Red flags

  • Completion date moved by 60 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Jun 2031Possession promisedmoved 60 months from the original
10 of 55Construction stages doneacross 5 buildings; furthest along: Stilt Floor, 67%
102 of 114Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 148 documents Report an error

HERITAGE HOMES is a Residential / Group Housing project by HERITAGE REALTORS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900008683 on 19 Aug 2017. Possession is promised by 30 Jun 2031. The completion date has moved by 60 months from the original filing. 12 of the 114 units on this registration are recorded sold or booked, and 10 of 55 construction stages are filed complete.

At a glance

Project

  • NameHERITAGE HOMES
  • TypeResidential / Group Housing
  • Location
    • New Khaskilwada
    • Near Sawantwadi Police Station
    • Majgaon (CT)
    • Sawantwadi
    • Sindhudurg
    • 416510
  • Pincode416510
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900008683
  • ReraGenie IDRG-MH-26446

Builder

  • NameHERITAGE REALTORS
  • Entity typePartnership
  • PartnersAMIT VITHALBHAI PATEL, VITHALBHAI DEVJIBHAI PATEL
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredAug 2017First promiseJun 2026Revised toJun 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion30 Jun 2031
  • Revised completionRevised to 30 Jun 2031 (originally 30 Jun 2026)
  • Buildings5 building records
  • Documents filed148 files

Current status

11%12 of 114 units booked
43.9%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing - ANA8618018
Wing - BNA8630030
Wing - CNA8624024
Wing - DNA8618018
Wing - ENA8624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Stilt Floor, at 67%.

Wing - A18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing - B18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing - C44%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor67%
Slabs of Super Structure67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises67%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks21%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.59%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing - D44%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor67%
Slabs of Super Structure67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises67%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks21%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.59%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing - E44%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor67%
Slabs of Super Structure67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises67%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks21%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.59%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes9%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes9%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Closed/Covered46
Open Space98
BuildingClosed/CoveredOpen SpaceTotal
Wing - A202
Wing - B202
Wing - C202
Wing - D202
Wing - E3898136

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,886 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySAWANTWADI NAGARPARISHAD
Permissible FSI9377.34
Proposed, not sanctioned7,685 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLUKHI APT OPP DAHISAR POLICE STATION DAHISAR EAST
Estimated costRs 10.74 cr
Cost incurredRs 4.72 cr
Work done43.92%
BuildingWingEstimatedIncurred
Wing - ANARs 3.01 crRs 55.73 lakh
Wing - CNARs 2.11 crRs 39.01 lakh
Wing - ENARs 1.85 crRs 1.67 cr
Wing - BNARs 1.60 crRs 29.65 lakh
Wing - DNARs 1.56 crRs 1.35 cr
-NARs 60.79 lakhRs 45.25 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGLOBITA ASSOCIATES
EngineerB V NAIK
EngineerSK Consultants & Engineers
EngineerRajesh Tailor
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantShailesh Kakulal Kataria
Chartered AccountantParth M Mehta & Co
PartnerRole in project
HERITAGE REALTORS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27072621889Jun 2026 → Jun 2031

Reason as filed by the promoterAccordingly, in order to ensure the successful completion of the project and safeguard its long-term viability, the Promoter has undertaken a comprehensive review of the project and is in the process of revising the architectural plans and development layout in accordance with prevailing market requirements and applicable statutory provisions. The Promoter submits that the delay is attributable to genuine commercial and regulatory circumstances and not to any deliberate default or lack of diligence. The Promoter remains fully committed to completing the project in compliance with the provision

