sara Swarajya Ph-1.pdf7 May 2026
Form 1File: Form-1 June 25.pdf5 Sep 2025
Form 2File: Form-2 June 25.pdf5 Sep 2025
Form 3File: Form-3 Declaration June 25.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold June 25.pdf5 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 RERA CA Certificate of Sara Swarajya Ph-I-March 2025.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SWARAJYA PH_1.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SWARAJYA PH_1.pdf24 Apr 2025
Proforma of Agreement for saleFile: ATS Sara Swarjya.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sara Swarajya Ph1-Sep-24_Declaration.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sara Swarajya Ph1- Dec-24_ Declaration.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Sara Swarajya Ph1 _ Sold Unsold.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sara Swarajya P1 Form-2 19-01-24.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sara Swarajya P1 Form-1 19-01-25.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sara Swarajya P1 Form-2 19-01-24.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 Sara Swarajya _ Sept-24.pdf24 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: From 1 Sara Swarajya _ Sept-24.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sara Swarajya _ Sept-24.pdf24 Jan 2025
Other - FinanceFile: SELF DECLARATION - DA.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 RERA CA Certificate of Sara Swarajya Ph-I.pdf4 Aug 2024
Other - TechnicalFile: Sara Swarajya Phase-1 ANNEXURE'A'_page-0001.pdf2 Aug 2024
Other - TechnicalFile: CC CVERIFICATION.pdf2 Aug 2024
PAN CardFile: 1 PAN Card.pdf22 Jul 2024
Details of encumbrances concerned to FinanceFile: Sara Swarajya Phase-1 Financial Encumbrances 20-Jul-24.pdf22 Jul 2024
Details of encumbrances concerned to LegalFile: Sara Swarajya Phase-1 Financial Encumbrances 20-Jul-24.pdf22 Jul 2024
Declaration about Commencement CertificateFile: FORMAT - D.pdf22 Jul 2024
Declaration in FORM BFile: FORM - B.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Jul 2024
CERSAI detailsFile: CERSAI Declaration.pdf22 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Sara Swarajya Phase-1 Disclosure of Secured 19-Jul-24.pdf22 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISC OF INNTEREST - Mr NILESH.pdf22 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISC OF INTEREST - Mr SITARAM.pdf22 Jul 2024
Proforma of Agreement for saleFile: ATS Draft RERA.pdf22 Jul 2024
Proforma of Allotment letterFile: UPDATED MODEL FORM OF ALLOTT LETTER.pdf22 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: SARA SWARAJYA FORMAT-A.pdf22 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Sara Swarajya Format- B.pdf22 Jul 2024
Deviation Report with respect to Allotment letterFile: NO DEVIAT - ALLOT LETTER.pdf22 Jul 2024
Deviation Report with respect to model copy of AgreementFile: NO DEVIAT - AGREE TO SALE.pdf22 Jul 2024
Other - LegalFile: Development Agreement_Compressed.pdf22 Jul 2024
Layout approvalFile: Sanction Plan 1.pdf20 Jul 2024
Building plan approvalFile: Sanction Plan 1.pdf20 Jul 2024
Building plan approvalFile: Sanction Plan 2.pdf20 Jul 2024
Building plan approvalFile: Sanction Plan 3.pdf20 Jul 2024
Building plan approvalFile: Sanction Plan 4.pdf20 Jul 2024
Copy of the legal title reportFile: Search Report.pdf20 Jul 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan 1.pdf20 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 1.pdf20 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2.pdf20 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 3.pdf20 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 4.pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate .pdf20 Jul 2024

How this compares with Aurangabad

21%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SARA SWARAJYA PHASE-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADGAON KOLHATI NAGAR 11,400+ in Aurangabad

2 kmSARA SWARAJYA PHASE-ICompleted 15Lapsed / revoked 4Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 30 registered projects within 2 km.

Builder: SARA INFRASTRUCTURES

Sara Infrastructures has 12 registrations on MahaRERA, including SARA SWAPNANGAN - ROW HOUSES and SARA SWAPNANGAN - A4, A5, A6 BUILDINGS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SARA SWARAJYA PHASE-I is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SARA SWARAJYA PHASE-I?

The registered promoter entity is SARA INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SARA SWARAJYA PHASE-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SARA SWARAJYA PHASE-I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SARA SWARAJYA PHASE-I?

The professionals named in the filing: Architect: AMOL KSHIRSAGAR; Engineer: AMOL KSHIRSAGAR; Chartered Accountant: SD AGRAWAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARA SWARAJYA PHASE-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARA SWARAJYA PHASE-I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARA SWARAJYA PHASE-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.