New projects and RERA data in Sindhudurg district, Maharashtra

533 projects are registered in Sindhudurg district: 12,536 units across them, 32 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

533Projects covered
32Registered, last 12 months
12,536Units declared
9,821Units not yet booked
112Completion dates revised
2With declared litigation

Of the 533 covered registrations, 112 have revised their promised completion date and 2 declare litigation. The median project here is 15% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Sindhudurg projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 533 projects with a promised date, 188 are recorded delivered, 185 are still on the register and 160 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

0255075100today2017: 2 projects, delivered’172018: 33 projects, delivered’182019: 34 projects, delivered2019: 9 projects, registration lapsed or cancelled’192020: 11 projects, delivered2020: 6 projects, registration lapsed or cancelled’202021: 13 projects, delivered2021: 11 projects, registration lapsed or cancelled’212022: 26 projects, delivered2022: 21 projects, registration lapsed or cancelled’222023: 22 projects, delivered2023: 31 projects, registration lapsed or cancelled’232024: 19 projects, delivered2024: 39 projects, registration lapsed or cancelled’242025: 15 projects, delivered2025: 29 projects, registration lapsed or cancelled’252026: 6 projects, delivered2026: 31 projects, on the register2026: 13 projects, registration lapsed or cancelled’262027: 4 projects, delivered2027: 47 projects, on the register2027: 1 projects, registration lapsed or cancelled’272028: 1 projects, delivered2028: 48 projects, on the register’282029: 1 projects, delivered2029: 31 projects, on the register’292030: 19 projects, on the register’302031: 1 projects, delivered2031: 6 projects, on the register’312032: 1 projects, on the register’322033: 1 projects, on the register’332034: 1 projects, on the register’34

212 projects promise possession in 2026 or later. Facts as per filings on RERA website.

01,2502,5003,7505,000today2017: 12 flats, delivered’172018: 76 flats, delivered (only 3 of 33 projects filed a flat count)’182019: 188 flats, delivered (only 8 of 43 projects filed a flat count)2019: 45 flats, registration lapsed or cancelled (only 8 of 43 projects filed a flat count)’192020: 9 flats, registration lapsed or cancelled (only 1 of 17 projects filed a flat count)’202021: 25 flats, delivered (only 2 of 24 projects filed a flat count)’212022: 13 flats, delivered (only 4 of 47 projects filed a flat count)2022: 118 flats, registration lapsed or cancelled (only 4 of 47 projects filed a flat count)’222023: 941 flats, registration lapsed or cancelled (only 5 of 53 projects filed a flat count)’232024: 430 flats, registration lapsed or cancelled (only 5 of 58 projects filed a flat count)’242025: 107 flats, delivered (only 14 of 44 projects filed a flat count)2025: 588 flats, registration lapsed or cancelled (only 14 of 44 projects filed a flat count)’252026: 56 flats, delivered2026: 855 flats, on the register2026: 675 flats, registration lapsed or cancelled’262027: 41 flats, delivered2027: 2,058 flats, on the register’272028: 2,745 flats, on the register’282029: 2,123 flats, on the register’292030: 783 flats, on the register’302031: 508 flats, on the register’312032: 43 flats, on the register’322033: 97 flats, on the register’33’34

9,984 flats are promised in 2026 or later, across the 69% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Sindhudurg possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 111 of 533 projects (21%) have moved at least once; the median move is 30 months and the longest is 144 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

