Home / Browse projects / Sindhudurg, Maharashtra / ASHTVINAYAK GRUHSANKUL

Registered No litigation declared Others project

ASHTVINAYAK GRUHSANKUL

By MR PANKAJ ROHIDAS NARVEKAR

RG-MH-24392 · RERA P52900009547 · Last updated on MahaRERA portal: 5 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 7.00 crore secured on the land, in favour of BANK OF MAHARASHTRA, SINDHUDURG ZILLA VAISHYA SAMAJ SAHKARI PATHSAWSTHA MARYADIT PHONDA GHAT

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
3 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 95%
168 of 181Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 168 documents Report an error

ASHTVINAYAK GRUHSANKUL is a Others project by MR PANKAJ ROHIDAS NARVEKAR in Sindhudurg, Maharashtra, registered with MahaRERA as P52900009547 on 22 Aug 2017. Possession is promised by 30 Jun 2027. 13 of the 181 units on this registration are recorded sold or booked, and 3 of 44 construction stages are filed complete.

At a glance

Project

  • NameASHTVINAYAK GRUHSANKUL
  • TypeOthers
  • Location
    • NH 66
    • NEAR KHAMDEV NAKA
    • Kshetrafal
    • Sawantwadi
    • Sindhudurg
    • 416510
  • Pincode416510
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900009547
  • ReraGenie IDRG-MH-24392

Builder

  • NameMR PANKAJ ROHIDAS NARVEKAR
  • Entity typeOthers
  • Named personSUKHAKARTA REAALTY PROP. MR VIVEKANAND ROHIDAS NARVEKAR

Key dates

this monthRegisteredAug 2017PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed168 files

Current status

7%13 of 181 units booked
43.3%Work done, per cost certificate

Figures as on 5 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PHASE 1 , PUSHP VIHAR, A BUILDING, A WING AND B WINGNA856647113
PHASE 2, PUSHP VIHAR B BUILDING, C WINGNA5520020
PHASE 3, PUSHP VIHAR, WING D, WING E AND WING FNA6548048
PHASE 4, C BUILDING, WINGS MORESHWAR AND SIDDHIVINAYAKNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 95%.

PHASE 1 , PUSHP VIHAR, A BUILDING, A WING AND B WING64%
ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PHASE 2, PUSHP VIHAR B BUILDING, C WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PHASE 3, PUSHP VIHAR, WING D, WING E AND WING F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PHASE 4, C BUILDING, WINGS MORESHWAR AND SIDDHIVINAYAK0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered20
Open Space13
BuildingClosed/CoveredOpen SpaceTotal
PHASE 1 , PUSHP VIHAR, A BUILDING, A WING AND B WING161026
PHASE 2, PUSHP VIHAR B BUILDING, C WING235
PHASE 4, C BUILDING, WINGS MORESHWAR AND SIDDHIVINAYAK202

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,850 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofBANK OF MAHARASHTRA, SINDHUDURG ZILLA VAISHYA SAMAJ SAHKARI PATHSAWSTHA MARYADIT PHONDA GHAT
Secured amountRs 7.00 crore
CERSAI search filedYes
Declared on14 Mar 2026
LandownerVillageDistrict
VIVEKANAND ROHIDAS NARVEKARKshetrafalSindhudurg

Approvals and building plan

Sanctioning authorityTOWN PLANNER SINDHUDURG
Permissible FSI5850.0
Proposed, not sanctioned5,850 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPORVORIM GOA
Estimated costRs 16.11 cr
Cost incurredRs 6.97 cr
Work done43.28%
BuildingWingEstimatedIncurred
PHASE 1 , PUSHP VIHAR, A BUILDING, A WING AND B WINGNARs 7.05 crRs 6.43 cr
PHASE 3, PUSHP VIHAR, WING D, WING E AND WING FNARs 3.97 cr-
-NARs 2.70 crRs 54.00 lakh
PHASE 2, PUSHP VIHAR B BUILDING, C WINGNARs 2.38 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR NAVIN LAD NIRMITTI ARCHITECT AND INTERIOR DESIGNER LAD
ArchitectNAVIN LAD
EngineerSHIRIRAM JOSHI
EngineerSUNIL KRISHNA NIRAVDEKAR
Chartered AccountantMR SUDHIR GANESH NAIK
Chartered AccountantYATIN DILIP JOSHI
Chartered AccountantSUDHIR NAIK AND ASSOCIATES
PartnerRole in project
MR PANKAJ ROHIDAS NARVEKAR AND VIVEKANAND ROHIDAS NARVEKAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed168