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2031

Documents filed148

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 148 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q4 25-26 Heritage Homes.pdf9 Jul 2026
Withdrawal Update Form 1File: Form 1 Q1 26-27 Heritage Realtors.pdf9 Jul 2026
Withdrawal Update Form 2File: Form 2 Q4 25-26 Heritage Homes new.pdf9 Jul 2026
Withdrawal Update Form 2File: Form 2 Q1 26-27 Heritage Realtors FINAL.pdf9 Jul 2026
Withdrawal Update Form 3File: Form 3 Q4 25-26 Heritage Homes.pdf9 Jul 2026
Withdrawal Update Form 3File: Form 3 Q1 26-27 Heritage Realtors.pdf9 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A 25-26 Heritage Homes FINAL.pdf9 Jul 2026
Form 2File: Heritage Realtors_Form 2_Mar 2024.pdf4 Jun 2026
Form 1File: 31032024 FORM 1 Architect Certificate Rera Heritage.pdf4 Jun 2026
Form 3File: Heritage Realtors_Form 3_March 2024_.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: March 2024.pdf4 Jun 2026
Form 1File: 30092024 FORM 1 Architect Certificate Rera Heritage.pdf4 Jun 2026
Form 2File: Heritage Realtors_Form 2_June 2024.pdf4 Jun 2026
Form 3File: Heritage Realtors_Form 3_Jun 2024_.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: June 2024.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: Dec 2024.pdf4 Jun 2026
Form 1File: 30122024 FORM 1 Architect Certificate Rera Heritage.pdf4 Jun 2026
Form 2File: Heritage Realtors_Form 2_Dec 2024.pdf4 Jun 2026
Form 3File: Heritage Realtors_Form 3_Dec 2024_.pdf4 Jun 2026
Form 1File: 30 06 2025 FORM 1 Architect Certificate Rera Heritage.pdf4 Jun 2026
Form 2File: Heritage Realtors_Form 2_June 2025.pdf4 Jun 2026
Form 3File: Heritage Realtors_Form 3_Jun 2025_.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: June 2025.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sept 2025.pdf4 Jun 2026
Form 2File: Heritage Realtors_Form 2_Sept 2025.pdf4 Jun 2026
Form 1File: 30 09 2025 FORM 1 Architect Certificate Rera Heritage.pdf4 Jun 2026
Form 3File: Heritage Realtors_Form 3_Sept 2025.pdf4 Jun 2026
Form 3File: Heritage Realtors_Form 3_Dec 2025_.pdf4 Jun 2026
Form 2File: Heritage Realtors_Form 2_Dec 2025.pdf4 Jun 2026
Form 1File: 30 12 2025 FORM 1 Architect Certificate Rera Heritage.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: Dec 2025.pdf4 Jun 2026
Form 5 (FY 2023-2024)File: Form 5- 01-04-23 to 31-3-24.pdf4 Jun 2026
Form 5 (FY 2024-2025)File: Form 5- 01-04-24 to 31-3-25.pdf4 Jun 2026
Form 5 (FY 2025-2026)File: Form 5- 01-04-25 to 31-3-26.pdf4 Jun 2026
Form 1File: 31 06 2023 FORM 1 Architect Certificate Rera Heritage.pdf3 Jun 2026
Form 2File: Heritage Realtors_Form 2_Jun 2023.pdf3 Jun 2026
Form 3File: Heritage Realtors_Form 3_June 2023.pdf3 Jun 2026
Disclosure of Sold and Booked InventoryFile: Heritage Realtors_Sold Booked Inventory_Jun 2023.pdf3 Jun 2026
Disclosure of Sold and Booked InventoryFile: Heritage Realtors_Sold Booked Inventory_Sep 2023.pdf3 Jun 2026
Form 1File: 31 09 2023 FORM 1 Architect Certificate Rera Heritage.pdf3 Jun 2026
Form 2File: Heritage Realtors_Form 2_Sept 2023.pdf3 Jun 2026
Form 3File: Heritage Realtors_Form 3_Sept 2023.pdf3 Jun 2026
Form 3File: Heritage Realtors_Form 3_Dec 2023.pdf3 Jun 2026
Form 1File: 31 12 2023 FORM 1 Architect Certificate Rera Heritage.pdf3 Jun 2026
Form 2File: Heritage Realtors_Form 2_Dec2023.pdf3 Jun 2026
Disclosure of Sold and Booked InventoryFile: Heritage Realtors_Sold Booked Inventory_Dec 2023.pdf3 Jun 2026
Proforma of Agreement for saleFile: Rera Agreement For Sale - Sawantwadi.pdf20 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -Heritage Homes as on 31-03-2024.pdf21 Jun 2024
Certificates of CA (Form 3)File: Form 3 -Heritage Homes as on 31-03-2024.pdf21 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-2024 Heritage Homes.pdf8 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -Heritage Homes as on Dec 2023.pdf13 Mar 2024
Certificates of CA (Form 3)File: Form 3 -Heritage Homes as on 31-12-2023.pdf13 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Heritage Homes as on June 2023.pdf5 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Heritage Homes as on September 2023.pdf5 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Heritage Homes as on December 2023.pdf5 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -Heritage Homes as on 30th June 2023.pdf4 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -Heritage Homes as on September 2023.pdf4 Jan 2024
Certificates of CA (Form 3)File: Form 3 -Heritage Homes as on 30th June 2023.pdf4 Jan 2024
Certificates of CA (Form 3)File: Form 3 -Heritage Homes as on 30th Sept 2023.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Scan Annexure F.pdf14 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 03 2019 FORM 1 Architect Certificate Rera Heritage.pdf10 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 03 2020 FORM 1 Architect Certificate Rera Heritage.pdf10 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 03 2021 FORM 1 Architect Certificate Rera Heritage.pdf10 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 03 2022 FORM 1 Architect Certificate Rera Heritage.pdf10 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 06 2022 FORM 1 Architect Certificate Rera Heritage.pdf10 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 09 2022 FORM 1 Architect Certificate Rera Heritage.pdf10 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2022 FORM 1 Architect Certificate Rera Heritage.pdf10 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 03 2023 FORM 1 Architect Certificate Rera Heritage.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 03 2021 FORM 1 Architect Certificate Rera Heritage.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 03 2022 FORM 2.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 06 2022 FORM 2.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 09 2022 FORM 2.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 12 2022 FORM 2.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 06 2022 FORM 2.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 09 2022 FORM 2.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 12 2022 FORM 2.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 03 2023 FORM 2.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 12 2022 FORM 2.pdf10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a 31 03 2023.pdf10 Aug 2023
Certificates of CA (Form 3)File: Form 3 Mar 19 with DSC.pdf10 Aug 2023

How this compares with Sindhudurg

11%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 60 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep HERITAGE HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Sawantwadi Police Station530+ in Sindhudurg

2 kmHERITAGE HOMESCompleted 31Lapsed / revoked 11Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: HERITAGE REALTORS

HERITAGE REALTORS has 2 registrations on MahaRERA, including HERITAGE PRIDE and HERITAGE HOMES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if HERITAGE HOMES is delayed beyond 30 Jun 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HERITAGE HOMES?

The registered promoter entity is HERITAGE REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HERITAGE HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HERITAGE HOMES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HERITAGE HOMES?

The professionals named in the filing: Architect: GLOBITA ASSOCIATES; Engineer: B V NAIK; Engineer: SK Consultants & Engineers; Engineer: Rajesh Tailor; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Shailesh Kakulal Kataria. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HERITAGE HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HERITAGE HOMES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HERITAGE HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.