ATRINANDAN

By SHREE DATT ENTERPRISES

RG-MH-18482 · RERA P52900077378 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
May 2031Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 73%
55 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

ATRINANDAN is a Others project by SHREE DATT ENTERPRISES in Sindhudurg, Maharashtra, registered with MahaRERA as P52900077378 on 9 Aug 2024. Possession is promised by 31 May 2031. 16 of the 71 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameATRINANDAN
  • TypeOthers
  • Location
    • MANGAON NANELI ROAD
    • KATTAGAON
    • Kudal
    • Sindhudurg
    • 416520
  • Pincode416520
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900077378
  • ReraGenie IDRG-MH-18482

Builder

  • NameSHREE DATT ENTERPRISES
  • Entity typePartnership
  • PartnersJAYWANT MAHADEV PAWASKAR, RADHIKA JAYWANT PAWASKAR, SANTOSH VINAYAK SAWANT, SANAVI SANTOSH SAWANT, SINDHIYA GHANASHYAM PAWASKAR, GHANSHYAM BHASKAR PAWASKAR
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2024PromisedMay 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2024
  • Promised completion31 May 2031
  • Revised completionNone
  • Buildings2 building records
  • Documents filed58 files

Current status

23%16 of 71 units booked
33.2%Work done, per cost certificate

Figures as on 27 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ATRINANDAN BUILDING ANA66321749
ATRINANDAN BUILDING BNA6616622

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 73%.

ATRINANDAN BUILDING A28%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure73%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ATRINANDAN BUILDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered2
Open Space85
BuildingClosed/CoveredOpen SpaceTotal
ATRINANDAN BUILDING A17172
ATRINANDAN BUILDING B11415

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025
LandownerVillageDistrict
SIDDHESH NAGESH PALAVMangaonSindhudurg

Approvals and building plan

Sanctioning authoritySINDHUDURG TOWN PLANNING AUTHORITY
Permissible FSI5049.6
Proposed, not sanctioned3,318 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAXMI CHOWK OPP TO NATTA WACHNALAY BANDA
Estimated costRs 4.54 cr
Cost incurredRs 1.51 cr
Work done33.18%
BuildingWingEstimatedIncurred
ATRINANDAN BUILDING ANARs 4.08 crRs 1.48 cr
-NARs 30.00 lakhRs 3.00 lakh
ATRINANDAN BUILDING BNARs 16.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCONCEPT DESIGN
EngineerCONCEPT DESIGN
Chartered AccountantSUDHIR NAIK AND ASSOCIATES
PartnerRole in project
SHREE DATT ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2031

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf27 May 2026
Withdrawal Update Form 2File: FORM 2.pdf27 May 2026
Withdrawal Update Form 3File: FORM 3.pdf27 May 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECTS CERTIFICATE.pdf19 Jan 2026
Withdrawal Update Form 2File: FORM 2 ENGINEERS CERTIFICATE.pdf19 Jan 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE-compressed.pdf19 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf19 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf19 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf19 Oct 2025
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE.PDF19 Jul 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE.PDF19 Jul 2025
Withdrawal Update Form 3File: Q1 2025-26 FORM 3.pdf19 Jul 2025
Commencement certificateFile: commencement certificate.pdf17 Jul 2025
Form 1File: FORM 1 01-10-2024.pdf17 Jul 2025
Form 2File: FORM 2 1-10-2024.pdf17 Jul 2025
Form 3File: FORM 3 25-11-24.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & booked inventory.pdf17 Jul 2025
Form 1File: ATRI-FORM 1 Q3.pdf17 Jul 2025
Form 2File: ATRI-FORM 2 Q3.pdf17 Jul 2025
Form 3File: ATRI-FORM 3 Q3.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & booked inventory.pdf17 Jul 2025
Form 1File: ATRI-FORM 1 Q4.pdf17 Jul 2025
Form 2File: ATRI-FORM 2 Q4.pdf17 Jul 2025
Form 3File: ATRI-FORM 3 Q4.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & booked inventory.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 01-10-2024.pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 25-11-24.pdf4 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 1-10-2024.pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf16 Jul 2024
Declaration in FORM BFile: Form B affidavit Promoter.pdf4 Jul 2024
Other - TechnicalFile: MAIL SCREEN SHOT.pdf18 Jun 2024
Layout approvalFile: BLDG SACTION PLAN A.pdf10 Jun 2024
Layout approvalFile: BLDG SACTION PLAN B.pdf10 Jun 2024
Building plan approvalFile: BLDG SACTION PLAN A.pdf10 Jun 2024
Building plan approvalFile: BLDG SACTION PLAN B.pdf10 Jun 2024
PAN CardFile: Pancard.pdf10 Jun 2024
Copy of the legal title reportFile: SEARCH REPORT.pdf10 Jun 2024
Details of encumbrances concerned to FinanceFile: encumbrance finance.pdf10 Jun 2024
Details of encumbrances concerned to FinanceFile: encumbrance Legal.pdf10 Jun 2024
Details of encumbrances concerned to LegalFile: encumbrance finance.pdf10 Jun 2024
Details of encumbrances concerned to LegalFile: encumbrance Legal.pdf10 Jun 2024
Copy of Layout Approval (in case of layout)File: BLDG SACTION PLAN A.pdf10 Jun 2024
Copy of Layout Approval (in case of layout)File: BLDG SACTION PLAN B.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: BLDG SACTION PLAN A.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: BLDG SACTION PLAN B.pdf10 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: SANCTIONED ORDER.pdf10 Jun 2024
Declaration about Commencement CertificateFile: commencement certificate.pdf10 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.PDF10 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.PDF10 Jun 2024
CERSAI detailsFile: declaration for cersai.pdf10 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A partner.pdf10 Jun 2024
Proforma of Agreement for saleFile: Model_agreement for sale.pdf10 Jun 2024
Proforma of Allotment letterFile: Allotment letter.pdf10 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf10 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation report ALLOTMENT.pdf10 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report agreement.pdf10 Jun 2024
Other - TechnicalFile: Annexure A.pdf10 Jun 2024
Other - TechnicalFile: MAIL SCREENSHOT.pdf10 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
GURUPUSHPA APARTMENTP52900015067DONGAR ALI, SindhudurgJan 2018CompletedDec 2022May 2019

How this compares with Sindhudurg

23%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep ATRINANDAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATTAGAON530+ in Sindhudurg

Builder: SHREE DATT ENTERPRISES

SHREE DATT ENTERPRISES has 2 registrations on MahaRERA, including GURUPUSHPA APARTMENT and ATRINANDAN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if ATRINANDAN is delayed beyond 31 May 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATRINANDAN?

The registered promoter entity is SHREE DATT ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATRINANDAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATRINANDAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATRINANDAN?

The professionals named in the filing: Architect: CONCEPT DESIGN; Engineer: CONCEPT DESIGN; Chartered Accountant: SUDHIR NAIK AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATRINANDAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATRINANDAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATRINANDAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.