Home / Browse projects / Sindhudurg, Maharashtra / ASHTVINAYAK GRUHSANKUL
ASHTVINAYAK GRUHSANKUL
RG-MH-24392 · RERA P52900009547 · Last updated on MahaRERA portal: 5 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 7.00 crore secured on the land, in favour of BANK OF MAHARASHTRA, SINDHUDURG ZILLA VAISHYA SAMAJ SAHKARI PATHSAWSTHA MARYADIT PHONDA GHAT
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ASHTVINAYAK GRUHSANKUL is a Others project by MR PANKAJ ROHIDAS NARVEKAR in Sindhudurg, Maharashtra, registered with MahaRERA as P52900009547 on 22 Aug 2017. Possession is promised by 30 Jun 2027. 13 of the 181 units on this registration are recorded sold or booked, and 3 of 44 construction stages are filed complete.
At a glance
Project
- NameASHTVINAYAK GRUHSANKUL
- TypeOthers
- Location
- NH 66
- NEAR KHAMDEV NAKA
- Kshetrafal
- Sawantwadi
- Sindhudurg
- 416510
- Pincode416510
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900009547
- ReraGenie IDRG-MH-24392
Builder
- NameMR PANKAJ ROHIDAS NARVEKAR
- Entity typeOthers
- Named personSUKHAKARTA REAALTY PROP. MR VIVEKANAND ROHIDAS NARVEKAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Aug 2017
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings4 building records
- Documents filed168 files
Current status
Figures as on 5 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PHASE 1 , PUSHP VIHAR, A BUILDING, A WING AND B WING | NA | 8 | 5 | 66 | 47 | 113 |
| PHASE 2, PUSHP VIHAR B BUILDING, C WING | NA | 5 | 5 | 20 | 0 | 20 |
| PHASE 3, PUSHP VIHAR, WING D, WING E AND WING F | NA | 6 | 5 | 48 | 0 | 48 |
| PHASE 4, C BUILDING, WINGS MORESHWAR AND SIDDHIVINAYAK | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 95%.
PHASE 1 , PUSHP VIHAR, A BUILDING, A WING AND B WING64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 95% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 93% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PHASE 2, PUSHP VIHAR B BUILDING, C WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PHASE 3, PUSHP VIHAR, WING D, WING E AND WING F0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PHASE 4, C BUILDING, WINGS MORESHWAR AND SIDDHIVINAYAK0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed33
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| PHASE 1 , PUSHP VIHAR, A BUILDING, A WING AND B WING | 16 | 10 | 26 |
| PHASE 2, PUSHP VIHAR B BUILDING, C WING | 2 | 3 | 5 |
| PHASE 4, C BUILDING, WINGS MORESHWAR AND SIDDHIVINAYAK | 2 | 0 | 2 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| VIVEKANAND ROHIDAS NARVEKAR | Kshetrafal | Sindhudurg |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PHASE 1 , PUSHP VIHAR, A BUILDING, A WING AND B WING | NA | Rs 7.05 cr | Rs 6.43 cr |
| PHASE 3, PUSHP VIHAR, WING D, WING E AND WING F | NA | Rs 3.97 cr | - |
| - | NA | Rs 2.70 cr | Rs 54.00 lakh |
| PHASE 2, PUSHP VIHAR B BUILDING, C WING | NA | Rs 2.38 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR NAVIN LAD NIRMITTI ARCHITECT AND INTERIOR DESIGNER LAD |
| Architect | NAVIN LAD |
| Engineer | SHIRIRAM JOSHI |
| Engineer | SUNIL KRISHNA NIRAVDEKAR |
| Chartered Accountant | MR SUDHIR GANESH NAIK |
| Chartered Accountant | YATIN DILIP JOSHI |
| Chartered Accountant | SUDHIR NAIK AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| MR PANKAJ ROHIDAS NARVEKAR AND VIVEKANAND ROHIDAS NARVEKAR | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed168
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 168 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2017-2018)File: Quality Assurance Certificate 2A- Ashtavinayak Gruh Sankul - Narvekar - 2025-26.pdf | 5 Jun 2026 |