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 168 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2017-2018)File: Quality Assurance Certificate 2A- Ashtavinayak Gruh Sankul - Narvekar - 2025-26.pdf5 Jun 2026
Withdrawal Update Form 1File: AR CERTIFICATE FORM 1 31-03-2026.pdf20 Apr 2026
Withdrawal Update Form 1File: AR CERTIFICATE FORM 1 31-03-2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 ENG Certificate FOR ASHTVINAYAK 31ST MARCH 2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 ENG Certificate FOR ASHTVINAYAK 31ST MARCH 2026.pdf20 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE FORM 3 31-3-2026.pdf20 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE FORM 3 31-3-2026 MR.pdf20 Apr 2026
Withdrawal Update Form 1File: AR CERTIFICATE FORM 1 31-03-2026.pdf19 Apr 2026
Withdrawal Update Form 2File: Form 2 ENG Certificate FOR ASHTVINAYAK 31ST MARCH 2026.pdf19 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE FORM 3 31-3-2026 MR.pdf19 Apr 2026
Withdrawal Update Form 1File: AR CERT FORM 1 SEPT 2025.pdf4 Apr 2026
Withdrawal Update Form 1File: AR CERT FORM 1 SEPT 2025.pdf4 Apr 2026
Withdrawal Update Form 1File: AR CERT FORM 1 DATED 31-12-2025.pdf4 Apr 2026
Withdrawal Update Form 1File: AR CERT FORM 1 DATED 31-12-2025.pdf4 Apr 2026
Withdrawal Update Form 2File: ENG CER FORM 2 30 SEPT 25.pdf4 Apr 2026
Withdrawal Update Form 2File: ENG CER FORM 2 30 SEPT 25.pdf4 Apr 2026
Withdrawal Update Form 2File: ENG CERT FORM 2 31ST DEC 2025.pdf4 Apr 2026
Withdrawal Update Form 2File: ENG CERT FORM 2 31ST DEC 2025.pdf4 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE FORM 3 SEPT 2025 MR_compressed.pdf4 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE FORM 3 SEPT 2025_compressed.pdf4 Apr 2026
Withdrawal Update Form 3File: CA CERT FORM 3 31ST DEC 2025 mr.pdf4 Apr 2026
Withdrawal Update Form 3File: CA CERT FORM 3 DEC 2025.pdf4 Apr 2026
Withdrawal Update Form 1File: AR CERT FORM 1 JUNE 2025.pdf3 Apr 2026
Withdrawal Update Form 1File: AR CERT FORM 1 JUNE 2025.pdf3 Apr 2026
Withdrawal Update Form 2File: ENG CER FORM 2 30 JUNE 25.pdf3 Apr 2026
Withdrawal Update Form 2File: ENG CER FORM 2 30 JUNE 25.pdf3 Apr 2026
Withdrawal Update Form 3File: CA CERT FORM 3 30 TH JUNE 2025 mr.pdf3 Apr 2026
Withdrawal Update Form 3File: CA CERT FORM 3 30 TH JUNE 2025.pdf3 Apr 2026
Withdrawal Update Form 1File: AR CERT FORM 1 DATED 31-12-2025.pdf2 Mar 2026
Withdrawal Update Form 2File: ENG CERT FORM 2 31ST DEC 2025.pdf2 Mar 2026
Withdrawal Update Form 3File: CA CERT FORM 3 31ST DEC 2025_compressed.pdf2 Mar 2026
Withdrawal Update Form 1File: AR CERT FORM 1 DATED 31-12-2025.pdf27 Feb 2026
Withdrawal Update Form 1File: AR CERT FORM 1 DATED 31-12-2025.pdf27 Feb 2026
Withdrawal Update Form 2File: ENG CER FORM 2 31 MARCH 25.pdf27 Feb 2026
Withdrawal Update Form 2File: ENG CERT FORM 2 31 DEC 2025.pdf27 Feb 2026
Withdrawal Update Form 3File: CA CERT FORM 3 31ST DEC 2025_compressed.pdf27 Feb 2026
Withdrawal Update Form 3File: CA CERT FORM 3 31ST DEC 2025_compressed.pdf27 Feb 2026
Form 5 (FY 2024-2025)File: CA CERT FORM 5 24 25.pdf29 Nov 2025
Certificates of CA (Form 3)File: CA CERT FORM 3 31ST MARCH 2025.pdf5 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 31 MARCH 25.pdf4 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT FORM 1 31-03-2025.pdf24 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION BANK ACCOUNT.pdf1 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 31 DEC 2024.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT FORM 1 DATED 31-12-2024.pdf31 Jan 2025
Certificates of CA (Form 3)File: CA CERT FORM 3 31ST DEC 2024_compressed.pdf31 Jan 2025
Certificates of CA (Form 3)File: CA CERT FORM 3 30 SEPT 2024_compressed.pdf12 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT FORM 2 30 SEPT 2024.pdf12 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QULITY ASS CER 23 24 (1).pdf12 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA- ARCHITECT CERTIFICATE NO-07 DATED-30-09-2024.pdf22 Oct 2024
Certificates of CA (Form 3)File: CA CERT FORM 3 31ST MARCH 2024_compressed.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA CERT FORM 3 30 JUNE 2022_compressed.pdf7 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT FORM 30 JUNE 2024.pdf20 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT FORM 2 30 JUNE 2024.pdf20 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT FORM 1 MARCH 2024.pdf3 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 31 MARCH 24.pdf3 May 2024
Certificates of CA (Form 3)File: CA CERT FORM 3 31ST DEC 2023_compressed (1).pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 31 DEC 2023.pdf28 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT FORM 1 FOR RERA 31 -12 -23.pdf27 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT FORM 1 30 JUNE 2023.pdf29 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 30 JUNE 23.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA CERT FORM 5 2022 2023.pdf29 Nov 2023
Certificates of CA (Form 3)File: CA CERT FORM 3 31ST MARCH 2023.pdf25 Nov 2023
Certificates of CA (Form 3)File: CA CERT FORM 3 30 JUNE 2023.pdf25 Nov 2023
Certificates of CA (Form 3)File: CA CERT FORM 3 30 SEPT 2023.pdf25 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT FORM 1 30 SEPT 2023.pdf20 Nov 2023
Building plan approvalFile: SCAN SANCTION PLAN 1 OF 6_compressed.pdf18 Nov 2023
Building plan approvalFile: SCAN SANCTION PLAN 2 OF 6_compressed.pdf18 Nov 2023
Building plan approvalFile: SCAN SANCTION PLAN 3 OF 6_compressed.pdf18 Nov 2023
Building plan approvalFile: SCAN SANCTION PLAN 4 OF 6_compressed.pdf18 Nov 2023
Building plan approvalFile: SCAN SANCTION PLAN 5 OF 6_compressed.pdf18 Nov 2023
Building plan approvalFile: SCAN SANCTION PLAN 6 OF 6_compressed.pdf18 Nov 2023
Building Plan Approval (IOD)File: SCAN SANCTION PLAN 1 OF 6_compressed.pdf18 Nov 2023
Building Plan Approval (IOD)File: SCAN SANCTION PLAN 2 OF 6_compressed.pdf18 Nov 2023
Building Plan Approval (IOD)File: SCAN SANCTION PLAN 3 OF 6_compressed.pdf18 Nov 2023
Building Plan Approval (IOD)File: SCAN SANCTION PLAN 4 OF 6_compressed.pdf18 Nov 2023
Building Plan Approval (IOD)File: SCAN SANCTION PLAN 5 OF 6_compressed.pdf18 Nov 2023
Building Plan Approval (IOD)File: SCAN SANCTION PLAN 6 OF 6_compressed.pdf18 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: REVISE SCAN SANCTION ORDER.pdf18 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 30 SEPT 2023.pdf18 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QULITY ASSURANCE CERT FORM 2A 22 23.pdf18 Nov 2023

How this compares with Sindhudurg

7%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep ASHTVINAYAK GRUHSANKUL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR KHAMDEV NAKA530+ in Sindhudurg

Builder: MR PANKAJ ROHIDAS NARVEKAR

MR PANKAJ ROHIDAS NARVEKAR has 1 registration on MahaRERA, including ASHTVINAYAK GRUHSANKUL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if ASHTVINAYAK GRUHSANKUL is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASHTVINAYAK GRUHSANKUL?

The registered promoter entity is MR PANKAJ ROHIDAS NARVEKAR, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASHTVINAYAK GRUHSANKUL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASHTVINAYAK GRUHSANKUL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASHTVINAYAK GRUHSANKUL?

The professionals named in the filing: Architect: AR NAVIN LAD NIRMITTI ARCHITECT AND INTERIOR DESIGNER LAD; Architect: NAVIN LAD; Engineer: SHIRIRAM JOSHI; Engineer: SUNIL KRISHNA NIRAVDEKAR; Chartered Accountant: MR SUDHIR GANESH NAIK; Chartered Accountant: YATIN DILIP JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASHTVINAYAK GRUHSANKUL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASHTVINAYAK GRUHSANKUL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASHTVINAYAK GRUHSANKUL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.