0255075100Originally due 2017: 2 projects kept the original date, 67% of the yearOriginally due 2017: 1 projects moved by 2 years or more, 33% of the year’17Originally due 2018: 33 projects kept the original date, 70% of the yearOriginally due 2018: 6 projects moved by under 2 years, 13% of the yearOriginally due 2018: 8 projects moved by 2 years or more, 17% of the year’18Originally due 2019: 37 projects kept the original date, 58% of the yearOriginally due 2019: 5 projects moved by under 2 years, 8% of the yearOriginally due 2019: 22 projects moved by 2 years or more, 34% of the year’19Originally due 2020: 12 projects kept the original date, 80% of the yearOriginally due 2020: 1 projects moved by under 2 years, 7% of the yearOriginally due 2020: 2 projects moved by 2 years or more, 13% of the year’20Originally due 2021: 15 projects kept the original date, 62% of the yearOriginally due 2021: 4 projects moved by under 2 years, 17% of the yearOriginally due 2021: 5 projects moved by 2 years or more, 21% of the year’21Originally due 2022: 35 projects kept the original date, 76% of the yearOriginally due 2022: 5 projects moved by under 2 years, 11% of the yearOriginally due 2022: 6 projects moved by 2 years or more, 13% of the year’22Originally due 2023: 43 projects kept the original date, 69% of the yearOriginally due 2023: 7 projects moved by under 2 years, 11% of the yearOriginally due 2023: 12 projects moved by 2 years or more, 19% of the year’23Originally due 2024: 44 projects kept the original date, 76% of the yearOriginally due 2024: 7 projects moved by under 2 years, 12% of the yearOriginally due 2024: 7 projects moved by 2 years or more, 12% of the year’24Originally due 2025: 34 projects kept the original date, 79% of the yearOriginally due 2025: 5 projects moved by under 2 years, 12% of the yearOriginally due 2025: 4 projects moved by 2 years or more, 9% of the year’25Originally due 2026: 29 projects kept the original date, 91% of the yearOriginally due 2026: 2 projects moved by under 2 years, 6% of the yearOriginally due 2026: 1 projects moved by 2 years or more, 3% of the year’26Originally due 2027: 38 projects kept the original date, 100% of the year’27Originally due 2028: 44 projects kept the original date, 100% of the year’28Originally due 2029: 29 projects kept the original date, 100% of the year’29Originally due 2030: 18 projects kept the original date, 100% of the year’30Originally due 2031: 6 projects kept the original date, 100% of the year’31Originally due 2032: 1 projects kept the original date, 100% of the year’32Originally due 2033: 1 projects kept the original date, 100% of the year’33Originally due 2034: 1 projects kept the original date, 100% of the year’34

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

01,2502,5003,7505,000Originally due 2017: 12 flats kept the original date, 67% of the year (only 1 of 3 projects filed a flat count)’17Originally due 2018: 76 flats kept the original date, 70% of the year (only 4 of 47 projects filed a flat count)Originally due 2018: 48 flats moved by 2 years or more, 17% of the year (only 4 of 47 projects filed a flat count)’18Originally due 2019: 233 flats kept the original date, 58% of the year (only 10 of 64 projects filed a flat count)Originally due 2019: 66 flats moved by 2 years or more, 34% of the year (only 10 of 64 projects filed a flat count)’19Originally due 2020: 9 flats kept the original date, 80% of the year (only 1 of 15 projects filed a flat count)’20Originally due 2021: 25 flats kept the original date, 62% of the year (only 3 of 24 projects filed a flat count)Originally due 2021: 26 flats moved by 2 years or more, 21% of the year (only 3 of 24 projects filed a flat count)’21Originally due 2022: 131 flats kept the original date, 76% of the year (only 10 of 46 projects filed a flat count)Originally due 2022: 36 flats moved by under 2 years, 11% of the year (only 10 of 46 projects filed a flat count)Originally due 2022: 411 flats moved by 2 years or more, 13% of the year (only 10 of 46 projects filed a flat count)’22Originally due 2023: 857 flats kept the original date, 69% of the year (only 15 of 62 projects filed a flat count)Originally due 2023: 18 flats moved by under 2 years, 11% of the year (only 15 of 62 projects filed a flat count)Originally due 2023: 564 flats moved by 2 years or more, 19% of the year (only 15 of 62 projects filed a flat count)’23Originally due 2024: 430 flats kept the original date, 76% of the year (only 13 of 58 projects filed a flat count)Originally due 2024: 478 flats moved by under 2 years, 12% of the year (only 13 of 58 projects filed a flat count)Originally due 2024: 496 flats moved by 2 years or more, 12% of the year (only 13 of 58 projects filed a flat count)’24Originally due 2025: 396 flats kept the original date, 79% of the year (only 19 of 43 projects filed a flat count)Originally due 2025: 224 flats moved by under 2 years, 12% of the year (only 19 of 43 projects filed a flat count)Originally due 2025: 173 flats moved by 2 years or more, 9% of the year (only 19 of 43 projects filed a flat count)’25Originally due 2026: 531 flats kept the original date, 91% of the year (only 15 of 32 projects filed a flat count)Originally due 2026: 97 flats moved by under 2 years, 6% of the year (only 15 of 32 projects filed a flat count)Originally due 2026: 114 flats moved by 2 years or more, 3% of the year (only 15 of 32 projects filed a flat count)’26Originally due 2027: 1,351 flats kept the original date, 100% of the year’27Originally due 2028: 2,543 flats kept the original date, 100% of the year’28Originally due 2029: 1,862 flats kept the original date, 100% of the year’29Originally due 2030: 783 flats kept the original date, 100% of the year’30Originally due 2031: 394 flats kept the original date, 100% of the year’31Originally due 2032: 43 flats kept the original date, 100% of the year’32Originally due 2033: 97 flats kept the original date, 100% of the year’33’34

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Sindhudurg

Whose name the land is in

Every one of the 533 registrations on this page answers this: on 254 the promoter is the only owner named; on 257 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 22 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Sindhudurg: projects by taluka

533 of the 533 registrations on this page name their taluka.