| Withdrawal Update Form 1File: AR CERTIFICATE FORM 1 31-03-2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: AR CERTIFICATE FORM 1 31-03-2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 ENG Certificate FOR ASHTVINAYAK 31ST MARCH 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 ENG Certificate FOR ASHTVINAYAK 31ST MARCH 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE FORM 3 31-3-2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE FORM 3 31-3-2026 MR.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: AR CERTIFICATE FORM 1 31-03-2026.pdf | 19 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 ENG Certificate FOR ASHTVINAYAK 31ST MARCH 2026.pdf | 19 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE FORM 3 31-3-2026 MR.pdf | 19 Apr 2026 |
| Withdrawal Update Form 1File: AR CERT FORM 1 SEPT 2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 1File: AR CERT FORM 1 SEPT 2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 1File: AR CERT FORM 1 DATED 31-12-2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 1File: AR CERT FORM 1 DATED 31-12-2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 2File: ENG CER FORM 2 30 SEPT 25.pdf | 4 Apr 2026 |
| Withdrawal Update Form 2File: ENG CER FORM 2 30 SEPT 25.pdf | 4 Apr 2026 |
| Withdrawal Update Form 2File: ENG CERT FORM 2 31ST DEC 2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 2File: ENG CERT FORM 2 31ST DEC 2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE FORM 3 SEPT 2025 MR_compressed.pdf | 4 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE FORM 3 SEPT 2025_compressed.pdf | 4 Apr 2026 |
| Withdrawal Update Form 3File: CA CERT FORM 3 31ST DEC 2025 mr.pdf | 4 Apr 2026 |
| Withdrawal Update Form 3File: CA CERT FORM 3 DEC 2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 1File: AR CERT FORM 1 JUNE 2025.pdf | 3 Apr 2026 |
| Withdrawal Update Form 1File: AR CERT FORM 1 JUNE 2025.pdf | 3 Apr 2026 |
| Withdrawal Update Form 2File: ENG CER FORM 2 30 JUNE 25.pdf | 3 Apr 2026 |
| Withdrawal Update Form 2File: ENG CER FORM 2 30 JUNE 25.pdf | 3 Apr 2026 |
| Withdrawal Update Form 3File: CA CERT FORM 3 30 TH JUNE 2025 mr.pdf | 3 Apr 2026 |
| Withdrawal Update Form 3File: CA CERT FORM 3 30 TH JUNE 2025.pdf | 3 Apr 2026 |
| Withdrawal Update Form 1File: AR CERT FORM 1 DATED 31-12-2025.pdf | 2 Mar 2026 |
| Withdrawal Update Form 2File: ENG CERT FORM 2 31ST DEC 2025.pdf | 2 Mar 2026 |
| Withdrawal Update Form 3File: CA CERT FORM 3 31ST DEC 2025_compressed.pdf | 2 Mar 2026 |
| Withdrawal Update Form 1File: AR CERT FORM 1 DATED 31-12-2025.pdf | 27 Feb 2026 |
| Withdrawal Update Form 1File: AR CERT FORM 1 DATED 31-12-2025.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: ENG CER FORM 2 31 MARCH 25.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: ENG CERT FORM 2 31 DEC 2025.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: CA CERT FORM 3 31ST DEC 2025_compressed.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: CA CERT FORM 3 31ST DEC 2025_compressed.pdf | 27 Feb 2026 |
| Form 5 (FY 2024-2025)File: CA CERT FORM 5 24 25.pdf | 29 Nov 2025 |
| Certificates of CA (Form 3)File: CA CERT FORM 3 31ST MARCH 2025.pdf | 5 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 31 MARCH 25.pdf | 4 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT FORM 1 31-03-2025.pdf | 24 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION BANK ACCOUNT.pdf | 1 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 31 DEC 2024.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT FORM 1 DATED 31-12-2024.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: CA CERT FORM 3 31ST DEC 2024_compressed.pdf | 31 Jan 2025 |
| Certificates of CA (Form 3)File: CA CERT FORM 3 30 SEPT 2024_compressed.pdf | 12 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT FORM 2 30 SEPT 2024.pdf | 12 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QULITY ASS CER 23 24 (1).pdf | 12 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA- ARCHITECT CERTIFICATE NO-07 DATED-30-09-2024.pdf | 22 Oct 2024 |
| Certificates of CA (Form 3)File: CA CERT FORM 3 31ST MARCH 2024_compressed.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: CA CERT FORM 3 30 JUNE 2022_compressed.pdf | 7 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT FORM 30 JUNE 2024.pdf | 20 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT FORM 2 30 JUNE 2024.pdf | 20 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT FORM 1 MARCH 2024.pdf | 3 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 31 MARCH 24.pdf | 3 May 2024 |
