ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / GOURI NANDAN APARTMENT

Registered No litigation declared Others project

GOURI NANDAN APARTMENT

By GOURINANDAN BUILDERS AND DEVELOPERS

RG-MH-03286 · RERA P52900020980 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Nov 2031Possession promisedno revision filed
13 of 66Construction stages doneacross 6 buildings; furthest along: Stilt Floor, 55%
141 of 180Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 240 documents Report an error

GOURI NANDAN APARTMENT is a Others project by GOURINANDAN BUILDERS AND DEVELOPERS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900020980 on 27 May 2019. Possession is promised by 28 Nov 2031. 39 of the 180 units on this registration are recorded sold or booked, and 13 of 66 construction stages are filed complete.

At a glance

Project

  • NameGOURI NANDAN APARTMENT
  • TypeOthers
  • Location
    • NATIONAL HIGHWAY
    • BANDA
    • Banda (CT)
    • Sawantwadi
    • Sindhudurg
    • 416511
  • Pincode416511
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900020980
  • ReraGenie IDRG-MH-03286

Builder

  • NameGOURINANDAN BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersSUPRIYA ROHIT NADKARNI, RAVINA RAVINDRA GAWAS, ANAND VISHNU GAWAS, ROHIT DEVIDAS NADKARNI HUF

Key dates

this monthRegisteredMay 2019PromisedNov 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 May 2019
  • Promised completion28 Nov 2031
  • Revised completionNone
  • Buildings6 building records
  • Documents filed240 files

Current status

22%39 of 180 units booked
19.7%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOURINANDAN APARTMENT BUILDING A PROPOSEDNA5550757
GOURINANDAN APARTMENT BUIDING BNA5033336
GOURINANDAN APARTMENT BUILDING CNA5020222
GOURINANDAN APARTMENT BUILDING D PROPOSEDNA5020929
GOARINNANDAN APARTMENT BUILDING FNA5436036
GOURINANDAN APARTMENT BUILDING E PROPOSEDNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Stilt Floor, at 55%.

GOURINANDAN APARTMENT BUILDING A PROPOSED0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOURINANDAN APARTMENT BUIDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOURINANDAN APARTMENT BUILDING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOURINANDAN APARTMENT BUILDING D PROPOSED23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor55%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOARINNANDAN APARTMENT BUILDING F82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GOURINANDAN APARTMENT BUILDING E PROPOSED22%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor45%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes35%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes35%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered6
Open Space6
BuildingClosed/CoveredOpen SpaceTotal
GOURINANDAN APARTMENT BUILDING A PROPOSED112
GOURINANDAN APARTMENT BUIDING B112
GOURINANDAN APARTMENT BUILDING C112
GOURINANDAN APARTMENT BUILDING D PROPOSED112
GOARINNANDAN APARTMENT BUILDING F112
GOURINANDAN APARTMENT BUILDING E PROPOSED112

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Nov 2025

Approvals and building plan

Sanctioning authorityDeputy Collector, Sindhudurg
Permissible FSI8000.0
Proposed, not sanctioned8,000 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANDA SAWANTWADI SINDHUDURG
Estimated costRs 31.11 cr
Cost incurredRs 6.12 cr
Work done19.69%
BuildingWingEstimatedIncurred
GOURINANDAN APARTMENT BUILDING A PROPOSEDNARs 6.79 cr-
GOURINANDAN APARTMENT BUIDING BNARs 6.00 cr-
GOURINANDAN APARTMENT BUILDING CNARs 5.56 cr-
GOURINANDAN APARTMENT BUILDING D PROPOSEDNARs 4.07 crRs 2.18 cr
GOARINNANDAN APARTMENT BUILDING FNARs 3.57 crRs 3.57 cr
GOURINANDAN APARTMENT BUILDING E PROPOSEDNARs 3.49 cr-
-NARs 1.64 crRs 37.73 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUNIL KRISHNA NIRAVDEKAR
EngineerSUNIL KRISHNA NIRAVDEKAR
Chartered AccountantS V MODAK AND CO
Chartered AccountantSUDHIR NAIK AND ASSOCIATES
Chartered AccountantDAMODAR B KHANOLKAR AND CO
PartnerRole in project
GOURINANDAN BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Dec 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Nov 2031