TalukaProjectsShare
Sawantwadi14126%
Kudal12824%
Kankavli10420%
Malwan469%
Devgad387%
Dodamarg357%
Vengurla295%
1 other taluka122%

Projects in Sindhudurg

Showing 1 to 60 of 533 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
GOA 2palsamb post office, 416614SANSKRUTI LANDMARKS47938%23 Aug 2017Registration lapsed
BLISS AQUASateli Bhedshi, 416549EWISSEN INFRASTRUCTURE3821%20 Oct 2025Registered
GARDEN OF EDENBanda (CT), 416511YUGEN INFRA PRIVATE LIMITED37724%29 Dec 2025Registered
OTRA BUSINESS PARK0, 416812OTRA INFRASTRUCTURE PRIVATE LIMITED34953%14 Aug 2017Registration lapsed
FORESTASindhudurg, 416511Salaj Jinender Jain2970%22 Feb 2022Registration lapsed
perto de goa phase R 1niravde village, sawantwadi, 416510ANKIT VASTU CREATIONS PRIVATE LIMITED2560%3 Jan 2021Registered
PMAY EWS 240 tenement at Devgad jamsandeJamsande, 416616Samarath Multi biz JV2400%13 Sep 2021Registered
Sunsmit Vedic VillageDhamapur, 416605Smitha Sunnil Korgaonkar2320%18 Mar 2026Registered
ORIGIN KUDALDewoolwadi, 416520AXON ORIGIN KUDAL LLP22257%25 Aug 2025Registered
Golf De OceanKhanoli, 416516SSL Nirvana Grand Golf Developers Pvt Ltd18617%26 Sep 2025Registered
ASHTVINAYAK GRUHSANKULNEAR KHAMDEV NAKA, 416510MR PANKAJ ROHIDAS NARVEKAR1817%22 Aug 2017Registered
GOURI NANDAN APARTMENTBANDA, 416511GOURINANDAN BUILDERS AND DEVELOPERS18022%27 May 2019Registered
AXIS BLUESYOG CITY, 416512EEJAK HOLDINGS PRIVATE LIMITED17278%10 Feb 2020Registration lapsed
SAWANTWADI ENCLAVEOPP SAWANTWADI ROAD STATION, 416510LANDKRAFT SPACES PRIVATE LIMITED16062%23 Mar 2021Registration lapsed
ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606Kolamb, 416606Chandrashekhar Suryakant Morvekar15535%22 Feb 2023Registered
Nirmitee AvighnaNear Topiwala Vachanalay, 416520NIRMITEE BUILDERS & DEVELOPERS15324%7 Feb 2023Registered
Inamdar PlazaVabhave, 416810Vijay Shridhar Tawde15031%7 Dec 2022Registration lapsed
KANAK PARADISEKANKAVLI, 416602TRIVENI BUILDERS AND DEVELOPERS15045%5 Aug 2019Registration lapsed
APNA GHARKOLGAON WITHIN THE MUNICIPAL LIMITS OF SAWANTWADI, 416510VYANKATESH VASANT DESHPANDE1490%10 Oct 2023Registered
DREAMZ GOANABARWADA, 416518LEVEL UP CONSTRUCTIONS14463%11 Sep 2018Registered
AXIS BLUESYog City, 416512EEJAK HOLDINGS PRIVATE LIMITED12854%7 Mar 2019Registered
AXIS BLUESYog Resort, 416512EEJAK HOLDINGS PRIVATE LIMITED12882%22 Jul 2019Registered
MAITRI GARDENKANAK NAGAR, 416602MAITRI DEVELOPERS1188%19 Mar 2018Registered
Riviera SuitesMALEWAD, 416510Home and Soul Developers Private Limited1170%9 Jan 2026Registered
SINDHU PRATAP COMPLEXNEAR PANCHAYAT SAMITI, 416602AMEY HOMES11533%31 May 2024Registered
HERITAGE HOMESNear Sawantwadi Police Station, 416510HERITAGE REALTORS11411%19 Aug 2017Registered
HARISHCHANDRA RESIDENCYJAMSANDE, 416612HARISHCHANDRA REALTY SOLUTIONS LLP11230%3 Feb 2022Registered
Siddhivinayak ResidencyKolamb, 416606Vastu Builder & Land Developer1120%31 Jan 2025Registered
HARDIK COMPLEXTALERE, 416801KISHOR VISHRAM KHADYE1060%28 Jun 2024Registered
Crestview CourtKudal, 416520STALLUM BUILDCON PRIVATE LIMITED1040%9 Mar 2026Registered
Nirmitee S S Royal PlazaKudal, 416520NIRMITEE BUILDERS & DEVELOPERS1032%26 Mar 2025Registered
Kshitij Market City Phase IIKudal, 416520Kshitij Developers10030%1 Apr 2023Registered
AXIS LAKE CITYAXIS BLUES, 416512GIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED990%31 Oct 2020Registration lapsed
RADHA-KRUSHNA NAGARITEMBWADI, 416602MAYURESH DEVELOPERS990%10 Jan 2023Registered
AARADHANAKUDAL, 416520BALAJI BUILDERS AND DEVELOPERS980%18 Nov 2025Registered
Marlin PlotsMalewad, 416510Home and Soul Developers Private Limited970%31 Aug 2026Registered
SEA MERIDIANnear zantey kaju factory, 416606SKY INFRASTRUCTURE970%26 Feb 2026Registered
Adinath ResidencyWaingani, 416602DS Ventures960%3 Jul 2026Registered
Ashapuri ResidencyJamsande, Devgad, 416612Shirish Suryakant Shirsathe9619%15 Feb 2023Registered
SHRI RAM SANKULPadel, 416804SANKALP DEVELOPERS950%24 Sep 2025Registered
YOG ANANDYOG CITY, 416512Abome Real Estate Private Limited950%2 Apr 2024Registered
SAMARTH AISHWARYAMALVAN, 416608SAMARTH BUILDERS & DEVELOPERS9018%27 Oct 2023Registered
Shiv-Shankar PlazaNandgaon, 416602Chintamani Dasharath Kalyankar894%7 Nov 2024Registered
Shree Bhairee Ganesh Sankul- Phase 1Mouje Kankavli Nagar Panchayat Limit, 416602ATUL SURESH RAORANE890%2 Jun 2025Registered
PARADISE HOMES - Phase 1Ghartan wadi, 416602RISE & RISE INFRAPROJECTS825%19 Aug 2017Registration lapsed
AAKAR ANANTVENGURLA ROAD, 416520AAKAR BUILDERS AND DEVELOPERS8122%8 Jan 2025Registered
Dattaguru Niwasmajgaon, 416510D.S.S Group8060%28 Apr 2022Registered
Dwarka NiwasOros Budruk, 416812Jayshree Builders8010%29 Jul 2025Registered
YOG CITY PH 1Maneri, 416512Jayprakash Ramawadh Maurya80100%29 Jul 2017Registration lapsed
PARADISERailway Station Kankavali, 416602SANTOSH GOPAL KODE770%17 Apr 2026Registered
Anant PrideKankavali, 416602Unique Infra7638%8 Sep 2021Registered
Dwarkanagri phase -1MITHBAON, 416615KRISHNA GAJANAN KESARKAR7557%30 Apr 2019Registered
KRUPASINDHUPADEL, 416804KRUPASINDHU CONSTRUCTIONS LLP7222%24 Jun 2019Registered
YASHODAMAIMITHBAO, 416615KRISHNA GAJANAN KESARKAR727%29 Nov 2024Registered
ATRINANDANKATTAGAON, 416520SHREE DATT ENTERPRISES7123%9 Aug 2024Registered
Panchami HeightsSawantwadi, 416510Govind Janardan Khorjuvekar7135%7 Dec 2022Registered
Shivaangan HeightsSindhudurg, 416520S. G. DEVELOPERS680%21 Apr 2026Registered
DHRUVI APARTMENTTALERE, 416801ABHAY MANGESH BHAMBURE650%2 Feb 2024Registered
ANAADIH SHRI DATTAKASKILWADA, 416510PRABHAKAR KRISHNAJI PARAB6324%5 Jun 2024Registered
DEVDURG ELITESJAMSANDE, 416613OMTECH ASSOCIATES6313%20 Nov 2020Registration lapsed
Planning a launch in Sindhudurg? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Sindhudurg

AJINKYA CONSTRUCTION (8), Ranco Realty Pvt Ltd (7), SUKHMANI CONSTRUCTIONS (6), Chandrashekhar Suryakant Morvekar (5), NIRMITEE BUILDERS & DEVELOPERS (5), CONSORTEXE PROPERTIES PVT LTD (5). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Sindhudurg projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 15% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Sindhudurg project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Sindhudurg district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Sindhudurg registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Sindhudurg project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Sindhudurg district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.