| Certificates of CA (Form 3)File: CA CERT FORM 3 31ST DEC 2023_compressed (1).pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 31 DEC 2023.pdf | 28 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT FORM 1 FOR RERA 31 -12 -23.pdf | 27 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT FORM 1 30 JUNE 2023.pdf | 29 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 30 JUNE 23.pdf | 29 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA CERT FORM 5 2022 2023.pdf | 29 Nov 2023 |
| Certificates of CA (Form 3)File: CA CERT FORM 3 31ST MARCH 2023.pdf | 25 Nov 2023 |
| Certificates of CA (Form 3)File: CA CERT FORM 3 30 JUNE 2023.pdf | 25 Nov 2023 |
| Certificates of CA (Form 3)File: CA CERT FORM 3 30 SEPT 2023.pdf | 25 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT FORM 1 30 SEPT 2023.pdf | 20 Nov 2023 |
| Building plan approvalFile: SCAN SANCTION PLAN 1 OF 6_compressed.pdf | 18 Nov 2023 |
| Building plan approvalFile: SCAN SANCTION PLAN 2 OF 6_compressed.pdf | 18 Nov 2023 |
| Building plan approvalFile: SCAN SANCTION PLAN 3 OF 6_compressed.pdf | 18 Nov 2023 |
| Building plan approvalFile: SCAN SANCTION PLAN 4 OF 6_compressed.pdf | 18 Nov 2023 |
| Building plan approvalFile: SCAN SANCTION PLAN 5 OF 6_compressed.pdf | 18 Nov 2023 |
| Building plan approvalFile: SCAN SANCTION PLAN 6 OF 6_compressed.pdf | 18 Nov 2023 |
| Building Plan Approval (IOD)File: SCAN SANCTION PLAN 1 OF 6_compressed.pdf | 18 Nov 2023 |
| Building Plan Approval (IOD)File: SCAN SANCTION PLAN 2 OF 6_compressed.pdf | 18 Nov 2023 |
| Building Plan Approval (IOD)File: SCAN SANCTION PLAN 3 OF 6_compressed.pdf | 18 Nov 2023 |
| Building Plan Approval (IOD)File: SCAN SANCTION PLAN 4 OF 6_compressed.pdf | 18 Nov 2023 |
| Building Plan Approval (IOD)File: SCAN SANCTION PLAN 5 OF 6_compressed.pdf | 18 Nov 2023 |
| Building Plan Approval (IOD)File: SCAN SANCTION PLAN 6 OF 6_compressed.pdf | 18 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISE SCAN SANCTION ORDER.pdf | 18 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER FORM 2 30 SEPT 2023.pdf | 18 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QULITY ASSURANCE CERT FORM 2A 22 23.pdf | 18 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 168 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ASHTVINAYAK GRUHSANKUL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR KHAMDEV NAKA530+ in Sindhudurg
perto de goa phase R 1
ANKIT VASTU CREATIONS PRIVATE LIMITED
SAWANTWADI ENCLAVE
LANDKRAFT SPACES PRIVATE LIMITED
APNA GHAR
VYANKATESH VASANT DESHPANDE
Riviera Suites
Home and Soul Developers Private Limited
HERITAGE HOMES
HERITAGE REALTORS
Marlin Plots
Home and Soul Developers Private Limited
See every Sindhudurg project, with the district possession charts
Builder: MR PANKAJ ROHIDAS NARVEKAR
MR PANKAJ ROHIDAS NARVEKAR has 1 registration on MahaRERA, including ASHTVINAYAK GRUHSANKUL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if ASHTVINAYAK GRUHSANKUL is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ASHTVINAYAK GRUHSANKUL?
The registered promoter entity is MR PANKAJ ROHIDAS NARVEKAR, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ASHTVINAYAK GRUHSANKUL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ASHTVINAYAK GRUHSANKUL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ASHTVINAYAK GRUHSANKUL?
The professionals named in the filing: Architect: AR NAVIN LAD NIRMITTI ARCHITECT AND INTERIOR DESIGNER LAD; Architect: NAVIN LAD; Engineer: SHIRIRAM JOSHI; Engineer: SUNIL KRISHNA NIRAVDEKAR; Chartered Accountant: MR SUDHIR GANESH NAIK; Chartered Accountant: YATIN DILIP JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ASHTVINAYAK GRUHSANKUL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.