Documents filed240

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 240 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AR CERTIFICATE FORM 1 FY 2025-26 Q4.pdf29 May 2026
Withdrawal Update Form 2File: ENG CERTIFICATE FORM 2 FY 2025-26 Q4.pdf29 May 2026
Withdrawal Update Form 3File: CA CERTIFICATE FY 25-26 Q4 New.pdf29 May 2026
Withdrawal Update Form 1File: 1 AR CERTIFICATE FORM 1 FY 25-26 Q3 OLD.pdf28 Feb 2026
Withdrawal Update Form 1File: 1 AR CERTIFICATE FORM 1 FY 25-26 Q3 OLD.pdf28 Feb 2026
Withdrawal Update Form 2File: 2 ENG CERTIFICATE FORM 2 FY 25-26 Q3 OLD.pdf28 Feb 2026
Withdrawal Update Form 2File: 2 ENG CERTIFICATE FORM 2 FY 25-26 Q3 OLD.pdf28 Feb 2026
Withdrawal Update Form 3File: 3 CA CERTIFICATE FY 25-26 Q3 OLD.pdf28 Feb 2026
Withdrawal Update Form 3File: 3 CA CERTIFICATE FY 25-26 Q3 OLD.pdf28 Feb 2026
Withdrawal Update Form 1File: 14 Architects Certificate 25-26 Qtr -2.pdf17 Dec 2025
Withdrawal Update Form 1File: 14 Architects Certificate 25-26 Qtr -2.pdf17 Dec 2025
Withdrawal Update Form 2File: 14 Engineer Certificate 2025-26 Qtr - 2.pdf17 Dec 2025
Withdrawal Update Form 2File: 14 Engineer Certificate 2025-26 Qtr - 2.pdf17 Dec 2025
Withdrawal Update Form 3File: 14 CA Certificate F Y 2025-26 Qtr 2.pdf17 Dec 2025
Withdrawal Update Form 3File: 14 CA Certificate F Y 2025-26 Qtr 2.pdf17 Dec 2025
Withdrawal Update Form 1File: 14 Architects Certificate 25-26 Qtr -2.pdf16 Dec 2025
Withdrawal Update Form 2File: 14 Engineer Certificate 2025-26 Qtr - 2.pdf16 Dec 2025
Withdrawal Update Form 3File: 14 CA Certificate F Y 2025-26 Qtr 2.pdf16 Dec 2025
Layout approvalFile: LAYOUT.PDF15 Dec 2025
Building plan approvalFile: PLAN.pdf15 Dec 2025
Commencement certificateFile: commencement certificates.pdf15 Dec 2025
Form 1File: 12 Architects Certificate 24-25 Qtr -4.pdf15 Dec 2025
Form 2File: 12 Engineer Certificate 2024-25 Qtr - 4.pdf15 Dec 2025
Form 3File: 12 CA Certificate F Y 2024-25 Qtr 4.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: 24 Disclosure of Inventory FY 2024- 25 Qtr 4.pdf15 Dec 2025
Withdrawal Update Form 1File: 14 Architects Certificate 25-26 Qtr -2.pdf15 Dec 2025
Withdrawal Update Form 1File: 14 Architects Certificate 25-26 Qtr -2.pdf15 Dec 2025
Withdrawal Update Form 2File: 14 Engineer Certificate 2025-26 Qtr - 2.pdf15 Dec 2025
Withdrawal Update Form 2File: 14 Engineer Certificate 2025-26 Qtr - 2.pdf15 Dec 2025
Withdrawal Update Form 3File: 14 CA Certificate F Y 2025-26 Qtr 2.pdf15 Dec 2025
Withdrawal Update Form 3File: 14 CA Certificate F Y 2025-26 Qtr 2.pdf15 Dec 2025
Form 2A (FY 2024-2025)File: 3 Eng Certificate No 2A FY 2024-25.pdf13 Dec 2025
Form 2A (FY 2025-2026)File: 4 Eng Certificate No 2A FY 2025-26.pdf13 Dec 2025
Form 1File: AR CERTIFICATE F Y 2019-20.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2019-20.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2019-20.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of Inventory 30-06-2019.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2019-20.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2019-20.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2019-20.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of Inventory 30-09-2019.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2019-20.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2019-20.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2019-20.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure of Inventory 31-12-2019.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2019-20.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2019-20.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2019-20.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 4 Disclosure of Inventory 31-03-2020.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2020-21.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2020-21.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2020-21.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 5 Disclosure of Inventory 30-06-2020.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2020-21.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2020-21.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2020-21.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 6 Disclosure of Inventory 30-09-2020.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2020-21.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2020-21.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2020-21.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 7 Disclosure of Inventory 31-12-2020.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2020-21.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2020-21.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2020-21.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 9 Disclosure of Inventory 31-03-2021.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2021-22.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2021-22.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2021-22.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 10 Disclosure of Inventory 30-06-2021.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2021-22.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2021-22.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2021-22.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 11 Disclosure of Invetory 30-09-2021.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2021-22.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2021-22.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2021-22.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 13 Disclosure of Inventory 31-12-2021.pdf26 Nov 2025
Form 1File: AR CERTIFICATE F Y 2021-22.pdf26 Nov 2025
Form 2File: ENG CERTIFICATE F Y 2021-22.pdf26 Nov 2025
Form 3File: CA CERTIFICATE NO 3 F Y 2021-22.pdf26 Nov 2025

How this compares with Sindhudurg

22%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep GOURI NANDAN APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANDA530+ in Sindhudurg

2 kmGOURI NANDAN APARTMENTCompleted 3Lapsed / revoked 2Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: GOURINANDAN BUILDERS AND DEVELOPERS

GOURINANDAN BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including GOURI NANDAN APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if GOURI NANDAN APARTMENT is delayed beyond 28 Nov 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOURI NANDAN APARTMENT?

The registered promoter entity is GOURINANDAN BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOURI NANDAN APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOURI NANDAN APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOURI NANDAN APARTMENT?

The professionals named in the filing: Architect: SUNIL KRISHNA NIRAVDEKAR; Engineer: SUNIL KRISHNA NIRAVDEKAR; Chartered Accountant: S V MODAK AND CO; Chartered Accountant: SUDHIR NAIK AND ASSOCIATES; Chartered Accountant: DAMODAR B KHANOLKAR AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOURI NANDAN APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOURI NANDAN APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOURI NANDAN APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.