Home / Browse projects / Sindhudurg, Maharashtra / DEVDURG ELITES
DEVDURG ELITES
RG-MH-28802 · RERA P52900027156 · Last updated on MahaRERA portal: 20 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 23 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DEVDURG ELITES is a Others project by OMTECH ASSOCIATES in Sindhudurg, Maharashtra, registered with MahaRERA as P52900027156 on 20 Nov 2020. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 23 months from the original filing. 8 of the 63 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameDEVDURG ELITES
- TypeOthers
- Location
- NIPNI DEVGAD
- JAMSANDE
- Devgad
- Sindhudurg
- 416613
- Pincode416613
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900027156
- ReraGenie IDRG-MH-28802
Builder
- NameOMTECH ASSOCIATES
- Entity typePartnership
- PartnersSAMIR YASEWANT PEDNEKAR, SUSHILKUMAR DAMODAR LOKE, HEMANT GANPAT DESAI
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on20 Nov 2020
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Apr 2024)
- Buildings1 building record
- Documents filed64 files
Current status
Figures as on 20 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DEVDURG ELITES | NA | 8 | 7 | 29 | 34 | 63 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
DEVDURG ELITES: 89% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed113
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SARITA DESAI & SHREERAM DESAI | Jamsande | Sindhudurg |
| OMTECH ASSOCIATES | Jamsande | Sindhudurg |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DEVDURG ELITES | NA | Rs 5.95 cr | Rs 5.93 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR SANJAY ANDHARI |
| Architect | SHIRISH GHORPADE |
| Engineer | SANDEEP SHETYE |
| Engineer | VIRENDRA KANEKAR |
| Engineer | Rasiket RAJARAM Narkar |
| Chartered Accountant | AMOL KHANOLKAR |
| Partner | Role in project |
|---|---|
| OMTECH ASSOCIATES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe registration was valid from 20/11/2020 to 30/04/2024 Owing to new UDPCR we had to change our Building Plan. After we got our revised FSI & Commencement Certificate we commenced the Civil work. Considerable time was lost during the process. We got our revised Commencement Certificate on 10/08/2021, after this Commencement Certificate we started the work. Actual Date of work is 10/08/2021 so we are requesting to extend our completion date (Validity date) upto 10/08/2025.
Reason as filed by the promoterDuring COVID pandemic people were hesitant to invest in flats/ houses, hence booking was affected for the project. As per the Sanctioned plan we have done some changes/ modifications in the 6th Floor Plan. We have submitted the new modified plan for approval which is in process after the approval of the said plan we will complete the project in the due time. We hope your goodselves will grant us the necessary time to complete the project by 31st March 2026.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 31-12-25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 31-12-25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 31-12-25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 30-9-25.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 30-9-25.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 30-9-25.pdf | 20 Oct 2025 |
| Building plan approval or NA orderFile: Devdurg Order.pdf | 19 Jul 2025 |
| Commencement certificateFile: Devdurg CC.pdf | 19 Jul 2025 |
| Form 1File: Form 1 31-3-25.pdf | 16 Jun 2025 |
| Form 2File: Form 2 31-3-25.pdf | 16 Jun 2025 |
| Form 3File: Form 3 31-3-25.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 31-3.pdf | 16 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-3-25.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-3-25.pdf | 26 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEVDURG ELITES RERA FORM 1 31-03-2025.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 31-12-2024.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31-12.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31-12.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 DEVDURG ELITE 30-6-24.pdf | 3 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-6-24.pdf | 3 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-3-24.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-3-24.pdf | 20 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 7 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 12 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 31 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 29 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 29 Jul 2023 |
| Copy of the legal title reportFile: 496 b12.pdf | 6 Apr 2023 |
| Copy of the legal title reportFile: 496 6a5.pdf | 6 Apr 2023 |
| Copy of the legal title reportFile: 496 6a1.pdf | 6 Apr 2023 |
| Copy of the legal title reportFile: 495 b6.pdf | 6 Apr 2023 |
| Copy of the legal title reportFile: 496 6a4.pdf | 6 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 9 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21.pdf | 9 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 21-22.pdf | 9 Feb 2023 |
| CERSAI detailsFile: CERSAI Search Report Devdurg.pdf | 8 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance concerned to legal.pdf | 4 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance concerned to legal.pdf | 4 Feb 2023 |
| Declaration about Commencement CertificateFile: CC Decelaration.pdf | 4 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank ac.pdf | 4 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 20 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 20 Jan 2023 |
| Layout approvalFile: Plan Devdurg.pdf | 16 Jan 2023 |
| Building plan approvalFile: Plan Devdurg.pdf | 16 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: Plan Devdurg.pdf | 16 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Devdurg.pdf | 16 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC DEVDURG.pdf | 16 Jan 2023 |
| Layout approvalFile: Doc1.pdf | 17 Nov 2020 |
| Building plan approvalFile: Doc1.pdf | 17 Nov 2020 |
| Copy of Layout Approval (in case of layout)File: Doc1.pdf | 17 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Doc1.pdf | 17 Nov 2020 |
| Copy of the legal title reportFile: 6A5.pdf | 11 Nov 2020 |
| Copy of the legal title reportFile: 1.pdf | 6 Nov 2020 |
| Copy of the legal title reportFile: 2.pdf | 6 Nov 2020 |
| Copy of the legal title reportFile: 4.pdf | 6 Nov 2020 |
| Copy of the legal title reportFile: 5.pdf | 6 Nov 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 6 Nov 2020 |
| Proforma of Allotment letterFile: SATHEKARAR SHOP.pdf | 6 Nov 2020 |
| Proforma of Allotment letterFile: SATHEKARAR FLAT.pdf | 6 Nov 2020 |
| Details of encumbrancesFile: ENCU.pdf | 5 Nov 2020 |
| PAN CardFile: PAN CARD OMTECH.pdf | 4 Nov 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: commesment.pdf | 4 Nov 2020 |
| Declaration in FORM BFile: DEVLOPER.pdf | 4 Nov 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER.pdf | 4 Nov 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 64 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DEVDURG ELITES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JAMSANDE530+ in Sindhudurg
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
DwarkaMai
Om Shakti Builders & Developers
MANGALMURTI ARCADE
MANGALA & ASSOCIATES
NAYSHA HEIGHTS
JAY KIRIT SANGHRAJKA
RAMESHWAR COMPLEX
RAMESHWAR CONSTRUCTIONS
ROOPRAJ RESIDENCY
RAMESHWAR CONSTRUCTIONS
SEAGREENS
RARA REALTY
See every Sindhudurg project, with the district possession charts
Builder: OMTECH ASSOCIATES
OMTECH ASSOCIATES has 1 registration on MahaRERA, including DEVDURG ELITES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What does it mean that DEVDURG ELITES shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if DEVDURG ELITES is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DEVDURG ELITES?
The registered promoter entity is OMTECH ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DEVDURG ELITES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DEVDURG ELITES?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DEVDURG ELITES?
The professionals named in the filing: Architect: AR SANJAY ANDHARI; Architect: SHIRISH GHORPADE; Engineer: SANDEEP SHETYE; Engineer: VIRENDRA KANEKAR; Engineer: Rasiket RAJARAM Narkar; Chartered Accountant: AMOL KHANOLKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DEVDURG ELITES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback