Home / Browse projects / Sindhudurg, Maharashtra / YOG ANAND
YOG ANAND
By Abome Real Estate Private Limited
RG-MH-06879 · RERA P52900055557 · Last updated on MahaRERA portal: 22 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YOG ANAND is a Plotted project by Abome Real Estate Private Limited in Sindhudurg, Maharashtra, registered with MahaRERA as P52900055557 on 2 Apr 2024. Possession is promised by 31 Dec 2031. 0 of the 95 units on this registration are recorded sold or booked. 2 complaints are on record with the regulator.
At a glance
Project
- NameYOG ANAND
- TypePlotted
- Location
- YOG CITY
- Maneri
- Dodamarg
- Sindhudurg
- 416512
- Pincode416512
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900055557
- ReraGenie IDRG-MH-06879
Builder
- NameAbome Real Estate Private Limited
- Entity typeCompany
- GSTIN06AADCI4748R2ZW
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Apr 2024
- Promised completion31 Dec 2031
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed53 files
Current status
Figures as on 22 Jul 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 22 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SPACE DESIGN GROUP |
| Engineer | SPACE DESIGN GROUP |
| Chartered Accountant | S PRAKASH KUSHWAHA AND CO |
| Partner | Role in project |
|---|---|
| Abome Real Estate Private Limited | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500140 | Bhakti Achrekar | VINAY JAYPRAKASH MAURYA | 22/09/2025 |
| CC12600009 | SAPNA MUKHI | VINAY JAYPRAKASH MAURYA | 01/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2031
Documents filed53
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect certificate Q4 Final.pdf | 22 Jul 2025 |
| Form 2File: Engi Certificate Form 2 Final.pdf | 22 Jul 2025 |
| Form 3File: Q4 2024-25 CA CERTIFICATE final.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DETAILS UPTO MARCH 2025 final.pdf | 22 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE APR TO JUN 2025 FINAL.pdf | 19 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 (25-26) - Vinay final.pdf | 19 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE FORM 2 VJM FINAL.pdf | 19 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD INVENTORY.pdf | 19 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENG CERTIFICATE FORM 2A VJM FINAL.pdf | 19 Jul 2025 |
| Form 1File: ARCHITECT CERTIFICATE APR TO JUN 2025 FINAL.pdf | 19 Jul 2025 |
| Form 2File: ENG CERTIFICATE FORM 2 VJM FINAL.pdf | 19 Jul 2025 |
| Form 3File: Form-3 (25-26) - Vinay final.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD INVENTORY.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Q4 Final.pdf | 17 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 2024-25 CA CERTIFICATE final.pdf | 17 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Certificate Form 2 Final.pdf | 17 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DETAILS UPTO MARCH 2025 final.pdf | 17 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: engineer cetificate 2A final.pdf | 17 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certifcate 04.pdf | 12 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Q3 Certificate Vinay Maurya 01.pdf | 12 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Vinay Maurya final.pdf | 12 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventary vinay maurya.pdf | 12 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 Vinay Maurya final.pdf | 12 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 certificate.pdf | 12 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 01.pdf | 13 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 02.pdf | 13 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 03.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 01.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 02.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 03.pdf | 13 Nov 2024 |
| Other - LegalFile: Division Documents.pdf | 12 Mar 2024 |
| Other - LegalFile: GURUDAS KASHINATH NAIK PURCHASE DEED MANERI VINAY MAURYA 964-20020220211_16343779_compress | 4 Mar 2024 |
| Layout approvalFile: Vinay Maurya Layout.pdf | 15 Feb 2024 |
| Building plan approval or NA orderFile: Vinay Maurya Building Sanction.pdf | 15 Feb 2024 |
| Copy of the legal title reportFile: VINAY MAURYA search 2023 rera (05) final.pdf | 15 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Vinay Maurya Layout.pdf | 15 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Vinay Maurya Building Sanction.pdf | 15 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: VINAY MAURYA CC DECLARATION.pdf | 15 Feb 2024 |
| Declaration about Commencement CertificateFile: Vinaj Ji whole.pdf | 15 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate Vinay Maurya .pdf | 15 Feb 2024 |
| Other - TechnicalFile: VINAY MAURYA NA PLAN DECLARATION.pdf | 15 Feb 2024 |
| Proforma of Agreement for saleFile: Final Agreement To Sale New Vinay.pdf | 20 Nov 2023 |
| Proforma of Allotment letterFile: Final Allotment Letter New Nov.pdf | 20 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: Daviation Report Vinay New Nov Allotment.pdf | 20 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: Daviation Report Vinay New Nov ATS.pdf | 20 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: VINAY MAURYA INT CERTI.pdf | 31 Oct 2023 |
| CERSAI detailsFile: Vinay Maurya 1.pdf | 28 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: VINAY MAURYA BANK DECLARATION.pdf | 20 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE VINAY.pdf | 13 Oct 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE VINAY.pdf | 13 Oct 2023 |
| Declaration in FORM BFile: vinay maurya form B.pdf | 13 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Vinay Ji.pdf | 12 Oct 2023 |
| PAN CardFile: vinay pan card.pdf | 11 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 53 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep YOG ANAND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near YOG CITY530+ in Sindhudurg
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
AXIS BLUES
EEJAK HOLDINGS PRIVATE LIMITED
AXIS BLUES
EEJAK HOLDINGS PRIVATE LIMITED
AXIS BLUES
EEJAK HOLDINGS PRIVATE LIMITED
AXIS LAKE CITY
GIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED
YOG CITY PH 1
Jayprakash Ramawadh Maurya
SATERI TOWERS
PRASAD RAGHUNATH PANGAM
See every Sindhudurg project, with the district possession charts
Builder: Abome Real Estate Private Limited
Abome Real Estate Private Limited has 1 registration on MahaRERA, including YOG ANAND. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if YOG ANAND is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YOG ANAND?
The registered promoter entity is Abome Real Estate Private Limited, a company as per the filing. Its GSTIN 06AADCI4748R2ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YOG ANAND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against YOG ANAND?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for YOG ANAND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YOG ANAND?
The professionals named in the filing: Architect: SPACE DESIGN GROUP; Engineer: SPACE DESIGN GROUP; Chartered Accountant: S PRAKASH KUSHWAHA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YOG ANAND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback