Home / Browse projects / Sindhudurg, Maharashtra / AAKAR ANANT

Registered No litigation declared Others project

AAKAR ANANT

By AAKAR BUILDERS AND DEVELOPERS

RG-MH-23422 · RERA P52900078734 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
63 of 81Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

AAKAR ANANT is a Others project by AAKAR BUILDERS AND DEVELOPERS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900078734 on 8 Jan 2025. Possession is promised by 31 Mar 2028. 18 of the 81 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameAAKAR ANANT
  • TypeOthers
  • Location
    • S.N DESAI CHOWK
    • NEAR SANT RAWOOL MAHARAJ COLLEGE
    • MIDC ROAD
    • KUDAL
    • VENGURLA ROAD
    • Kudal (CT)
    • Kudal
    • Sindhudurg
    • 416520
  • Pincode416520
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900078734
  • ReraGenie IDRG-MH-23422

Builder

  • NameAAKAR BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersPANDURANG V KANDALGAONKAR, GAJANAN PANDURANG KANDALGAONKAR
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2025PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jan 2025
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed49 files

Current status

22%18 of 81 units booked
31.4%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING BNA5424024
BUILDING ANA77312657

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

BUILDING B68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING A33%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes40%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Closed/Covered21
Open Space76
BuildingClosed/CoveredOpen SpaceTotal
BUILDING B162743
BUILDING A54954

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,900 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2025
LandownerVillageDistrict
ANANT SOMA KAMBLIKankavaliSindhudurg

Approvals and building plan

Sanctioning authorityKudal Nagar Panchayat
Permissible FSI4411.94
Proposed, not sanctioned4,412 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRATHAM APARTMENT, NEAR KUDAL HIGH SCHOOL, KUDAL, DIST SINDHUDURG - 416520.
Estimated costRs 10.35 cr
Cost incurredRs 3.25 cr
Work done31.4%
BuildingWingEstimatedIncurred
BUILDING ANARs 7.07 crRs 1.50 cr
BUILDING BNARs 3.03 crRs 1.75 cr
-NARs 25.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNAVIN LAD
EngineerGajanan Kandalgaonkar
Chartered AccountantKumar S Khanolkar
Chartered AccountantYatin D Joshi
PartnerRole in project
AAKAR BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A ENGINEER CERTIFICATE 25-26.pdf9 May 2026
Withdrawal Update Form 1File: AA-Form-1-FY25-26-Q4.pdf7 May 2026
Withdrawal Update Form 2File: AA-Form 2-FY 25-26-Q4.pdf7 May 2026
Withdrawal Update Form 3File: AA-Form 3-FY 25-26-Q4.pdf7 May 2026
Withdrawal Update Form 1File: AA-Form1-FY 25-26-Q3.pdf28 Jan 2026
Withdrawal Update Form 2File: AA-Form 2-FY 25-26-Q3.pdf28 Jan 2026
Withdrawal Update Form 3File: AA-Form 3-FY 25-26-Q3.pdf28 Jan 2026
Withdrawal Update Form 1File: form 1 Q-2 AA.pdf6 Nov 2025
Withdrawal Update Form 2File: ABD-AA-FORM 2-FY 25-26-Q2.pdf6 Nov 2025
Withdrawal Update Form 3File: ABD-AA-FORM 3-FY 25-26-Q2.pdf6 Nov 2025
Form 5 (FY 2024-2025)File: Form 5-ABD-AA-FY 24-25.pdf4 Oct 2025
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE.pdf17 Aug 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE.pdf17 Aug 2025
Withdrawal Update Form 3File: ABD-AA-FORM 3-Fy 25-26-Q1.pdf17 Aug 2025
Form 2A (FY 2024-2025)File: FORM 2A_250702_130746 (1).pdf2 Jul 2025
Form 1File: Form-1.pdf28 Jun 2025
Form 2File: fORM 2.pdf28 Jun 2025
Form 3File: AA- Self Declaration.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: QPR-FY 24-25-Q4.pdf28 Jun 2025
Other - LegalFile: Partership Deed.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Annexure D Form 3_11zon.pdf5 Dec 2024
Building plan approvalFile: PLAN A AND B.pdf4 Dec 2024
Layout approvalFile: LAYOUT PLAN AAKAR ANANT.pdf4 Dec 2024
PAN CardFile: ABD-pan.pdf4 Dec 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf4 Dec 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE CONCERNED TO FINANCE.pdf4 Dec 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL.pdf4 Dec 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN AAKAR ANANT.pdf4 Dec 2024
Proforma of Allotment letterFile: Allotment Letter.pdf4 Dec 2024
Declaration in FORM BFile: Form - B - Partner Final.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf4 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf4 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Bandhakam Parvangi.pdf4 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: cc verification mail.pdf4 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN A AND B.pdf4 Dec 2024
Other - LegalFile: Agreement Dhuri.pdf4 Dec 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-1.pdf4 Dec 2024
CERSAI detailsFile: CERSAI UNDERTAKING.pdf4 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf4 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation for Allotment Letter.pdf4 Dec 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE CONCERNED TO FINANCE.pdf4 Dec 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL.pdf4 Dec 2024
Other - FinanceFile: No Three bank account Required.pdf4 Dec 2024
Other - TechnicalFile: ANNEXURE-A ORDER 50.pdf4 Dec 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT WITH RESPECT TO THE MODEL AGREEMENT.pdf4 Dec 2024
Proforma of Agreement for saleFile: NEW AGREEMENT TO SELL RERA_FORMAT.pdf4 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of intrest 1ST PARTNER.pdf4 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Opening of RERA Designated Bank Account (2).pdf4 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured Unsecured Finance (1).pdf4 Dec 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
NEELGIRI HEIGHTS6A1A1-17 CTS 3443 MIDC ROAD SHRIRAMWADI KUDAL 41652066CompletedDec 2024Apr 2024

How this compares with Sindhudurg

22%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep AAKAR ANANT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VENGURLA ROAD530+ in Sindhudurg

2 kmAAKAR ANANTCompleted 18Lapsed / revoked 13Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: AAKAR BUILDERS AND DEVELOPERS

AAKAR BUILDERS AND DEVELOPERS has 4 registrations on MahaRERA, including PRABHAT AAKAR CITY and AAKAR INSIGNIA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if AAKAR ANANT is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AAKAR ANANT?

The registered promoter entity is AAKAR BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AAKAR ANANT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AAKAR ANANT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AAKAR ANANT?

The professionals named in the filing: Architect: NAVIN LAD; Engineer: Gajanan Kandalgaonkar; Chartered Accountant: Kumar S Khanolkar; Chartered Accountant: Yatin D Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AAKAR ANANT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AAKAR ANANT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AAKAR ANANT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.