Home / Browse projects / Sindhudurg, Maharashtra / AXIS LAKE CITY

Registration lapsed No litigation declared Mixed project

AXIS LAKE CITY

By GIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED

RG-MH-28736 · RERA P52900026853 · Last updated on MahaRERA portal: 13 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 18 months past the filed date
  • 27 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Apr 2025Possession promised18 months past this date
0 of 11Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
99 of 99Units unsoldnot recorded sold or booked
27Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

AXIS LAKE CITY is a Mixed project by GIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED in Sindhudurg, Maharashtra, registered with MahaRERA as P52900026853 on 31 Oct 2020. Possession was promised by 30 Apr 2025 and is now 18 months past that date. 0 of the 99 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 27 complaints are on record with the regulator.

At a glance

Project

  • NameAXIS LAKE CITY
  • TypeMixed
  • Location
    • AXIS BLUES
    • Maneri
    • Dodamarg
    • Sindhudurg
    • 416512
  • Pincode416512
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900026853
  • ReraGenie IDRG-MH-28736

Builder

  • NameGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorPRAVEEN KUSHWAHA

Key dates

18 months past promisethis monthRegisteredOct 2020PromisedApr 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Oct 2020
  • Promised completion30 Apr 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed44 files

Current status

0%0 of 99 units booked

Figures as on 13 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAKE CITY PLAZANA22022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

LAKE CITY PLAZA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 13 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,785 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
JAYPRAKASH R MAURYAThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTehsildar
Permissible FSI496.0
Proposed, not sanctioned496 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR 62 NOIDA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace design Group
EngineerSpace design Group
Chartered AccountantSatya Prakash Kushwaha
PartnerRole in project
GIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED-

Complaints filed with MahaRERA27

Case no.ComplainantRespondentFiled
CC12400761ranjit kumarGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED13/11/2024
CC12602782Kinjal Kunal ZinzuvadiyaGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED13/05/2026
CC12602882Clint PereiraGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED16/05/2026
CC12603047Arif ValliyangalGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED23/05/2026
CC12602814Prithipal Singh AswalGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED14/05/2026
CC12602815Prithipal Singh AswalGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED14/05/2026
CC12602892Akshi SinghGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED17/05/2026
CC12602893Akshi SinghGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED17/05/2026
CC12602926Sujit VaidyaGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED18/05/2026
CC12602952Pradeep KumarGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED19/05/2026
CC12602925Shaji ThomasGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED18/05/2026
CC12602946Shaji ThomasGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED19/05/2026
CC12602994Prithvi Narayan PuvvadaGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED20/05/2026
CC12603055Fazal Ahmed Mohammed Ali ShaikhGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED23/05/2026
CC12603056Fazal Ahmed Mohammed Ali ShaikhGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED23/05/2026
CC12603057Fazal Ahmed Mohammed Ali ShaikhGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED23/05/2026
CC12603054Mohammed AsifGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED23/05/2026
CC12603068Kusa BabuGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED23/05/2026
CC12603067Sanjay WattalGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED23/05/2026
CC12603134Ranganath Joseph KallubhaviGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED26/05/2026
CC12603172Balakrishna Pillai Chandra Kumari Srikanda NairGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED27/05/2026
CC12603173Balakrishna Pillai Chandra Kumari Srikanda NairGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED27/05/2026
CC12603174Annette Carmilla D SouzaGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED27/05/2026
CC12603166Chandra ShekarGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED27/05/2026
CC12603251Srikanth Varma RacherlaGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED30/05/2026
CC12603528Shaik Allahbakash Shakeer hussainGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED08/06/2026
CC12603509Vijaya Dipakrao PanjabiGIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED06/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Q1 FY 24-25.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 23-24.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 23-24.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 23-24.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 24-25.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 24-25.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 23-24.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 GIPL Q3 FY 23-24.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 GIPL Q4 FY 23-24.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 GIPL Q1 FY 24-25.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 GIPL Q2 FY 24-25.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A GIPL FY 22-23.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A GIPL FY 23-24.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 GIPL FY 23-24.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 23-24 Qtr1 GIPL.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 24-25 Qtr2 GIPL.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 24-25 Qtr1 GIPL.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 23-24 Qtr4 GIPL.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 23-24 Qtr3 GIPL.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 23-24 Qtr2 GIPL.pdf22 Nov 2024
Proforma of Agreement for saleFile: Agreement to sale.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Giriraj Form-3.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Giriraj Form-5.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Giriraj-21.pdf29 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Giriraj-22-min.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 Giriraj-21.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 Giriraj-22.pdf29 Mar 2023
Disclosure of sold/ booked inventoryFile: Lake City.pdf30 Jul 2021
Declaration about Commencement CertificateFile: GIRIRAJJI LAKE CITY.pdf10 Jul 2021
Declaration in FORM BFile: JP Declaration 1.pdf28 Oct 2020
Layout approvalFile: Approval Layout plan PDF photo print.pdf27 Oct 2020
Copy of Layout Approval (in case of layout)File: Approval Layout plan PDF photo print.pdf27 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: NA order PDF print.pdf27 Oct 2020
Declaration in FORM BFile: Form b Praveen Sir.pdf27 Oct 2020
Status of ConveyanceFile: Document.pdf27 Oct 2020
Proforma of Allotment letterFile: ATS.pdf26 Oct 2020
Building plan approval or NA orderFile: Building sanction plan.PDF23 Oct 2020
PAN CardFile: Girirrajji Pan Card.pdf23 Oct 2020
Copy of the legal title reportFile: Title Report-min.pdf23 Oct 2020
Details of encumbrancesFile: Encumbrance certifiacte.pdf23 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Building sanction plan.PDF23 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf23 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect Certificate.pdf23 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certifiacte.pdf23 Oct 2020

How this compares with Sindhudurg

0%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is among them

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep AXIS LAKE CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AXIS BLUES530+ in Sindhudurg

2 kmAXIS LAKE CITYCompleted 3Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: GIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED

GIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED has 1 registration on MahaRERA, including AXIS LAKE CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What does it mean that AXIS LAKE CITY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AXIS LAKE CITY is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AXIS LAKE CITY?

The registered promoter entity is GIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AXIS LAKE CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AXIS LAKE CITY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AXIS LAKE CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AXIS LAKE CITY?

The professionals named in the filing: Architect: Space design Group; Engineer: Space design Group; Chartered Accountant: Satya Prakash Kushwaha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AXIS LAKE CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AXIS LAKE CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AXIS LAKE CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.